|
---|
Category:Inspection Report
MONTHYEARIR 05000250/20243012024-10-0303 October 2024 NRC Operator License Examination Report 05000250/2024301 and 05000251/2024301 IR 05000250/20240052024-08-23023 August 2024 Updated Inspection Plan for Turkey Point Units 3 & 4 - Report 05000250/2024005 and 05000251/2024005 IR 05000250/20240022024-08-0101 August 2024 Integrated Inspection Report 05000250/2024002 and 05000251/2024002 IR 05000250/20244012024-06-0505 June 2024 – Security Baseline Inspection Report 05000250-2024401, 05000251-2024401 and 07200062-2024401 IR 05000250/20240012024-05-10010 May 2024 Integrated Inspection Report 05000250/2024001 and 05000251/2024001 ML24072A2382024-03-20020 March 2024 Review of the Fall 2023 Steam Generator Tube Inspections During Refueling Outage No. 33 IR 05000250/20244202024-03-11011 March 2024 – Security Baseline Inspection Report 05000250/2024420 and 05000251/2024420 - Final IR 05000250/20230062024-02-28028 February 2024 Annual Assessment Letter for Turkey Point Units 3 & 4 - Report 05000250/2023006 and 05000251/2023006 IR 05000250/20240112024-02-15015 February 2024 Notification of Turkey Point Nuclear Generating Station - Comprehensive Engineering Team Inspection (CETI) Baseline Inspection Report 05000250/2024011 and 05000251/2024011 IR 05000250/20230042024-02-13013 February 2024 Integrated Inspection Report 05000250/2023004 and 05000251/2023004 IR 05000250/20240102024-01-0505 January 2024 Focused Engineering Inspection 05000250/2024010 and 05000251/2024010 IR 05000250/20230032023-11-0909 November 2023 – Integrated Inspection Report 05000250/2023003 and 05000251/2023003 IR 05000250/20230102023-09-29029 September 2023 Biennial Problem Identification and Resolution Inspection Report 05000250/2023010 and 05000251/2023010 IR 05000250/20230052023-08-21021 August 2023 Updated Inspection Plan for Turkey Point, Units 3 & 4 (Report 05000250/2023005 and 05000251/2023005) IR 05000250/20230022023-08-14014 August 2023 Integrated Inspection Report 05000250/2023002 and 05000251/2023002 IR 05000250/20234022023-06-12012 June 2023 – Security Baseline Inspection Report 05000250/2023402 and 05000251/2023402 IR 05000250/20233012023-05-17017 May 2023 – NRC Operator License Examination Report 05000250/2023301 and 05000251/2023301 IR 05000250/20230012023-05-12012 May 2023 – Integrated Inspection Report 05000250/2023001 and 05000251/2023001 IR 05000250/20220062023-03-0101 March 2023 Annual Assessment Letter for Turkey Point, Units 3 & 4 (Report 05000250/2022006 and 05000251/2022006) IR 05000250/20220042023-01-27027 January 2023 – Integrated Inspection Report 05000250/2022004 and 05000251/2022004 IR 05000250/20220112022-12-20020 December 2022 – Design Basis Assurance Inspection (Programs) Inspection Report 05000250/2022011 and 05000251/2022011 IR 05000250/20220102022-11-29029 November 2022 Triennial Fire Protection Inspection Report 05000250/2022010 and 05000251/2022010 IR 05000250/20224022022-11-0707 November 2022 Security Baseline Inspection Report 05000250 2022402 and 05000251 2022402 IR 05000250/20220032022-10-31031 October 2022 Integrated Inspection Report 05000250/2022003 and 05000251/2022003 ML22286A1262022-10-28028 October 2022 Review of the Fall 2021 Steam Generator Tube Inspections During Refueling Outage No. 32 IR 05000250/20234012022-10-19019 October 2022 Information Request for the Cyber-Security Baseline Inspection, Notification to Perform Inspection 05000250/2023401 and 05000251/2023401 IR 05000250/20220052022-08-26026 August 2022 Updated Inspection Plan for Turkey Point Units 3 & 4 Report 05000250 2022005 and 05000251 2022005-Final ML22229A5332022-08-18018 August 2022 Notification of Target Set Inspection and Request for Information (NRC Inspection Report No. 05000250 2022402 and 05000251 2022402) IR 05000250/20220022022-08-12012 August 2022 Integrated Inspection Report 05000250/2022002 and 05000251/2022002 IR 05000250/20220012022-05-11011 May 2022 Integrated Inspection Report 05000250/2022001 and 05000251/2022001 L-2022-072, Steam Generator Tube Inspection Report2022-05-0606 May 2022 Steam Generator Tube Inspection Report IR 05000250/20224012022-03-0808 March 2022 Security Baseline Inspection Report 05000250/2022401 and 05000251/2022401(U) IR 05000250/20210062022-03-0202 March 2022 Annual Assessment Letter for Turkey Point, Units 3 and 4 (Report No. 05000250/2021006 and 05000251/2021006) IR 05000250/20210042022-02-0202 February 2022 Integrated Inspection Report 05000250/2021004 and 05000251/2021004 IR 05000250/20210072021-11-0303 November 2021 Follow-Up Assessment Letter Report 05000250/2021007 IR 05000250/20210032021-11-0303 November 2021 Integrated Inspection Report 05000250/2021003 and 05000251/2021003 IR 05000250/20210402021-09-30030 September 2021 95001 Supplemental Inspection Report 05000250/2021040 and 05000251/2021040 IR 05000250/20210052021-08-25025 August 2021 Updated Inspection Plan for Turkey Point, Units 3 & 4 (Report 05000250/2021005 and 05000251/2021005) IR 05000250/20210022021-08-0404 August 2021 Integrated Inspection Report 05000250/2021002 and 05000251/2021002 IR 07200062/20210012021-07-21021 July 2021 Operation of an Independent Spent Fuel Storage Installation Report 07200062/2021001 IR 05000250/20214012021-06-11011 June 2021 Security Baseline Inspection Report 05000250/2021401, 05000251/2021401, and 07200062/2021401 IR 05000250/20210012021-05-0707 May 2021 Integrated Inspection Report 05000250/2021001 and 05000251/2021001 and Assessment Follow-Up Letter IR 05000250/20210122021-05-0505 May 2021 Biennial Problem Identification and Resolution Inspection Report 05000250/2021012 and 05000251/2021012 IR 05000250/20214202021-04-29029 April 2021 Security Baseline Inspection Report 05000250/2021420 and 05000251/2021420 Cover Letter IR 05000250/20213012021-04-10010 April 2021 NRC Operator License Examination Report 05000250/2021301 and 05000251/2021301 IR 05000250/20210902021-04-0606 April 2021 Notice of Violation and Proposed Imposition of Civil Penalty $150,000, NRC Inspection Report Nos.05000250/2021090 and 05000251/2021090; Investigation Report Nos. 2-2019-011 and 2-2019-025 Exercise of Enforcement Discretion IR 05000250/20200062021-03-0303 March 2021 Annual Assessment Letter for Turkey Point Nuclear Plant, Unit 3 and Unit 4 Report 05000250/2020006 and 05000251/2020006 IR 05000250/20210102021-02-26026 February 2021 Triennial Inspection of Evaluation of Changes, Tests and Experiments Baseline Inspection Report 05000250/2021010 and 05000251/2021010 IR 05000250/20204022021-02-12012 February 2021 Material Control and Accounting Program Inspection Report 05000250/2020402 and 05000251/2020402 Public Version (Cover Letter Only) IR 05000250/20200042021-02-11011 February 2021 Integrated Inspection Report 05000250/2020004 and 05000251/2020004 and Independent Spent Fuel Storage Installation Inspection (ISFSI) 07200062/2020002 2024-08-23
[Table view] Category:Letter
MONTHYEARL-2024-184, Radiological Emergency Plan Revision 772024-11-0505 November 2024 Radiological Emergency Plan Revision 77 L-2024-173, Response to Requests for Additional Information Regarding Turkey Point License Amendment Request (278) to Facilitate a Transition to 24-Month Fuel Cycles2024-10-31031 October 2024 Response to Requests for Additional Information Regarding Turkey Point License Amendment Request (278) to Facilitate a Transition to 24-Month Fuel Cycles L-2024-176, Annual 10 CFR 140.21 Licensee Guarantees of Payment of Deferred Premiums2024-10-30030 October 2024 Annual 10 CFR 140.21 Licensee Guarantees of Payment of Deferred Premiums L-2024-175, Cycle 34 Core Operating Report2024-10-24024 October 2024 Cycle 34 Core Operating Report ML24291A2882024-10-24024 October 2024 Westinghouse Topical Report - Request for Withholding Information from Public Disclosure L-2024-177, Revised Response to Requests for Additional Information Regarding Turkey Point License Amendment Request 277, Updated Spent Fuel Pool Criticality Analysis2024-10-22022 October 2024 Revised Response to Requests for Additional Information Regarding Turkey Point License Amendment Request 277, Updated Spent Fuel Pool Criticality Analysis ML24276A2302024-10-16016 October 2024 Westinghouse Topical Report – Request for Withholding Information from Public Disclosure L-2024-169, Supplement to License Amendment Request to Adopt Common Emergency Plan with Site- Specific Annexes2024-10-15015 October 2024 Supplement to License Amendment Request to Adopt Common Emergency Plan with Site- Specific Annexes ML24289A2372024-10-15015 October 2024 Transmittal of Revision 1 Additional Errata Pages for WCAP-18830-P (Proprietary) and WCAP-18830-NP (Non-Proprietary), Turkey Point Fuel Storage Criticality Analysis for 24 Month Cycles L-2024-118, Fleet License Amendment Request to Relocate Staff Qualifications from Technical Specifications to the Quality Assurance Topical Report (FPL-1)2024-10-0808 October 2024 Fleet License Amendment Request to Relocate Staff Qualifications from Technical Specifications to the Quality Assurance Topical Report (FPL-1) L-2024-157, Response to Requests for Additional Information Regarding License Amendment Request (278) to Facilitate a Transition to 24-Month Fuel Cycles2024-10-0303 October 2024 Response to Requests for Additional Information Regarding License Amendment Request (278) to Facilitate a Transition to 24-Month Fuel Cycles IR 05000250/20243012024-10-0303 October 2024 NRC Operator License Examination Report 05000250/2024301 and 05000251/2024301 L-2024-147, Submission of Periodic Reports2024-10-0101 October 2024 Submission of Periodic Reports L-2024-158, Supplemental Information to License Amendment Request to Adopt Common Emergency Plan with Site-Specific Annexes2024-09-25025 September 2024 Supplemental Information to License Amendment Request to Adopt Common Emergency Plan with Site-Specific Annexes ML24269A1292024-09-24024 September 2024 Response to Requests for Additional Information Regarding Turkey Point License Amendment Request 277, Updated Spent Fuel Pool Criticality Analysis ML24260A2262024-09-18018 September 2024 NRC Examination Results Summary - Examination Reports: 05000250/2024301 and 05000251/2024301 ML24262A2272024-09-18018 September 2024 Transmittal of Additional Errata Pages for WCAP-18830-P (Proprietary) and WCAP-18830-NP (Non-Proprietary), Turkey Point Fuel Storage Criticality Analysis for 24 Month Cycles ML24158A0052024-09-17017 September 2024 Completion of Subsequent License Renewal Site Specific Environmental Review and Modification to Subsequent Renewed Facility Operating Licenses L-2024-136, Supplement to License Amendment Request to Adopt Common Emergency Plan with Site-Specific Annexes2024-09-16016 September 2024 Supplement to License Amendment Request to Adopt Common Emergency Plan with Site-Specific Annexes ML24207A0342024-09-13013 September 2024 – Exemption from Certain Requirements of 10 CFR 50.46 for Use of Axiom Fuel Rod Cladding – Letter ML24256A1132024-09-13013 September 2024 Regulatory Audit Summary Related to the Review of Regarding the Updated Spent Fuel Pool Criticality Safety Analysis License Amendment Request IR 05000250/20240052024-08-23023 August 2024 Updated Inspection Plan for Turkey Point Units 3 & 4 - Report 05000250/2024005 and 05000251/2024005 ML24234A0062024-08-22022 August 2024 Project Manager Assignment L-2024-106, Fifth and Sixth 10-Year Inservice Testing Interval Relief Request No. VR-022024-08-12012 August 2024 Fifth and Sixth 10-Year Inservice Testing Interval Relief Request No. VR-02 L-2024-122, Core Operating Limits Report2024-08-12012 August 2024 Core Operating Limits Report ML24163A0012024-08-0505 August 2024 LTR-24-0119-1-1 Response to Nh Letter Regarding Review of NextEras Emergency Preparedness Amendment Review L-2024-089, Notification of Deviation from Pressurized Water Owners Group (PWROG) Report WCAP- 17 451-P. Revision 1. Reactor Internals Guide Tube Wear - Westinghouse Domestic Fleet Operational Projections2024-07-25025 July 2024 Notification of Deviation from Pressurized Water Owners Group (PWROG) Report WCAP- 17 451-P. Revision 1. Reactor Internals Guide Tube Wear - Westinghouse Domestic Fleet Operational Projections L-2024-125, Notice of Intent to Provide Supplemental Information to License Amendment Request to Adopt Common Emergency Plan with Site-Specific Annexes2024-07-24024 July 2024 Notice of Intent to Provide Supplemental Information to License Amendment Request to Adopt Common Emergency Plan with Site-Specific Annexes ML24184B2822024-07-16016 July 2024 – Request to Use a Later Code Edition and Addenda of the American Society of Mechanical Engineers Boiler and Pressure Vessel Code, Section XI ML24193A2432024-07-12012 July 2024 – Interim Audit Summary Report in Support of Review of License Amendment Requests Regarding Fleet Emergency Plan 05000250/LER-2024-002-01, Condition Prohibited by Technical Specifications2024-07-10010 July 2024 Condition Prohibited by Technical Specifications L-2024-114, Quality Assurance Topical Report (FPL-1 Revision 31 Annual Submittal2024-07-10010 July 2024 Quality Assurance Topical Report (FPL-1 Revision 31 Annual Submittal ML24173A1902024-06-28028 June 2024 Withdrawal of an Amendment Request ML24159A2652024-06-26026 June 2024 Correction of Safety Evaluation for Issuance of Amendment Nos. 298 & 291 Regarding Revising the Fire Protection Program in Support of Reactor Coolant Pump Seal Replacement Project L-2024-102, Official Service List Update2024-06-19019 June 2024 Official Service List Update L-2024-100, Withdrawal of License Amendment Request 274, Reactor Protection System, Engineered Safety Features Actuation System, and Nuclear Instrumentation System Replacement Project2024-06-19019 June 2024 Withdrawal of License Amendment Request 274, Reactor Protection System, Engineered Safety Features Actuation System, and Nuclear Instrumentation System Replacement Project ML24149A2862024-06-12012 June 2024 NextEra Fleet - Proposed Alternative Frr 23-01 to Use ASME Code Case N-752-1, Risk-Informed Categorization and Treatment for Repair/Replacement Activities in Class 2 and 3 Systems Section X1, Division 1 (EPID L-2023-LLR-0009) - Letter IR 05000250/20244012024-06-0505 June 2024 – Security Baseline Inspection Report 05000250-2024401, 05000251-2024401 and 07200062-2024401 L-2024-076, Reply to Notice of Violation; NOV 05000250, 05000251/2024010-052024-05-29029 May 2024 Reply to Notice of Violation; NOV 05000250, 05000251/2024010-05 L-2024-082, 2023 Annual Radiological Environmental Operating Report2024-05-15015 May 2024 2023 Annual Radiological Environmental Operating Report IR 05000250/20240012024-05-10010 May 2024 Integrated Inspection Report 05000250/2024001 and 05000251/2024001 ML24135A0942024-05-0909 May 2024 Periodic Update to the Updated Final Safety Analysis Report ML24127A1862024-05-0909 May 2024 Request for Withholding Information from Public Disclosure L-2024-060, 10 CFR 50.59(d)(2) Evaluation and 10 CFR 50.71(e)(2) Technical Specification Bases Summaries Report2024-05-0909 May 2024 10 CFR 50.59(d)(2) Evaluation and 10 CFR 50.71(e)(2) Technical Specification Bases Summaries Report ML24127A0632024-05-0606 May 2024 Supplemental Information to License Amendment Request to Adopt Common Emergency Plan with Site-Specific Annexes L-2024-073, Cycle 34 Core Operating Limits Report2024-05-0101 May 2024 Cycle 34 Core Operating Limits Report L-2024-072, Cycle 33 Core Operating Limits Report2024-05-0101 May 2024 Cycle 33 Core Operating Limits Report L-2024-048, Divider Plate Assemblies Bounding Analysis Evaluation for Subsequent License Renewal Commitment Revision2024-04-30030 April 2024 Divider Plate Assemblies Bounding Analysis Evaluation for Subsequent License Renewal Commitment Revision L-2024-069, Radiological Emergency Plan Revision 762024-04-22022 April 2024 Radiological Emergency Plan Revision 76 L-2024-066, Sixth 10-Year Inservice Testing Interval Relief Request No. PR-022024-04-17017 April 2024 Sixth 10-Year Inservice Testing Interval Relief Request No. PR-02 2024-09-25
[Table view] |
Text
{{#Wiki_filter:ber 26, 2019
SUBJECT:
REISSUED INSPECTION REPORT - TURKEY POINT NUCLEAR GENERATING STATION UNITS 3 & 4 - INTEGRATED INSPECTION REPORT 05000250/2019003 AND 05000251/2019003
Dear Mr. Moul:
On October 25, 2019, the U.S. Nuclear Regulatory Commission (NRC) issued Inspection Report 05000250/2019003 and 05000251/2019003. This version of the report was categorized under ADAMS Accession Number ML19298B835.
After the inspection report was issued, the NRC identified that the Additional Tracking Items table did not include a listing for Licensee Event Report (LER) 05000250/2019-001-00, which was inspected and documented in Section 71153 of the inspection report. This error is being corrected by reissuing the affected inspection report, which now correctly lists LER 05000250/2019-001-00 in the Additional Tracking Items table. The LER is considered closed.
This reissued cover letter and attached report does not amend any information in the body of the attached report or change any NRC position that has been communicated in the previously issued report.
Sincerely,
/RA/
Randall A. Musser, Chief Reactor Projects Branch 3 Division of Reactor Projects Docket Nos. 05000250 and 05000251 License Nos. DPR-31 and DPR-41
Enclosure:
As stated
Inspection Report
Docket Numbers: 05000250 and 05000251 License Numbers: DPR-31 and DPR-41 Report Numbers: 05000250/2019003 and 05000251/2019003 Enterprise Identifier: I-2019-003-0020 Licensee: Florida Power & Light Company (FPL)
Facility: Turkey Point Units 3 & 4 Location: Homestead, FL 33035 Inspection Dates: July 01, 2019 to September 30, 2019 Inspectors: R. Carrion, Senior Reactor Inspector J. Orr, Senior Resident Inspector J. Reyes, Resident Inspector R. Taylor, Senior Project Engineer Approved By: Randall A. Musser, Chief Reactor Projects Branch 3 Division of Reactor Projects Enclosure
SUMMARY
The U.S. Nuclear Regulatory Commission (NRC) continued monitoring the licensees performance by conducting an integrated inspection at Turkey Point Units 3 & 4 in accordance with the Reactor Oversight Process. The Reactor Oversight Process is the NRCs program for overseeing the safe operation of commercial nuclear power reactors. Refer to https://www.nrc.gov/reactors/operating/oversight.html for more information.
List of Findings and Violations No findings or violations of more than minor significance were identified.
Additional Tracking Items Type Issue Number Title Report Section Status LER 05000250/2019-001-00 LER 2019-001-00 for Turkey 71153 Closed Point, Unit 3, Manual Reactor Trip Following Grid Disturbance
PLANT STATUS
Unit 3 began the inspection period at rated thermal power. On September 26, 2019, the unit was down powered to 30 percent to reduce radiation levels in containment for workers performing maintenance on the containment inboard exhaust purge valve POV-3-2603. The unit was returned to rated thermal power on September 29, 2019, and remained at or near rated thermal power for the remainder of the inspection period.
Unit 4 operated at or near rated thermal power for the entire inspection period.
INSPECTION SCOPES
Inspections were conducted using the appropriate portions of the inspection procedures (IPs) in effect at the beginning of the inspection unless otherwise noted. Currently approved IPs with their attached revision histories are located on the public website at http://www.nrc.gov/reading-rm/doc-collections/insp-manual/inspection-procedure/index.html. Samples were declared complete when the IP requirements most appropriate to the inspection activity were met consistent with Inspection Manual Chapter (IMC) 2515, Light-Water Reactor Inspection Program - Operations Phase. The inspectors performed plant status activities described in IMC 2515 Appendix D, Plant Status and conducted routine reviews using IP 71152, Problem Identification and Resolution. The inspectors reviewed selected procedures and records, observed activities, and interviewed personnel to assess licensee performance and compliance with Commission rules and regulations, license conditions, site procedures, and standards.
REACTOR SAFETY
71111.01 - Adverse Weather Protection Impending Severe Weather Sample (IP Section 03.03)
Main article: IP 71111.01
- (1) The inspectors evaluated readiness for impending adverse weather conditions for Hurricane Dorian from August 28 through September 3, 2019.
71111.04Q - Equipment Alignment Partial Walkdown Sample (IP Section 03.01)
Main article: IP 71111.04Q
- (1) A and B auxiliary feedwater (AFW) pumps while the C AFW pump was out of service (OOS) on July 2, 2019
- (2) Unit 3 and Unit 4 class 1E 125-Volt DC battery systems while the 4A battery was OOS and the spare class 1E battery was supplying the 4A DC bus on July 15, 16, and 19, 2019
- (3) Unit 3 and Unit 4 AFW train 1 and train 2 while the B AFW pump was OOS for emergent maintenance on July 30, 2019
- (4) 4A emergency diesel generator (EDG) while the 4B EDG was inoperable for a 24 hour endurance run on August 8, 2019
- (5) 3B and the spare class 1E station batteries and associated chargers, while the 3A battery was OOS for maintenance on September 9, 2019
- (6) 3B EDG while the 3A EDG was OOS to install new radiators, engine power packs, and overhaul on September 19, 20, 23 and 24, 2019
71111.05Q - Fire Protection Quarterly Inspection (IP Section 03.01)
Main article: IP 71111.05Q
- (1) Fire zones (FZs) 81, 82, 86 and 87 for the Unit 3 and Unit 4 start-up, auxiliary, and main transformers on July 01, 2019
- (2) FZs 45, 47, 54 and 55 for the Unit 3 and Unit 4 charging pump rooms and component cooling water pump rooms on July 01, 2019
- (3) FZ 122 for the electric and diesel driven fire pumps, jockey pumps, and raw water tank areas on August 12, 2019
- (4) FZs 30, 31, 38 and 40 for the Unit 3 and Unit 4 containment spray pump and pipe and valve rooms on August 15, 2019
- (5) FZs 4, 5, 6, 7, 8, and 9 for the 2 and 4 elevation common areas of the auxiliary building on August 21, 2019
- (6) FZs 25, 25A, 98, 101, and 104 for the Units 3 and Unit 4 cable spread room, electrical equipment room, Unit 4 B DC equipment room, Unit 3 A DC equipment room, and class 1E spare battery room on August 22, 2019
71111.06 - Flood Protection Measures Inspection Activities - Internal Flooding (IP Section 02.02a.)
Main article: IP 71111.06
- (1) Unit 3 and Unit 4 4kV switchgear rooms on July 8, August 6, 22, 23, and 26, 2019
71111.07T - Heat Sink Performance Triennial Review (IP Section 02.02)
Main article: IP 71111.07
- (1) 3B and 4A Component Cooling Water (CCW) Heat Exchangers, Cooled by Intake Cooling Water Section 02.02b
- (2) 3A and 4B Residual Heat Removal (RHR) Heat Exchangers, Closed Loop, Section 02.02c
- (3) Cooling Canals, Heat Sink, Section 02.02d, specifically Sections 02.02d#6 and 02.02d#7 were completed.
==71111.11Q - Licensed Operator Requalification Program and Licensed Operator Performance Licensed Operator Performance in the Actual Plant/Main Control Room (IP Section 03.01) (2 Samples)
- (1) The inspectors observed and evaluated licensed operator performance in the Main Control Room during an unannounced fire drill on September 17, 2019.
- (2) The inspectors observed and evaluated licensed operator performance in the Main Control Room during reactivity operations on Unit 3 while diluting the reactor coolant system boron concentration to maintain rated power, and during Unit 4 AFW train 2 surveillance testing on September 30, 2019.
Licensed Operator Requalification Training/Examinations (IP Section 03.02)==
Main article: IP 71111.11Q
- (1) The inspectors observed and evaluated a requalification training simulator scenario administered to an operating crew on August 20, 2019
71111.12 - Maintenance Effectiveness Routine Maintenance Effectiveness Inspection (IP Section 02.01)
Main article: IP 71111.12
The inspectors evaluated the effectiveness of routine maintenance activities associated with the following equipment and/or safety significant functions:
- (1) Action Request (AR) 2322902, B AFW pump tripped early at 6,403 rpm (event date was July 31, 2019), on August 26 and 28, and September 25 and 26, 2019.
Quality Control (IP Section 02.02) (1 Sample)
The inspectors evaluated maintenance and quality control activities associated with the following equipment performance activities:
- (1) Work Order (WO) 40224302, 3A EDG radiator core replacement, quality control sample on August 12, 15, 16, 19, and 20, and September 16, 2019.
71111.13 - Maintenance Risk Assessments and Emergent Work Control Risk Assessment and Management Sample (IP Section 03.01)
Main article: IP 71111.13
- (1) Unit 3 and Unit 4 online risk with BS-4-1403, basket strainer to intake cooling water (ICW) supply for the 4C CCW heat exchanger, and E232 condensing unit for the electric equipment room air handling unit V76 OOSs on July 1, 2019
- (2) Unit 3 and Unit 4 online risk with the 3A1 battery charger and the 3A CCW heat exchanger OOSs on July 16 and 19, 2019
- (3) Unit 3 and Unit 4 online risk with Unit 3 and Unit 4 AFW train 1 and A AFW pump OOSs and the Unit 4 control rods aligned for manual operation on August 12, 2019
- (4) Unit 3 and Unit 4 online risk with the Unit 3 and Unit 4 AFW train 1, Unit 3 ICW A header, and the 3B charging pump OOSs on September 11 and 12, 2019
- (5) Unit 3 and Unit 4 online risk with the 3A EDG, 3A charging pump, and the 4D 4kV switchgear room air conditioner 4S230 OOSs on September 16, 17, 19, and 20, 2019
71111.15 - Operability Determinations and Functionality Assessments Operability Determination or Functionality Assessment (IP Section 02.02)
Main article: IP 71111.15
- (1) AR 2321378, unsupported conduit in 3A battery room on August 7, 2019
- (2) AR 2320534, reactor coolant system response after inadvertent 3C charging pump trip on July 11, 2019
- (3) AR 2320780, 4B residual heat removal pump seal leak-off unsatisfactory during surveillance testing on July 12, 2019
- (4) AR 2323337, 4C ICW pump abnormal vibration on August 5, 8, and 12, 2019
- (5) AR 2325249, corroded through conduits resulting in a potential internal flood concern for the 4A and 4B 4kV switchgear rooms on August 22, 23, and September 12, 2019
- (6) AR 2328937, 3A EDG noise during post maintenance testing; AR 02328803, 3A EDG radiator fan shaft deflection; AR 2329174, 3A EDG high vibration data on generator outboard axial; and AR 2329403, 3A EDG engine analysis results for noise on cylinder #19 on September 24, 26, 27, and 30, 2019
==71111.18 - Plant Modifications Temporary Modifications and/or Permanent Modifications (IP Section 03.01 and/or 03.02) (2 Samples)
- (1) Engineering Change (EC) 293163 dewetron recorder and current transformers at 4A 480V load center for ground monitoring on August 21 and 22, 2019
- (2) EC 293789, fabrication of a new washer and gasket for use on taper pin in Unit 3 containment purge exhaust inboard valve, POV-3-2603 on September 27 and 30, 2019
71111.19 - Post-Maintenance Testing Post-Maintenance Test Sample (IP Section 03.01)
Main article: [[=
=IP 71111.18|count=8}}
- (1) 0-SME-003.15, Station Battery 60 Month Maintenance after 4A battery bank replacement, WO 40598604
- (2) 3-OSP-075.2, Auxiliary Feedwater Train 2 Operability Verification and 0-OSP-075.11, Auxiliary Feedwater Inservice Test after B AFW pump governor replacement, WO
===40555048
- (3) 3-OSP-023.1, Diesel Generator Operability Test after 3A EDG radiator core replacement, WO 40224302
- (4) 4-OSP-047.1A, Charging Pump 4A Group A Pump Test after crankcase oil change, interlock control pressure switch replacement, oil pump drive chain and suction stabilizer maintenance, WOs 40569110, 40609831, 40632633, and 40680407
- (5) 0-SME-003.15, Station Battery 60 Month Maintenance after 3A battery bank replacement, WO 40569388
- (6) 0-OSP-075.11, Auxiliary Feedwater Inservice Test after repair of the A AFW pump inboard journal bearing seal plates, WO 40682368
- (7) 3-OSP-023.1, Diesel Generator Operability Test after 3A EDG power pack replacement and overhaul, WO 40537362
- (8) 3-OSP-051.5, Local Leak Rate Tests, after 3-POV-2603, Unit 3 containment purge exhaust inboard valve modification that installed a machined washer and seal on the tapered locked pin, WO 40387403
71111.22 - Surveillance Testing Surveillance Tests (other) (IP Section 03.01)
Main article: IP 71111.22
- (1) 3-OSP-202.2, RHR Pump and Piping Venting; 3-OSP-068.2, Containment Spray Gas Accumulation Management Program; and 0-OSP-202.3, Safety Injection Pump and Piping Venting, on July 25, 2019
- (2) 4-OSP-023.2, 4B Diesel Generator 24 Hour Full Load Test, on August 6, 2019 Inservice Testing (IP Section 03.01) ===
- (1) 3-OSP-062.2B, Safety Injection Pump 3B Group Pump Test, on July 5, 2019
==71114.06 - Drill Evaluation Select Emergency Preparedness Drills and/or Training for Observation (IP Section 03.01) (1 Sample)
The inspectors evaluated:
- (1) Emergency preparedness drill in the simulator control room, technical support center and the emergency operating facility, on August 8,
OTHER ACTIVITIES - BASELINE
=71151 - Performance Indicator Verification MS05: Safety System Functional Failures (SSFFs) Sample (IP Section 02.04)
Main article: IP 71114.06
- (1) Unit 3 July 2018 through June 2019
- (2) Unit 4 July 2018 through June 2019
71152 - Problem Identification and Resolution Annual Follow-up of Selected Issues (IP Section 02.03)
- (1) AR 232037, B AFW pump overspeed cam device not returned to required normal position causing overspeed trip during test. This issue was selected for follow-up to verify FPL's corrective actions were appropriate to address clarifications to procedural ambiguities that contributed to the overspeed trip and additional unavailability of the B AFW pump.
- (2) AR 1823645 & 2306639, foreign material concerns in CCW systems due to degradation of valve rubber seats. This issue was selected for follow-up to ensure FPL intended to perform extent of condition inspections for a population of CCW rubber seated valves that if degraded could introduce foreign material in the Unit 3 and Unit 4 CCW systems.
- (3) AR 2170587, tornado missile protection walkdowns. This issue was selected to verify that FPL resolved any identified tornado missile protection vulnerabilities that were not in conformance with Turkey Point's current license basis.
71153 - Followup of Events and Notices of Enforcement Discretion Event Report (IP Section 03.02) ===
- (1) LER 05000250/2019-001-00, Unit 3 Manual Reactor Trip Following Grid Disturbance (ADAMS accession: ML19179A290): The inspectors determined that it was not reasonable to foresee or correct the cause discussed in the LER therefore no performance deficiency was identified. The inspectors also concluded that no violation of NRC requirements occurred. The circumstances surrounding this LER are documented in Inspection Report 05000250/2019002 and 05000251/2019002 Section 71153 (ADAMS Accession No. ML19219B126).
INSPECTION RESULTS
No findings were identified.
EXIT MEETINGS AND DEBRIEFS
The inspectors verified no proprietary information was retained or documented in this report.
- On October 10, 2019, the inspectors presented the integrated inspection results to Mr.
Brian Stamp, Site Director, and other members of the licensee staff.
- On July 18, 2019, the inspectors presented the heat sink inspection results to Brian Stamp, Site Director, and other members of the licensee staff.
DOCUMENTS REVIEWED
Inspection Type Designation Description or Title Revision or
Procedure Date
71111.07T Drawings 5610-C-1168 Cooling Canals System Layout, Sheet 1 Revision 10
5610-C-1168 Cooling Canals System Layout, Sheet 2 Revision 5
5613-M-3019 Intake Cooling Water System, Sheet 1 Revision 41
5613-M-3019 Intake Cooling Water System, Sheet 2 Revision 30
5613-M-3030 Component Cooling Water System, Sheet 1 Revision 27
5613-M-3030 Component Cooling Water System, Sheet 2 Revision 20
5614-M-3019 Intake Cooling Water System, Sheet 1 Revision 39
5614-M-3019 Intake Cooling Water System, Sheet 2 Revision 28
5614-M-3030 Component Cooling Water System, Sheet 1 Revision 32
5614-M-3030 Component Cooling Water System, Sheet 2 Revision 25
Miscellaneous Component Cooling Water System Health Reports for Unit 4
from 1st Quarter 2018 through 2nd Quarter 2019
Component Cooling Water Units 3 and 4 Heat Exchanger
Operability Curves from October 2017 through July 2019
(Selected weekly curves were reviewed.)
Intake Cooling Water System Health Reports for Unit 3 from
1st Quarter 2018 through 2nd Quarter 2019
Intake Cooling Water System Health Reports for Unit 4 from
1st Quarter 2018 through 2nd Quarter 2019
Unit 3 Component Cooling Water System Flow Balance for
2017
Unit 3 Component Cooling Water System Flow Balance for
2018
Unit 3 ICW Crawl-Thru Inspection of B Header, C Pump as dated
related to Work Order 40526237 01 10/14/2018
Unit 4 Component Cooling Water System Flow Balance for dated
2017 10/25/17
Unit 4 Component Cooling Water System Flow Balance for
2019
Component Cooling Water System Health Reports for Unit 3
from 1st Quarter 2018 through 2nd Quarter 2019
5610-019-DB-001 Design Basis Document: Determination of Affects on Revision 11
Inspection Type Designation Description or Title Revision or
Procedure Date
Accident Analyses
5610-019-DB-002 Component Design Requirements: Intake Cooling Water Revision 11
System
5610-030-DB-001 Design Basis Document: Component Cooling Water System Revision 8
5610-030-DB-002 Component Design Requirements: Component Cooling Revised
Water System 01/27/2016
5610-050-DB-001 Design Basis Documents: Determination of Affects on Revision 11
Accident Analyses
5610-050-DB-002 Component Design Requirements Document: Residual Heat Revision 11
Removal System
Florida Power & Engineering Design of the Turkey Point Cooling Reservoir dated June
Light Company 1972
Environmental
Engineering
Report No. 72-8
SPEC-M-081 CCW Heat Exchangers Tube Integrity Inspection Turkey Revision 1
Point Units 3 and 4 and St. Lucie Units 1 and 2
SPEC-M-086 Intake Cooling Water System Piping Inspection Revision 0
Procedures 0-ADM-651 Nuclear Chemistry Parameters Manual Revision 11
0-PMM-030.01 CCW Heat Exchanger Cleaning and Inspection Revision 6
0-PMM-030.04 CCW Heat Exchanger Cleaning and Tube Plugging Revision 1
3-OSP-019.4 Component Cooling Water Heat Exchanger Performance Revision 8
Monitoring
3-OSP-030.4 Component Cooling Water Heat Exchanger Performance Revision 16
Test
4-OSP-019.4 Component Cooling Water Heat Exchanger Performance Revision 9
Monitoring
4-OSP-030.4 Component Cooling Water Heat Exchanger Performance Revision 8
Test
CY-TP-104-0031 Component Cooling Water Sampling Revision 0B
10|=
=IP 71111.18|count=8}}
- (1) 0-SME-003.15, Station Battery 60 Month Maintenance after 4A battery bank replacement, WO 40598604
- (2) 3-OSP-075.2, Auxiliary Feedwater Train 2 Operability Verification and 0-OSP-075.11, Auxiliary Feedwater Inservice Test after B AFW pump governor replacement, WO
===40555048
- (3) 3-OSP-023.1, Diesel Generator Operability Test after 3A EDG radiator core replacement, WO 40224302
- (4) 4-OSP-047.1A, Charging Pump 4A Group A Pump Test after crankcase oil change, interlock control pressure switch replacement, oil pump drive chain and suction stabilizer maintenance, WOs 40569110, 40609831, 40632633, and 40680407
- (5) 0-SME-003.15, Station Battery 60 Month Maintenance after 3A battery bank replacement, WO 40569388
- (6) 0-OSP-075.11, Auxiliary Feedwater Inservice Test after repair of the A AFW pump inboard journal bearing seal plates, WO 40682368
- (7) 3-OSP-023.1, Diesel Generator Operability Test after 3A EDG power pack replacement and overhaul, WO 40537362
- (8) 3-OSP-051.5, Local Leak Rate Tests, after 3-POV-2603, Unit 3 containment purge exhaust inboard valve modification that installed a machined washer and seal on the tapered locked pin, WO 40387403
71111.22 - Surveillance Testing Surveillance Tests (other) (IP Section 03.01)
Main article: IP 71111.22
- (1) 3-OSP-202.2, RHR Pump and Piping Venting; 3-OSP-068.2, Containment Spray Gas Accumulation Management Program; and 0-OSP-202.3, Safety Injection Pump and Piping Venting, on July 25, 2019
- (2) 4-OSP-023.2, 4B Diesel Generator 24 Hour Full Load Test, on August 6, 2019 Inservice Testing (IP Section 03.01) ===
- (1) 3-OSP-062.2B, Safety Injection Pump 3B Group Pump Test, on July 5, 2019
==71114.06 - Drill Evaluation Select Emergency Preparedness Drills and/or Training for Observation (IP Section 03.01) (1 Sample)
The inspectors evaluated:
- (1) Emergency preparedness drill in the simulator control room, technical support center and the emergency operating facility, on August 8,
OTHER ACTIVITIES - BASELINE
=71151 - Performance Indicator Verification MS05: Safety System Functional Failures (SSFFs) Sample (IP Section 02.04)
Main article: IP 71114.06
- (1) Unit 3 July 2018 through June 2019
- (2) Unit 4 July 2018 through June 2019
71152 - Problem Identification and Resolution Annual Follow-up of Selected Issues (IP Section 02.03)
- (1) AR 232037, B AFW pump overspeed cam device not returned to required normal position causing overspeed trip during test. This issue was selected for follow-up to verify FPL's corrective actions were appropriate to address clarifications to procedural ambiguities that contributed to the overspeed trip and additional unavailability of the B AFW pump.
- (2) AR 1823645 & 2306639, foreign material concerns in CCW systems due to degradation of valve rubber seats. This issue was selected for follow-up to ensure FPL intended to perform extent of condition inspections for a population of CCW rubber seated valves that if degraded could introduce foreign material in the Unit 3 and Unit 4 CCW systems.
- (3) AR 2170587, tornado missile protection walkdowns. This issue was selected to verify that FPL resolved any identified tornado missile protection vulnerabilities that were not in conformance with Turkey Point's current license basis.
71153 - Followup of Events and Notices of Enforcement Discretion Event Report (IP Section 03.02) ===
- (1) LER 05000250/2019-001-00, Unit 3 Manual Reactor Trip Following Grid Disturbance (ADAMS accession: ML19179A290): The inspectors determined that it was not reasonable to foresee or correct the cause discussed in the LER therefore no performance deficiency was identified. The inspectors also concluded that no violation of NRC requirements occurred. The circumstances surrounding this LER are documented in Inspection Report 05000250/2019002 and 05000251/2019002 Section 71153 (ADAMS Accession No. ML19219B126).
INSPECTION RESULTS
No findings were identified.
EXIT MEETINGS AND DEBRIEFS
The inspectors verified no proprietary information was retained or documented in this report.
- On October 10, 2019, the inspectors presented the integrated inspection results to Mr.
Brian Stamp, Site Director, and other members of the licensee staff.
- On July 18, 2019, the inspectors presented the heat sink inspection results to Brian Stamp, Site Director, and other members of the licensee staff.
DOCUMENTS REVIEWED
Inspection Type Designation Description or Title Revision or
Procedure Date
71111.07T Drawings 5610-C-1168 Cooling Canals System Layout, Sheet 1 Revision 10
5610-C-1168 Cooling Canals System Layout, Sheet 2 Revision 5
5613-M-3019 Intake Cooling Water System, Sheet 1 Revision 41
5613-M-3019 Intake Cooling Water System, Sheet 2 Revision 30
5613-M-3030 Component Cooling Water System, Sheet 1 Revision 27
5613-M-3030 Component Cooling Water System, Sheet 2 Revision 20
5614-M-3019 Intake Cooling Water System, Sheet 1 Revision 39
5614-M-3019 Intake Cooling Water System, Sheet 2 Revision 28
5614-M-3030 Component Cooling Water System, Sheet 1 Revision 32
5614-M-3030 Component Cooling Water System, Sheet 2 Revision 25
Miscellaneous Component Cooling Water System Health Reports for Unit 4
from 1st Quarter 2018 through 2nd Quarter 2019
Component Cooling Water Units 3 and 4 Heat Exchanger
Operability Curves from October 2017 through July 2019
(Selected weekly curves were reviewed.)
Intake Cooling Water System Health Reports for Unit 3 from
1st Quarter 2018 through 2nd Quarter 2019
Intake Cooling Water System Health Reports for Unit 4 from
1st Quarter 2018 through 2nd Quarter 2019
Unit 3 Component Cooling Water System Flow Balance for
2017
Unit 3 Component Cooling Water System Flow Balance for
2018
Unit 3 ICW Crawl-Thru Inspection of B Header, C Pump as dated
related to Work Order 40526237 01 10/14/2018
Unit 4 Component Cooling Water System Flow Balance for dated
2017 10/25/17
Unit 4 Component Cooling Water System Flow Balance for
2019
Component Cooling Water System Health Reports for Unit 3
from 1st Quarter 2018 through 2nd Quarter 2019
5610-019-DB-001 Design Basis Document: Determination of Affects on Revision 11
Inspection Type Designation Description or Title Revision or
Procedure Date
Accident Analyses
5610-019-DB-002 Component Design Requirements: Intake Cooling Water Revision 11
System
5610-030-DB-001 Design Basis Document: Component Cooling Water System Revision 8
5610-030-DB-002 Component Design Requirements: Component Cooling Revised
Water System 01/27/2016
5610-050-DB-001 Design Basis Documents: Determination of Affects on Revision 11
Accident Analyses
5610-050-DB-002 Component Design Requirements Document: Residual Heat Revision 11
Removal System
Florida Power & Engineering Design of the Turkey Point Cooling Reservoir dated June
Light Company 1972
Environmental
Engineering
Report No. 72-8
SPEC-M-081 CCW Heat Exchangers Tube Integrity Inspection Turkey Revision 1
Point Units 3 and 4 and St. Lucie Units 1 and 2
SPEC-M-086 Intake Cooling Water System Piping Inspection Revision 0
Procedures 0-ADM-651 Nuclear Chemistry Parameters Manual Revision 11
0-PMM-030.01 CCW Heat Exchanger Cleaning and Inspection Revision 6
0-PMM-030.04 CCW Heat Exchanger Cleaning and Tube Plugging Revision 1
3-OSP-019.4 Component Cooling Water Heat Exchanger Performance Revision 8
Monitoring
3-OSP-030.4 Component Cooling Water Heat Exchanger Performance Revision 16
Test
4-OSP-019.4 Component Cooling Water Heat Exchanger Performance Revision 9
Monitoring
4-OSP-030.4 Component Cooling Water Heat Exchanger Performance Revision 8
Test
CY-TP-104-0031 Component Cooling Water Sampling Revision 0B
10]] [[IP sample::=
=IP 71111.18|count=8}}
- (1) 0-SME-003.15, Station Battery 60 Month Maintenance after 4A battery bank replacement, WO 40598604
- (2) 3-OSP-075.2, Auxiliary Feedwater Train 2 Operability Verification and 0-OSP-075.11, Auxiliary Feedwater Inservice Test after B AFW pump governor replacement, WO
===40555048
- (3) 3-OSP-023.1, Diesel Generator Operability Test after 3A EDG radiator core replacement, WO 40224302
- (4) 4-OSP-047.1A, Charging Pump 4A Group A Pump Test after crankcase oil change, interlock control pressure switch replacement, oil pump drive chain and suction stabilizer maintenance, WOs 40569110, 40609831, 40632633, and 40680407
- (5) 0-SME-003.15, Station Battery 60 Month Maintenance after 3A battery bank replacement, WO 40569388
- (6) 0-OSP-075.11, Auxiliary Feedwater Inservice Test after repair of the A AFW pump inboard journal bearing seal plates, WO 40682368
- (7) 3-OSP-023.1, Diesel Generator Operability Test after 3A EDG power pack replacement and overhaul, WO 40537362
- (8) 3-OSP-051.5, Local Leak Rate Tests, after 3-POV-2603, Unit 3 containment purge exhaust inboard valve modification that installed a machined washer and seal on the tapered locked pin, WO 40387403
71111.22 - Surveillance Testing Surveillance Tests (other) (IP Section 03.01)
Main article: IP 71111.22
- (1) 3-OSP-202.2, RHR Pump and Piping Venting; 3-OSP-068.2, Containment Spray Gas Accumulation Management Program; and 0-OSP-202.3, Safety Injection Pump and Piping Venting, on July 25, 2019
- (2) 4-OSP-023.2, 4B Diesel Generator 24 Hour Full Load Test, on August 6, 2019 Inservice Testing (IP Section 03.01) ===
- (1) 3-OSP-062.2B, Safety Injection Pump 3B Group Pump Test, on July 5, 2019
==71114.06 - Drill Evaluation Select Emergency Preparedness Drills and/or Training for Observation (IP Section 03.01) (1 Sample)
The inspectors evaluated:
- (1) Emergency preparedness drill in the simulator control room, technical support center and the emergency operating facility, on August 8,
OTHER ACTIVITIES - BASELINE
=71151 - Performance Indicator Verification MS05: Safety System Functional Failures (SSFFs) Sample (IP Section 02.04)
Main article: IP 71114.06
- (1) Unit 3 July 2018 through June 2019
- (2) Unit 4 July 2018 through June 2019
71152 - Problem Identification and Resolution Annual Follow-up of Selected Issues (IP Section 02.03)
- (1) AR 232037, B AFW pump overspeed cam device not returned to required normal position causing overspeed trip during test. This issue was selected for follow-up to verify FPL's corrective actions were appropriate to address clarifications to procedural ambiguities that contributed to the overspeed trip and additional unavailability of the B AFW pump.
- (2) AR 1823645 & 2306639, foreign material concerns in CCW systems due to degradation of valve rubber seats. This issue was selected for follow-up to ensure FPL intended to perform extent of condition inspections for a population of CCW rubber seated valves that if degraded could introduce foreign material in the Unit 3 and Unit 4 CCW systems.
- (3) AR 2170587, tornado missile protection walkdowns. This issue was selected to verify that FPL resolved any identified tornado missile protection vulnerabilities that were not in conformance with Turkey Point's current license basis.
71153 - Followup of Events and Notices of Enforcement Discretion Event Report (IP Section 03.02) ===
- (1) LER 05000250/2019-001-00, Unit 3 Manual Reactor Trip Following Grid Disturbance (ADAMS accession: ML19179A290): The inspectors determined that it was not reasonable to foresee or correct the cause discussed in the LER therefore no performance deficiency was identified. The inspectors also concluded that no violation of NRC requirements occurred. The circumstances surrounding this LER are documented in Inspection Report 05000250/2019002 and 05000251/2019002 Section 71153 (ADAMS Accession No. ML19219B126).
INSPECTION RESULTS
No findings were identified.
EXIT MEETINGS AND DEBRIEFS
The inspectors verified no proprietary information was retained or documented in this report.
- On October 10, 2019, the inspectors presented the integrated inspection results to Mr.
Brian Stamp, Site Director, and other members of the licensee staff.
- On July 18, 2019, the inspectors presented the heat sink inspection results to Brian Stamp, Site Director, and other members of the licensee staff.
DOCUMENTS REVIEWED
Inspection Type Designation Description or Title Revision or
Procedure Date
71111.07T Drawings 5610-C-1168 Cooling Canals System Layout, Sheet 1 Revision 10
5610-C-1168 Cooling Canals System Layout, Sheet 2 Revision 5
5613-M-3019 Intake Cooling Water System, Sheet 1 Revision 41
5613-M-3019 Intake Cooling Water System, Sheet 2 Revision 30
5613-M-3030 Component Cooling Water System, Sheet 1 Revision 27
5613-M-3030 Component Cooling Water System, Sheet 2 Revision 20
5614-M-3019 Intake Cooling Water System, Sheet 1 Revision 39
5614-M-3019 Intake Cooling Water System, Sheet 2 Revision 28
5614-M-3030 Component Cooling Water System, Sheet 1 Revision 32
5614-M-3030 Component Cooling Water System, Sheet 2 Revision 25
Miscellaneous Component Cooling Water System Health Reports for Unit 4
from 1st Quarter 2018 through 2nd Quarter 2019
Component Cooling Water Units 3 and 4 Heat Exchanger
Operability Curves from October 2017 through July 2019
(Selected weekly curves were reviewed.)
Intake Cooling Water System Health Reports for Unit 3 from
1st Quarter 2018 through 2nd Quarter 2019
Intake Cooling Water System Health Reports for Unit 4 from
1st Quarter 2018 through 2nd Quarter 2019
Unit 3 Component Cooling Water System Flow Balance for
2017
Unit 3 Component Cooling Water System Flow Balance for
2018
Unit 3 ICW Crawl-Thru Inspection of B Header, C Pump as dated
related to Work Order 40526237 01 10/14/2018
Unit 4 Component Cooling Water System Flow Balance for dated
2017 10/25/17
Unit 4 Component Cooling Water System Flow Balance for
2019
Component Cooling Water System Health Reports for Unit 3
from 1st Quarter 2018 through 2nd Quarter 2019
5610-019-DB-001 Design Basis Document: Determination of Affects on Revision 11
Inspection Type Designation Description or Title Revision or
Procedure Date
Accident Analyses
5610-019-DB-002 Component Design Requirements: Intake Cooling Water Revision 11
System
5610-030-DB-001 Design Basis Document: Component Cooling Water System Revision 8
5610-030-DB-002 Component Design Requirements: Component Cooling Revised
Water System 01/27/2016
5610-050-DB-001 Design Basis Documents: Determination of Affects on Revision 11
Accident Analyses
5610-050-DB-002 Component Design Requirements Document: Residual Heat Revision 11
Removal System
Florida Power & Engineering Design of the Turkey Point Cooling Reservoir dated June
Light Company 1972
Environmental
Engineering
Report No. 72-8
SPEC-M-081 CCW Heat Exchangers Tube Integrity Inspection Turkey Revision 1
Point Units 3 and 4 and St. Lucie Units 1 and 2
SPEC-M-086 Intake Cooling Water System Piping Inspection Revision 0
Procedures 0-ADM-651 Nuclear Chemistry Parameters Manual Revision 11
0-PMM-030.01 CCW Heat Exchanger Cleaning and Inspection Revision 6
0-PMM-030.04 CCW Heat Exchanger Cleaning and Tube Plugging Revision 1
3-OSP-019.4 Component Cooling Water Heat Exchanger Performance Revision 8
Monitoring
3-OSP-030.4 Component Cooling Water Heat Exchanger Performance Revision 16
Test
4-OSP-019.4 Component Cooling Water Heat Exchanger Performance Revision 9
Monitoring
4-OSP-030.4 Component Cooling Water Heat Exchanger Performance Revision 8
Test
CY-TP-104-0031 Component Cooling Water Sampling Revision 0B
10| ]]