ML20057B308

From kanterella
Revision as of 03:07, 13 March 2020 by StriderTol (talk | contribs) (StriderTol Bot insert)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Forwards Monthly Operating Rept for Aug 1993 for WCGS & Revised Pages to June & Jul 1993 Repts
ML20057B308
Person / Time
Site: Wolf Creek Wolf Creek Nuclear Operating Corporation icon.png
Issue date: 09/13/1993
From: Maynard O
WOLF CREEK NUCLEAR OPERATING CORP.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML20057B309 List:
References
WO-93-0161, WO-93-161, NUDOCS 9309210181
Download: ML20057B308 (1)


Text

-

l

~

s WTaLF CREEK NUCLEAR OPERATING CORPORATION 1

4 Otto L Maynard vice neent mant opmuons September 13, 1993 l WO 93-0161 r

U. S. Nuclear' Regulatory Commission ATTN: Document Control Desk Mall Station F1-137 Washington, D. C. 20555

{

Subject:

Docket No. 50-482: August, 1993. Monthly ,

Operating Report Gentlemen:  ;

Attached is the August, 1993, Monthly Operating Report for Wolf Greek Generating Station. This submittal is being made in accordance with the requirements of Technical Specification 6.9.1.8.

Also attached are revised pages to the June and July, 1993, Monthly [

Operating Reports which have been revised to correct discrepancies contained in the original submittals. The Maximum Dependable Capacity (MDC) was changed from 1131 MWe-Net to 1134 MWe-Net on June 1, 1993, as a result of MOKAN power pool capabilities testing.

Very truly yours,

^ ,

&W / $/)4XAs (

/

Otto L. Maynard Vice President Plant Operations OLM/jan Attachments (3)  !

cc W. D. Johnson (NRC), w/a J. L. M11hoan (NRC), w/a G. A. Pick (NRC), w/a  ;

V. D. Reckley (NRC), w/a I

2000 %

/

PC. Box 411/ Burhngton. KS 06839 / Phone: (316) 3644931 9309210181 930913 P* An Equal Opp 0rtunity Employer M T rHC/ VET ,

PDR ADOCK 05000482 p, {

R PDR C;