Final Deficiency Rept Re Grout Spill Into Penetration, Initially Reported 811203.Grout Removed Using hydro-lance & Vacuum Hose.Visual Insp to Assure Removal of Grout Performed
ML20052F952
Person / Time
Site: Fermi DTE Energy icon.png
Issue date: 04/29/1982
From: Wells D
DETROIT EDISON CO.
To: James Keppler
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
References
10CFR-050.55E, 10CFR-50.55E, EF2-57466, NUDOCS 8205140185
Download: ML20052F952 (2)


Text

_ _ _ _ - _ _ _ .

l Donald A. Wells y Amra"a

'h rp G 2000 Second Aven .

Edison mw ue April 29, 1982 EF2-57466 t:0 t' o>

/

9  %

Mr. James G. Keppler, Regional Administrator ffECElyg3 g)

Region III U.S. Nuclear Regulatory Ccumission  ; MAyJ g g $

799 Roosevelt Road j masuu sEau n n g d., p Glen Ellyn, Illinois 60137 (j - L, 9  %

A b /

O

Subject:

Final Report of 10CFR50.55(e) Item on Grout Spill into y Penetration (#48)

Dear Mr. Keppler:

On December 3,1981, Detroit Edison's Mr. H.A. Walker, Supervisor-Con-struction Quality Assurance, telephoned Mr. J. Konklin of NRC. Region III to report on a problem with Grout Spill 'into penetration at tne Fermi 2 site.

In grouting around flued head structural steel, the form broke allowing grout to flow into the penetration sleeve of penetration X-43. Approxi-mately one half of the two to three inch clearance around the penetration was filled with grout, with additional grout believed to be between the liner plate and the concrete of the drywell.

The grout his been removed using a hydro-lance and a vacuum hose. Visual inspection utilizing a boroscope was performed to assure all grout had been removed. This matter has been discussed with the contractors res-ponsible for the grouting and the formwork and appropriate action has been taken to prevent recurrence.

If ycu have questions 'concerning this matter, . please contact Mr. H.'A. Walker, Supervisor-Construction Quality Assurance.

Very truly yours,

/p DAW / HAW /cp e20429 '* 1 0 Cf32 yY h OSOOOg ,#

e Mr. James G. Keppler  ! April 29, 1982 Page M EF2-57466 cc: Mr. Richard DeYoung, Director

' Office of Inspection and Enforcement Division of Reactor Inspection Programs-U.S. Nuclear Regulatory Ccanission Washington, D.C. 20555 Mr. Bruce Little, Resident Inspector

U.S. Nuclear Regulatory Ccanission 6450 North Dixie Highway Newport, Michigan 48166 l'

h i

i E

1 i'

4 I

r_ 6 F

4 N ey.- , . - . , , - - , , - - , , _m_. . . , , _. , , _. , ,.g me -, ,,-, , ,, - -