November 26, 2019
SUBJECT:
TURKEY POINT NUCLEAR PLANT, UNITS 3 AND 4 - NRC SECURITY INSPECTION REPORT 05000250/2019411 AND 05000251/2019411
Dear Mr. Fletcher:
On October 30, 2019, the U.S. Nuclear Regulatory Commission (NRC) completed a security inspection at your Turkey Point Nuclear Plant, Units 3 and 4, and discussed the results of this inspection with Brian Stamp and other members of his staff. The results of this inspection are documented in the enclosed report.
No NRC-Identified or self-revealing findings were identified during the inspections.
This letter will be made available for public inspection and copying at https://www.nrc.gov/reading-rm/adams.html and at the NRC Public Document Room, in accordance with 10 CFR 2.390, Public Inspections, Exemptions, Requests for Withholding.
Sincerely,
/RA/
Binoy Desai, Chief Plant Support Branch Division of Reactor Safety
Docket Nos: 50-250 and 50-251 License Nos: DPR-31 and DPR-41
Enclosure:
NRC IR 05000250/2019411, and 251/2019411
cc: (See page 3)
SUMMARY
The U.S. Nuclear Regulatory Commission (NRC) continued monitoring the licensees performance by conducting a Baseline Security Inspection at Turkey Point Nuclear Plant, Units and 4, in accordance with the Reactor Oversight Process. The Reactor Oversight Process is the NRCs program for overseeing the safe operation of commercial nuclear power reactors.
Refer to https://www.nrc.gov/reactors/operating/oversight.html for more information.
List of Findings and Violations
No findings were identified.
INSPECTION SCOPE
Inspections were conducted using the appropriate portions of the inspection procedures (IPs) in effect at the beginning of the inspection unless otherwise noted. Samples were declared complete when the IP requirements most appropriate to the inspection activity were met consistent with Inspection Manual Chapter (IMC) 2201, Security Inspection Program for Commercial Nuclear Power Reactors. The inspectors reviewed selected procedures and records, observed activities, and interviewed personnel to assess licensee performance and compliance with Commission rules and regulations, license conditions, site procedures, and standards.
SAFEGUARDS
71130.05 - Protective Strategy Evaluation
The inspectors evaluated the Protective Strategy and Security Performance Evaluation Program. The following elements were evaluated from this IP dated January 1, 2019:
Protective Strategy Evaluation (2 Samples)
(1)
- TIER I: all requirements
- TIER II: 02.05 (a); 02.06 (a - g), (l - n); 02.07 (a - c)
- TIER III: 02.08; 02.09 (b), (c); 02.11 (a)
- (2) The inspectors observed the performance of a licensee conducted exercise.
EXIT MEETINGS AND DEBRIEFS
On October 30, 2019, the inspectors presented the Baseline Security Inspection results to Mr. B. Stamp and other members of the licensee staff.
DOCUMENTS REVIEWED
Inspection
Procedure
Type
Designation
Description of Title
Revision No.
Procedures
New Hire Training and Qualification
Security Drills and Exercises
Drill and Exercise Controller Training
Adversary Force Training
Safety/Security Interface
PTN-SY-025
Defensive Strategy Plan
PTN-SY-026
Target Sets
PTN-SY-029
LLEA Integrated Response Plan
PTN-SY-032
Access During Drills and Exercises
Condition
Reports
2332801
711030.05 Roll-up of Comments and Observations
10/25/2019
294891
PTN 2018 4th Quarter FOF Drill Roll-up
2303220
2019 Security FOF Drill 1 Rescheduled / Plant Cond.
2303762
Friendly Fire Trend During FOF Exercises
2312889
RP Defensive Positions
2316541
Security Duty Performance Challenge
2324757
Security Equipment Response Box Evaluation
2331214
2019 3rd Quarter FOF Drill Roll-up