ML20044G833

From kanterella
Revision as of 00:13, 12 March 2020 by StriderTol (talk | contribs) (StriderTol Bot insert)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Forwards Revised, Operator Requalification & Recertification Training Program Plan of Univ of Florida Training Reactor Jul 1993 Through June 1995.
ML20044G833
Person / Time
Site: 05000083
Issue date: 05/28/1993
From: Vernetson W
FLORIDA, UNIV. OF, GAINESVILLE, FL
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML20044G834 List:
References
NUDOCS 9306040329
Download: ML20044G833 (1)


Text

F .,

M7 % UNIVERSITY OF# FLORIDA N aclear Reactor Facility 202 Nuclear Science Center Nuclear Engineering Sciences Department Gainesville, FL 32611-2055 (904) 392-1429 Fax 392-3380 May 28,1993 Requalification Training Program U.S. Nuclear Regulatory Commission Washington, D.C. 20555 Attn: Document Control Desk Re: University of Florida Training Reactor Facility License: R-56; Docket No. 50-83 Gentlemen:

The current operator requalification and recertification program training cycle for the University of Florida Training Reactor as submitted with a letter dated May 31, 1991 and then updated via a letter dated December 26,1991 with a completely revised and updated UFFR Operator Requalification and Recertification Program is scheduled to end in June,1993. Therefore, we propose to renew the current plan with no changes except for the new dates. In effect, the revised plan will be essentially the same as that currently being used for the two-year training cycle. A copy of this revised plan is included as Enclosure 1 wi:h this letter for reference purposes. This renewed plan as included here will cover the UFTR operator raqualification and recertification program from July,1993 through June,1995.

As usual, we proposi to continue using this proposed program beyond the next two-year cycle; that is, we will automatically cestart the same two-year requalification and recertification program training cycle every two-years beginning in July,1995.

If you need further infornation on this plan or the proposed usage of it for all future two-year training cycles, please let us know.

STATE OF F wRIDA Sincerely, COLntry OF AUGUA 9

Uhe focegoing instrument was acknowledged 7 before me this May 28, 1993 by William G. p Vernetron who is personally known to me (

and who did not take an oath. William G. Vernetson Director of Nuclear Facilities WGV/p m c Reactor Safety Review Subcommittee 7 * '

H-D. Simpkins Notary U.S. N.R.C. Region II Mary Lynn Slone Notary Public lbtery PuMc, State of fhrida

, y My Comminbn hpbes kn. 8,1974

' ~~"

t!

9306040329 93052B PDR ADOCK 05000083 Ep! OppwtwuyWcuve Adkm Imtaufm I {'

Y PDR t

( [