Revised Page to Monthly Operating Rept for Jul 1993 for WCGS
ML20057B316
Person / Time
Site: Wolf Creek Wolf Creek Nuclear Operating Corporation icon.png
Issue date: 07/31/1993
From: Mike Williams
WOLF CREEK NUCLEAR OPERATING CORP.
To:
Shared Package
ML20057B309 List:
References
NUDOCS 9309210189
Download: ML20057B316 (1)


Text

, . _ . , . .

'Attachmeh't 3 to WO 93-0161 Revision 1 OPERATING DATA REPORT j DOCKET NO. 482 i WOLF CREEK GENERATING STATION l WOLF CREEK NUCLEAR OPERATING CORPORATION l DATE 09-01-93 COMPLETED BY M. Williams TELEPHONE 316-364-8831 '

OPERATING STATUS l

1. Reporting Period: July. 1993 Gross Hours in Reporting Period: 744
2. Currently Authorized Power Level (MWt): 3411 Max. Depend. Capacity (MWe-Net): 1134 Design Electrical Rating-(MWe-Net): 1170
3. Power Level to Which Restricted (If Any)(MWe-Net): N/A
4. Reasons for restriction (If Any): N/A ,

This Month Yr. to Date Cumulative  !

5. Number of Hours Reactor was Critical 744.0 3.386.9 54.689.4
6. Reactor Reserve Shutdown Hours 0.0 0.0 339.8 .
7. Hours Generator on Line 744.0 3.328.6 53.980.4
8. Unit Reserve Shutdown Hours 0.0 0.0 0.0
9. Gross Thermal Energy Generated (MWH) 2.535.510 11.219.795 176.748.930
10. Gross Electrical Energy Generated (MWH) 877.256 3.902.997 61.495.614
11. Net Electrical Energy Generated (MWH) 841.042 3.713.881 58.660.010
12. Reactor Service Factor 100.0 66.6 78.9
13. Reactor Availability Factor 100.0 66.6 79.4  !
14. Unit Service Factor 100.0 65.4 77.9
15. Unit Availability Factor 100.0 65.4 77.9 't
16. Unit Capacity Factor (Using MDC) 99.7 64.5 74.8
17. Unit Capacity Factor (Using Design MWe) 96.6 62.4 72.3
18. Unit Forced Outage Rate 0.0 0.0 6.1
19. Shutdowns Scheduled Over Next 6 Months (Type. Date, and Duration of each): N/A j
20. If Shut Down at End of Report Period. Estimated Date of Startup: N/A .

d Wolf Creek Generating Station ,

-e Monthly Operating Report 9309210189 930913 July 1993 DR ADOCK 05000yk982 h'r Page 2 of 5