MONTHYEARLIC-99-0096, Monthly Operating Rept for Sept 1999 for Fcs,Unit 1.With1999-09-30030 September 1999 Monthly Operating Rept for Sept 1999 for Fcs,Unit 1.With LIC-99-0084, Monthly Operating Rept for Aug 1999 for Fort Calhoun Station.With1999-08-31031 August 1999 Monthly Operating Rept for Aug 1999 for Fort Calhoun Station.With ML20210R1961999-07-31031 July 1999 Monthly Operating Rept for July 1999 for Fcs,Unit 1 LIC-99-0065, Monthly Operating Rept for June 1999 for Fort Calhoun Station,Unit 1.With1999-06-30030 June 1999 Monthly Operating Rept for June 1999 for Fort Calhoun Station,Unit 1.With ML20210R2081999-06-30030 June 1999 Revised Monthly Operating Rept for June 1999 for Fcs,Unit 1 LIC-99-0053, Monthly Operating Rept for May 1999 for Fort Calhoun Station,Unit 11999-05-31031 May 1999 Monthly Operating Rept for May 1999 for Fort Calhoun Station,Unit 1 LIC-99-0047, Monthly Operating Rept for Apr 1999 for Fort Calhoun Station Unit 1.With1999-04-30030 April 1999 Monthly Operating Rept for Apr 1999 for Fort Calhoun Station Unit 1.With LIC-99-0034, Monthly Operating Rept for Mar 1999 for Fcs,Unit 1.With1999-03-31031 March 1999 Monthly Operating Rept for Mar 1999 for Fcs,Unit 1.With LIC-99-0025, Monthly Operating Rept for Feb 1999 for Fort Calhoun Station,Unit 1.With1999-02-28028 February 1999 Monthly Operating Rept for Feb 1999 for Fort Calhoun Station,Unit 1.With LIC-99-0003, Monthly Operating Rept for Dec 1998 for Fort Calhoun Station.With1998-12-31031 December 1998 Monthly Operating Rept for Dec 1998 for Fort Calhoun Station.With LIC-98-0172, Monthly Operating Rept for Nov 1998 for Fort Calhoun Station,Unit 1.With1998-11-30030 November 1998 Monthly Operating Rept for Nov 1998 for Fort Calhoun Station,Unit 1.With LIC-98-0154, Monthly Operating Rept for Oct 1998 for Fort Calhoun Station,Unit 1.With1998-10-31031 October 1998 Monthly Operating Rept for Oct 1998 for Fort Calhoun Station,Unit 1.With LIC-98-0136, Monthly Operating Rept for Sept 1998 for Fort Calhoun Station,Unit 1.With1998-09-30030 September 1998 Monthly Operating Rept for Sept 1998 for Fort Calhoun Station,Unit 1.With LIC-98-0122, Monthly Operating Rept for Aug 1998 for Fort Calhoun Station Unit 1.With1998-08-31031 August 1998 Monthly Operating Rept for Aug 1998 for Fort Calhoun Station Unit 1.With LIC-98-0105, Monthly Operating Rept for July 1998 for Fort Calhoun Station1998-07-31031 July 1998 Monthly Operating Rept for July 1998 for Fort Calhoun Station LIC-98-0092, Monthly Operating Rept for June 1998 for Fort Calhoun Station,Unit 11998-06-30030 June 1998 Monthly Operating Rept for June 1998 for Fort Calhoun Station,Unit 1 LIC-98-0078, Monthly Operating Rept for May 1998 for Fort Calhoun Station Unit 11998-05-31031 May 1998 Monthly Operating Rept for May 1998 for Fort Calhoun Station Unit 1 LIC-98-0070, Monthly Operating Rept for Apr 1998 for Ft Calhoun Station1998-04-30030 April 1998 Monthly Operating Rept for Apr 1998 for Ft Calhoun Station LIC-98-0058, Monthly Operating Rept for Mar 1998 for Fcs,Unit 11998-03-31031 March 1998 Monthly Operating Rept for Mar 1998 for Fcs,Unit 1 LIC-98-0035, Monthly Operating Rept for Feb 1998 for Fcs,Unit 11998-02-28028 February 1998 Monthly Operating Rept for Feb 1998 for Fcs,Unit 1 LIC-98-0016, Monthly Operating Rept for Jan 1998 for Fort Calhoun Station1998-01-31031 January 1998 Monthly Operating Rept for Jan 1998 for Fort Calhoun Station LIC-98-0002, Monthly Operating Rept for Dec 1997 for Fcs,Unit 11997-12-31031 December 1997 Monthly Operating Rept for Dec 1997 for Fcs,Unit 1 LIC-97-0191, Monthly Operating Rept for Nov 1997 for Fcs,Unit 11997-11-30030 November 1997 Monthly Operating Rept for Nov 1997 for Fcs,Unit 1 LIC-97-0179, Monthly Operating Rept for Oct 1997 for Fcs,Unit 11997-10-31031 October 1997 Monthly Operating Rept for Oct 1997 for Fcs,Unit 1 LIC-97-0163, Monthly Operating Rept for Sept 1997 for Fcs,Unit 11997-09-30030 September 1997 Monthly Operating Rept for Sept 1997 for Fcs,Unit 1 LIC-97-0149, Monthly Operating Rept for Aug 1997 for Fort Calhoun Station Unit 11997-08-31031 August 1997 Monthly Operating Rept for Aug 1997 for Fort Calhoun Station Unit 1 LIC-97-0137, Monthly Operating Rept for Jul 1997 for Fort Calhoun Station1997-07-31031 July 1997 Monthly Operating Rept for Jul 1997 for Fort Calhoun Station LIC-97-0115, Monthly Operating Rept for June 1997 for Fort Calhoun Station,Unit 11997-06-30030 June 1997 Monthly Operating Rept for June 1997 for Fort Calhoun Station,Unit 1 ML20148L9291997-05-31031 May 1997 Monthly Operating Rept for May 1997 for Fort Calhoun Station Unit 1 LIC-97-0081, Monthly Operating Rept for April 1997 for FCS1997-04-30030 April 1997 Monthly Operating Rept for April 1997 for FCS LIC-97-0054, Monthly Operating Rept for Mar 1997 for Fort Calhoun Station Unit 11997-03-31031 March 1997 Monthly Operating Rept for Mar 1997 for Fort Calhoun Station Unit 1 ML20136G5911997-02-28028 February 1997 Monthly Operating Rept for Feb 1997 for Fort Calhoun Station ML20134M4281997-01-31031 January 1997 Monthly Operating Rept for Jan 1997 for Fort Calhoun Station Unit 1 LIC-97-0002, Monthly Operating Rept for Dec 1996 for Fort Calhoun Station Unit 11996-12-31031 December 1996 Monthly Operating Rept for Dec 1996 for Fort Calhoun Station Unit 1 ML20134M4341996-12-31031 December 1996 Revised Monthly Operating Rept for Dec 1996 for Fort Calhoun Station Unit 1 LIC-96-0196, Monthly Operating Rept for Nov 1996 for Fort Calhoun Station Unit 11996-11-30030 November 1996 Monthly Operating Rept for Nov 1996 for Fort Calhoun Station Unit 1 LIC-96-0174, Monthly Operating Rept for Oct 1996 for FCS Unit 11996-10-31031 October 1996 Monthly Operating Rept for Oct 1996 for FCS Unit 1 LIC-96-0152, Monthly Operating Rept for Sept 1996 for Fort Calhoun Station Unit 11996-09-30030 September 1996 Monthly Operating Rept for Sept 1996 for Fort Calhoun Station Unit 1 LIC-96-0134, Monthly Operating Rept for Aug 1996 for Fort Calhoun Station1996-08-31031 August 1996 Monthly Operating Rept for Aug 1996 for Fort Calhoun Station LIC-96-0113, Monthly Operating Rept for Jul 1996 for Fort Calhoun Station Unit 11996-07-31031 July 1996 Monthly Operating Rept for Jul 1996 for Fort Calhoun Station Unit 1 LIC-96-0096, Monthly Operating Rept for June 1996 for Fort Calhoun Station Unit 11996-06-30030 June 1996 Monthly Operating Rept for June 1996 for Fort Calhoun Station Unit 1 LIC-96-0084, Monthly Operating Rept for May 1996 for Fort Calhoun Station Unit 11996-05-31031 May 1996 Monthly Operating Rept for May 1996 for Fort Calhoun Station Unit 1 ML20117G0821996-04-30030 April 1996 Monthly Operating Rept for April 1996 for FCS ML20117G0841996-03-31031 March 1996 Revised MOR for March 1996 for FCS LIC-96-0036, Monthly Operating Rept for Feb 1996 for Calhoun Station,Unit 11996-02-29029 February 1996 Monthly Operating Rept for Feb 1996 for Calhoun Station,Unit 1 LIC-96-0016, Monthly Operating Rept for Jan 1996 for Fort Calhoun Station Unit 11996-01-31031 January 1996 Monthly Operating Rept for Jan 1996 for Fort Calhoun Station Unit 1 LIC-96-0004, Monthly Operating Rept for Dec 1995 for Fort Calhoun Station1995-12-31031 December 1995 Monthly Operating Rept for Dec 1995 for Fort Calhoun Station LIC-95-0233, Monthly Operating Rept for Nov 1995 for FCS Unit 11995-11-30030 November 1995 Monthly Operating Rept for Nov 1995 for FCS Unit 1 ML20093G7571995-09-30030 September 1995 Monthly Operating Rept for Sept 1995 for Fort Calhoun Station Unit 1 LIC-95-0172, Monthly Operating Rept for Aug 1995 for Fort Calhoun Station1995-08-31031 August 1995 Monthly Operating Rept for Aug 1995 for Fort Calhoun Station 1999-09-30
[Table view] Category:TEXT-SAFETY REPORT
MONTHYEARML20217B5401999-10-0606 October 1999 Safety Evaluation Supporting Amend 193 to License DPR-40 ML20217A9931999-09-30030 September 1999 NRC Regulatory Assessment & Oversight Pilot Program, Performance Indicator Data LIC-99-0096, Monthly Operating Rept for Sept 1999 for Fcs,Unit 1.With1999-09-30030 September 1999 Monthly Operating Rept for Sept 1999 for Fcs,Unit 1.With ML20211J9321999-09-0202 September 1999 Safety Evaluation Concluding That Licensee Proposed Alternatives Provide Acceptable Level of Quality & Safety. Proposed Alternatives Authorized for Remainder of Third ten- Yr ISI Interval for Fort Calhoun Station,Unit 1 LIC-99-0084, Monthly Operating Rept for Aug 1999 for Fort Calhoun Station.With1999-08-31031 August 1999 Monthly Operating Rept for Aug 1999 for Fort Calhoun Station.With ML20216E6431999-08-26026 August 1999 Rev 19 to TDB-VI, COLR for FCS Unit 1 ML20210R1961999-07-31031 July 1999 Monthly Operating Rept for July 1999 for Fcs,Unit 1 ML20210G2181999-07-27027 July 1999 Safety Evaluation Supporting Amend 192 to License DPR-40 ML20210D9951999-07-22022 July 1999 Safety Evaluation Supporting Amend 191 to License DPR-40 ML20216E6361999-07-21021 July 1999 Rev 18 to TDB-VI, COLR for FCS Unit 1 ML20210R2081999-06-30030 June 1999 Revised Monthly Operating Rept for June 1999 for Fcs,Unit 1 LIC-99-0065, Monthly Operating Rept for June 1999 for Fort Calhoun Station,Unit 1.With1999-06-30030 June 1999 Monthly Operating Rept for June 1999 for Fort Calhoun Station,Unit 1.With ML20196H8621999-06-30030 June 1999 NRC Regulatory Assessment & Oversight Pilot Program, Performance Indicator Data, June 1999 Rept ML20210P5461999-06-0808 June 1999 Rev 0,Vols 1-5 of Fort Calhoun Station 1999 Emergency Preparedness Exercise Manual, to Be Conducted on 990810. Pages 2-20 & 2-40 in Vol 2 & Page 4-1 in Vol 4 of Incoming Submittal Not Included ML20195B4581999-05-31031 May 1999 Rev 3 to CE NPSD-683, Development of RCS Pressure & Temp Limits Rept for Removal of P-T Limits & LTOP Requirements from Ts ML20207H7401999-05-31031 May 1999 Performance Indicators Rept for May 1999 LIC-99-0053, Monthly Operating Rept for May 1999 for Fort Calhoun Station,Unit 11999-05-31031 May 1999 Monthly Operating Rept for May 1999 for Fort Calhoun Station,Unit 1 ML20195B4521999-05-17017 May 1999 Technical Data Book TDB-IX, RCS Pressure - Temp Limits Rept (Ptlr) ML20206L4241999-05-10010 May 1999 Safety Evaluation Supporting Corrective Actions to Ensure That Valves Are Capable of Performing Intended Safety Functions & OPPD Adequately Addressed Requested Actions Discussed in GL 95-07 ML20206M2601999-05-0606 May 1999 SER Concluding That Licensee IPEEE Complete Re Info Requested by Suppl 4 to GL 88-20 & IPEEE Results Reasonable Given FCS Design,Operation & History LIC-99-0047, Monthly Operating Rept for Apr 1999 for Fort Calhoun Station Unit 1.With1999-04-30030 April 1999 Monthly Operating Rept for Apr 1999 for Fort Calhoun Station Unit 1.With ML20195E8621999-04-30030 April 1999 Performance Indicators, for Apr 1999 ML20205Q5831999-04-15015 April 1999 Safety Evaluation Supporting Amend 190 to License DPR-40 ML20210J4331999-03-31031 March 1999 Changes,Tests, & Experiments Carried Out Without Prior Commission Approval for Period 981101-990331.With USAR Changes Other than Those Resulting from 10CFR50.59 ML20206G2641999-03-31031 March 1999 Performance Indicators Rept for Mar 1999 LIC-99-0034, Monthly Operating Rept for Mar 1999 for Fcs,Unit 1.With1999-03-31031 March 1999 Monthly Operating Rept for Mar 1999 for Fcs,Unit 1.With ML20205J8181999-02-28028 February 1999 Performance Indicators, for Feb 1999 LIC-99-0025, Monthly Operating Rept for Feb 1999 for Fort Calhoun Station,Unit 1.With1999-02-28028 February 1999 Monthly Operating Rept for Feb 1999 for Fort Calhoun Station,Unit 1.With ML20207F3291999-01-31031 January 1999 FCS Performance Indicators for Jan 1999 ML20203B0991998-12-31031 December 1998 Performance Indicators for Dec 1998 LIC-99-0026, 1998 Omaha Public Power District Annual Rept. with1998-12-31031 December 1998 1998 Omaha Public Power District Annual Rept. with LIC-99-0003, Monthly Operating Rept for Dec 1998 for Fort Calhoun Station.With1998-12-31031 December 1998 Monthly Operating Rept for Dec 1998 for Fort Calhoun Station.With ML20198S3771998-12-31031 December 1998 Safety Evaluation Supporting Amend 189 to License DPR-40 ML20198S4831998-12-31031 December 1998 Safety Evaluation Supporting Amend 188 to License DPR-40 ML20196G2251998-12-18018 December 1998 Rev 2 to EA-FC-90-082, Potential Over-Pressurization of Containment Penetration Piping Following Main Steam Line Break in Containment ML20198M3141998-11-30030 November 1998 Performance Indicators Rept for Nov 1998 LIC-98-0172, Monthly Operating Rept for Nov 1998 for Fort Calhoun Station,Unit 1.With1998-11-30030 November 1998 Monthly Operating Rept for Nov 1998 for Fort Calhoun Station,Unit 1.With LIC-98-0160, Special Rept:On 981113,MSL RM RM-064 Was Declared Inoperable Due to Leakage Past Isolation Valve HCV-922.Troubleshooting Has Indicated That Leakage Has Stopped & Cause of Leak Continues to Be Investigated1998-11-25025 November 1998 Special Rept:On 981113,MSL RM RM-064 Was Declared Inoperable Due to Leakage Past Isolation Valve HCV-922.Troubleshooting Has Indicated That Leakage Has Stopped & Cause of Leak Continues to Be Investigated ML20203B0721998-11-16016 November 1998 Rev 6 to HI-92828, Licensing Rept for Spent Fuel Storage Capacity Expansion ML20196E4981998-10-31031 October 1998 Performance Indicators Rept for Oct 1998 ML20196G2441998-10-31031 October 1998 Changes,Tests & Experiments Carried Out Without Prior Commission Approval. with USAR Changes Other than Those Resulting from 10CFR50.59 LIC-98-0154, Monthly Operating Rept for Oct 1998 for Fort Calhoun Station,Unit 1.With1998-10-31031 October 1998 Monthly Operating Rept for Oct 1998 for Fort Calhoun Station,Unit 1.With ML20154M4881998-10-19019 October 1998 Safety Evaluation Supporting Amend 186 to License DPR-40 ML20154N2411998-10-19019 October 1998 Safety Evaluation Supporting Amend 187 to License DPR-40 LIC-98-0136, Monthly Operating Rept for Sept 1998 for Fort Calhoun Station,Unit 1.With1998-09-30030 September 1998 Monthly Operating Rept for Sept 1998 for Fort Calhoun Station,Unit 1.With ML20155G4261998-09-30030 September 1998 Performance Indicators for Sept 1998 ML20154A1251998-08-31031 August 1998 Performance Indicators, Rept for Aug 1998 LIC-98-0122, Monthly Operating Rept for Aug 1998 for Fort Calhoun Station Unit 1.With1998-08-31031 August 1998 Monthly Operating Rept for Aug 1998 for Fort Calhoun Station Unit 1.With ML20238F7231998-08-17017 August 1998 Owner'S Rept for Isis ML18066A2771998-08-13013 August 1998 Part 21 Rept Re Deficiency in CE Current Screening Methodology for Determining Limiting Fuel Assembly for Detailed PWR thermal-hydraulic Sa.Evaluations Were Performed for Affected Plants to Determine Effect of Deficiency 1999-09-30
[Table view] |
Text
1 1
Omat a Public Power District l P.O. Box 399 Hwy.75. No th of Ft.Calhoun Fort Calhoun, NE 680230399 j 402/636-2000 July 14, 1993 LIC-93-0182 I
U. S. Nuclear Regulatory Commission ATTN: Document Control Desk Mail Station PI-137 Washington, DC 20555
Reference:
Docket No. 50-285 Gentlemen:
SUBJECT:
June 1993 Monthly Operating Report (HOR)
Enclosed is the June 1993 MOR for Fort Calhoun Station (FCS) Unit No. I as required by FCS Technical Specification Section 5.9.1.
If you should have any questions, please contact me.
Sincerely, b, 5.
W. G. Gates Vice President ;
WGG/pjc Enclosures c: LeBoeuf, Lamb, Leiby & MacRae J. L. Milhoan, NRC Regional Administrator, Region IV S. D. Bloom, NRC Project Manager R. P. Mullikin, NRC Senior Resident Inspector R. T. Pearce, Combustion Engineering R. J. Simon, Westinghouse Office of Management & Program Analysis (2)
INPO Records Center I
f 9307160288 930630 F / /
c5.5179 PDR ADOCK 05000295 (N l R U PDR Q
. OMAHA PUBLIC POWER DISTRICT Fort Calhoun Station Unit No. 1 JUNE 1993 Monthly Operating Report
- 1. OPERATIONS
SUMMARY
l l
The station began the month at 100% power. On June 14, 1993, moderator I temperature coefficient testing was conducted successfully at approximately 95% power. Subsequently, full power operation resumed until a plant trip occurred at 1322 hours0.0153 days <br />0.367 hours <br />0.00219 weeks <br />5.03021e-4 months <br /> on June 24. The cause of the trip was 1 determined to be inadvertent jarring of a 345KV fault relay when a cabinet door was opened during maintenance in the switchyard. This relay trip 1 f caused opening of the generator output breakers a turbine trip, and a l reactor trip. Post-trip actions included troubleshooting and testing of 1 non-safety related electrical components and main feedwater heater relief valves. Further details of this event will be reported in LER 93-011.
The reactor was brought critical at 1412 hours0.0163 days <br />0.392 hours <br />0.00233 weeks <br />5.37266e-4 months <br /> on June 26. Reactor power was slowly raised and the turbine generator was synchronized to the grid at 1115 hours0.0129 days <br />0.31 hours <br />0.00184 weeks <br />4.242575e-4 months <br /> on June 27. Power was held at 30% for chemistry ,
considerations. At 0606 hours0.00701 days <br />0.168 hours <br />0.001 weeks <br />2.30583e-4 months <br /> on June 30, chemistry limits were met and a i power ascension commenced. Power was raised to 70% over the next several !
hours, where it remained until July 1 for the testing of the feedwater l heater relief valves mentioned above. {
On June 29, the annual Emergency Plan Exercise was conducted; this exercise was integrated into the overall Federal Radiological Monitoring and Assessment Center drill.
l i
The fellowing NRC inspections were completed during this reporting period:
IER No. DescriDtion .
)
93-06 Residents' Routine Inspection .'
Fire Protection Inspection 93-09 93-10 Confirmatory Measurements Inspection 93-14 Maintenance Inspection The following LERs were submitted during this reporting period:
LER No. Description t
93-007 Unplanned Emergency Diesel Start and Reactor Trip Signal 93-008 Failure to Implement Surveillance Requirement for Stack Flow Indicator 93-009 Automatic Start of Backup Charging Pumps and Isolation of Letdown F1ow l
5 9
. MONTHLY OPERATING REPORT ;
JUNE 1993 PAGE TWO
- 2. SAFETY VALVES OR PORY CHALLENGES OR FAILURES WHICH OCCURRED j No primary safety or power operated relief valve challenges or failures occurred. Although the plant tripped on loss of load on June 24 primary pressure only reached approximately 2166 psia, which -is well below the PORV or primary safety valve setpoints.
- 3. RESULTS OF LEAK RATE TESTS The reactor coolant system (RCS) leak rate was less than 0.200 gpm for most of June. On June 5, the leak rate increased due to packing leakage from Charging Pump CH-1A. The pump was repacked and returned to service with no further indication of increased leakage, Except for the increase on June 5, the. leak rate remained steady until June 24 when the plant tripped. Leak rate test results have been erratic since then due to changes in reactor power level involving boration and dilution of the RCS. However, there is no indication of a change in the previously observed trend.
- 4. L A.tLGES. TESTS AND EXPERIMENTS RE0VIRING NUCLEAR REGULATORY COMMISSION A.lH0 llZATION PURSUANT TO 10CFR50.59 Amendment No. Description l
NONE
- 5. SIGNIFICANT SAFETY RELATED MAINTENANCE FOR THE MONTH OF JUNE 1993
- Replaced rotating assembly on Raw Water Pump AC-10A.
- Replaced the discharge pressure controller root valve for Raw Water Pump.
AC-10A.
- Cleaned the raw water side of Component Cooling Heat Exchanger AC-1A.
Performed abrasive blast and applied an epoxy coat to the tube sheets, sides and end bell interiors. ;
- Rebuilt Component Cooling Water (CCW) Inlet Valve HCV-489A and CCW Outlet Valve HCV-4898, and replaced Solenoid HCV-489A-20 and Solenoid HCV-489B-20.
- Replaced the plunger packing and front ca) gaskets on Charging Ps 'H -
1A and repaired the Suction Accumulator C1-26A. 3
- Replaced Level Controller LC-283 on Packing Cooling Pump CH-IA-1.
- Repaired loose connection and replaced ammeter on'125V AC Battery Charger No. 2.
t
- 6. OPERATING DATA REPORT Attachment I L'
. MONTHLY OPERATING REPORT JUNE 1993 PAGE THREE
- 7. - AVERAGE DAILY UNIT POWER LEVEL Attachment II-
- 8. UNIT SHUTDOWNS AND POWER REDUCTIONS Attachment III
- 9. REFUELING INFORMATION. FORT CALHOUN STATION UNIT NO. 1 Attachment IV i
)
Y l
i i
I
. ATTACHMENT I 1 OPERATING DATA REPORT DOCKET NO. 50-285 FBRT dKf;HUUN 5fXffdD UNIT DATE 3DLY 08.199'3 COMPLETED BY M. A. HDWMXN OPERATING STATUS TELEPHONE jyj-533-65~39 .
- 1. Unit Name:
n FORT CALHOUN STATION
- 2. Reporting peFlod: JON5~TY53] NOTES ,
- 3. Licensed Thermal Power (MWt): 1500
- 4. Nameplate Rating (Gross MWe): 502
- 5. Design Elec. Rating (Net MWe): 478
- 6. Max. Dep. Capacity (Gross MWe): 502
- 7. Max. Dep. Capacity- (Net MWe): 475[
- 8. If changes occur in Capacity Ratings (3 through 7) since last report, give reasons:
N/A
- 9. Power Level to which restricted, if any (Net MWe): N/A
- 10. Reasons for restrictions, if any:
N/A THIS MONTH YR-TO-DATE CUMULATIVE '
-11. Hours in Reporting Period........... 720.0 - 4343.0 173257.0
- 12. Number of Hours Reactor was Critical 671.1 4f3316 134743.9'
- 13. Reactor Reserve Shutdown Hours......
.0 .0 1309.5
- 14. Hours Generator On-line............. 649.4 4103.6 133166.8
- 15. Unit Reserve Shutdown Hours......... .0 .0 .0.
'16. Gross Thermal Energy Generated (MWH) 883603.7 33f5'721.1 175185197.i~
- 17. Gross Elec. Energy Generated (MWH).. 21TidD7 V
~f81f53]io .~d~ 57726180.2
- 18. Net Elec. Energy Generated (MWH)..... 280104.3 ~1YFF390.8- 55070277.7
-19. Unit Service Factor................. 90.2 76.9
- 20. Unit Availability Factor............ 94.5~
90.2 94.5 76T9~
-21. Unit Capacity Factor (using MDC Net) 81.4'
~~ ~
86.T 6Di~d-
- 22. Unit Capacity Factor (using DER Net) 81.4- 837~7~ 677Y~
-23. Unit Forced Outage Rate............. 9.8 1. T
~
4.3~
- 24. Shutdowns scheduled over next 6 months (type, date, and duration of-each):
REFUELING OUTAGE SCHEDULED TO BEGIN ON SEPTEMBER 183 _1993 AND LAST APPROXIMATELY_56_ DAYS. -
25, If shut down at end of report period, estimated date of startup:
-26. Units in test status (prior to comm. oper.): Forecast Achieved INITIAL CRITICALITY INITIAL ELECTRICITY N/A ~~~
COMMERCIAL' OPERATION t
e e w e-' -gi- --w- w -
ATTACHMENT II AVERAGE DAILY UNIT POWER LEVEL DOCKET NO. 50_-2__8_5 _ ___ ___ _
UNIT FORT CALHOUN STATION DATE ylfLY _03]i993 COMPLETED'BY M. A. HOWMAN TELEPHONE 402-533-6919 MONTH JUNE 1993 DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe-Net) (MWe-Net) 1 485 17 477 '
2 484 18 476 3 486 19 478 4 487 20 480 5 487 21 479 6 _
486 22 477 7 .
485 23 475 8 484 24 260 9 482 25 -0 10 _
481. _
26 0 11 479 27 20 12 450 28 100 13 449 29 '101 14 449 30 214 15 478 31 N/A 16 481 l 1
1
.. INSTRUCTIONS On this form, list the average' daily unit. power level in MWe-Net for each !
day in'the reporting month. Compute to the nearest whole megawatt, i
m -
ATTACHNENT III ' DOCKET NO. 50-285
_ UNIT SHlfTDOWNS AND POWER REDUCTIONS UNIT NAME Fort Calhoen St.
. DATE July 8.1993 CONPLETED BY N. A. Howsan.
TELEPHONE f402) 533-6939 REPORT NONTH June 1993 . .
No. Date Type t Duration Reason 2 Method of Ucensee - System Component Cause & Corrective
. (Hours) Shutting Event Code' Code s Action to Down Reactor 3 Report # Prevent Recurrence 3 06/24 S 3 F 70.6 B 3 93-011 EA RELAYX During switchyard mairmenance, a relay was inadvertaraly actuated.
Corrective actions will be discussed in LER 93411.
-1 2- 3- 4 F: Forced - Reason: Method: Exhibit G - Instructons
' 5: Scheduled A-Equipment Failure (Explain) 1-Manual for Preparstion of Data B-Maintenance or Test 2-Manual Scram. Entry Sheets for Licensee C-Refueling 3-Automatic Scram. Event Repost (LER) Fde (NUREG416I)
D-Regulatory Restriction - 4Cher (Explain)
E-Operator Training & License Examination F-Administrative 5 ~
G-Operational Error (Explain) Exhibit l - Same Source HOber(Explain)
-(9/77)
.l f
. . . - - - . . - . . . - . . . - = . - - - _ _ . - _ _ - - - .- _ _ - _----__ - -
Attachment IV Refueling Information Fort Calhoun - Unit No. 1 Report for the month ending June 1993
- 1. Scheduled dated for next refueling shutdown. September 1993
- 2. Scheduled date for restart following refueling. November 1993
- 3. Will refueling or resumption of operations thereafter require a technical specification change or other license amendment? Yes
- a. If answer is yes, what, in general, will these be?
Administrative i controls revision regarding- reload analysis methodology changes.
- b. If answer is no, has the reload fuel design and core configuration been reviewed by your Plant Safety Review Committee to determine whether any unreviewed safety questions are associated with the core reload. N/A
- c. If no such review has taken place, when is it scheduled? N/A
- 4. Scheduled date(s) for submitting proposed licensing action and support information. June 1993
- 5. Important licensing considerations associated with refueling, e.g., new or different fuel design :
or supplier, unreviewed design or performance analysis methods,'significant chan ,
design, new operating procedures. ges in fuel None Planned
- 6. The number of fuel assemblies: a) in the core 133 Assemblies 529 Assemblies b) fuel poolin the spent-c) spent fuel pool storage capacity 729 Assemblies d) planned spent Planned to be fuel pool increased with high storage capacity density spent fuel-racks. '
- 7. The 3rojected date of the last refueling that can be disclarged to the spent fuel pool assuming the present licensed capacity. 1995*
- Capability of full core offload of 133 assemblies lost. Reracking to be performed between the 1993 and 1995 Refueling Outages.
Prepared by Id&#h 6e kcu Date 7/B[93 f /