Category:Inspection Report
MONTHYEARIR 05000250/20240102024-01-0505 January 2024 Focused Engineering Inspection 05000250/2024010 and 05000251/2024010 IR 05000250/20230032023-11-0909 November 2023 Integrated Inspection Report 05000250/2023003 and 05000251/2023003 IR 05000250/20230102023-09-29029 September 2023 Biennial Problem Identification and Resolution Inspection Report 05000250/2023010 and 05000251/2023010 IR 05000250/20230052023-08-21021 August 2023 Updated Inspection Plan for Turkey Point, Units 3 & 4 (Report 05000250/2023005 and 05000251/2023005) IR 05000250/20230022023-08-14014 August 2023 Integrated Inspection Report 05000250/2023002 and 05000251/2023002 IR 05000250/20234022023-06-12012 June 2023 Security Baseline Inspection Report 05000250/2023402 and 05000251/2023402 IR 05000250/20233012023-05-17017 May 2023 NRC Operator License Examination Report 05000250/2023301 and 05000251/2023301 IR 05000250/20230012023-05-12012 May 2023 Integrated Inspection Report 05000250/2023001 and 05000251/2023001 IR 05000250/20220062023-03-0101 March 2023 Annual Assessment Letter for Turkey Point, Units 3 & 4 (Report 05000250/2022006 and 05000251/2022006) IR 05000250/20220042023-01-27027 January 2023 Integrated Inspection Report 05000250/2022004 and 05000251/2022004 IR 05000250/20220112022-12-20020 December 2022 Design Basis Assurance Inspection (Programs) Inspection Report 05000250/2022011 and 05000251/2022011 IR 05000250/20220102022-11-29029 November 2022 Triennial Fire Protection Inspection Report 05000250/2022010 and 05000251/2022010 IR 05000250/20224022022-11-0707 November 2022 Security Baseline Inspection Report 05000250 2022402 and 05000251 2022402 IR 05000250/20220032022-10-31031 October 2022 Integrated Inspection Report 05000250/2022003 and 05000251/2022003 ML22286A1262022-10-28028 October 2022 Review of the Fall 2021 Steam Generator Tube Inspections During Refueling Outage No. 32 IR 05000250/20234012022-10-19019 October 2022 Information Request for the Cyber-Security Baseline Inspection, Notification to Perform Inspection 05000250/2023401 and 05000251/2023401 IR 05000250/20220052022-08-26026 August 2022 Updated Inspection Plan for Turkey Point Units 3 & 4 Report 05000250 2022005 and 05000251 2022005-Final ML22229A5332022-08-18018 August 2022 Notification of Target Set Inspection and Request for Information (NRC Inspection Report No. 05000250 2022402 and 05000251 2022402) IR 05000250/20220022022-08-12012 August 2022 Integrated Inspection Report 05000250/2022002 and 05000251/2022002 IR 05000250/20220012022-05-11011 May 2022 Integrated Inspection Report 05000250/2022001 and 05000251/2022001 L-2022-072, Steam Generator Tube Inspection Report2022-05-0606 May 2022 Steam Generator Tube Inspection Report IR 05000250/20224012022-03-0808 March 2022 Security Baseline Inspection Report 05000250/2022401 and 05000251/2022401(U) IR 05000250/20210062022-03-0202 March 2022 Annual Assessment Letter for Turkey Point, Units 3 and 4 (Report No. 05000250/2021006 and 05000251/2021006) IR 05000250/20210042022-02-0202 February 2022 Integrated Inspection Report 05000250/2021004 and 05000251/2021004 IR 05000250/20210032021-11-0303 November 2021 Integrated Inspection Report 05000250/2021003 and 05000251/2021003 IR 05000250/20210072021-11-0303 November 2021 Follow-Up Assessment Letter Report 05000250/2021007 IR 05000250/20210402021-09-30030 September 2021 95001 Supplemental Inspection Report 05000250/2021040 and 05000251/2021040 IR 05000250/20210052021-08-25025 August 2021 Updated Inspection Plan for Turkey Point, Units 3 & 4 (Report 05000250/2021005 and 05000251/2021005) IR 05000250/20210022021-08-0404 August 2021 Integrated Inspection Report 05000250/2021002 and 05000251/2021002 IR 07200062/20210012021-07-21021 July 2021 Operation of an Independent Spent Fuel Storage Installation Report 07200062/2021001 IR 05000250/20214012021-06-11011 June 2021 Security Baseline Inspection Report 05000250/2021401, 05000251/2021401, and 07200062/2021401 IR 05000250/20210012021-05-0707 May 2021 Integrated Inspection Report 05000250/2021001 and 05000251/2021001 and Assessment Follow-Up Letter IR 05000250/20210122021-05-0505 May 2021 Biennial Problem Identification and Resolution Inspection Report 05000250/2021012 and 05000251/2021012 IR 05000250/20214202021-04-29029 April 2021 Security Baseline Inspection Report 05000250/2021420 and 05000251/2021420 Cover Letter IR 05000250/20213012021-04-10010 April 2021 NRC Operator License Examination Report 05000250/2021301 and 05000251/2021301 IR 05000250/20210902021-04-0606 April 2021 Notice of Violation and Proposed Imposition of Civil Penalty $150,000, NRC Inspection Report Nos.05000250/2021090 and 05000251/2021090; Investigation Report Nos. 2-2019-011 and 2-2019-025 Exercise of Enforcement Discretion IR 05000250/20200062021-03-0303 March 2021 Annual Assessment Letter for Turkey Point Nuclear Plant, Unit 3 and Unit 4 Report 05000250/2020006 and 05000251/2020006 IR 05000250/20210102021-02-26026 February 2021 Triennial Inspection of Evaluation of Changes, Tests and Experiments Baseline Inspection Report 05000250/2021010 and 05000251/2021010 IR 05000250/20204022021-02-12012 February 2021 Material Control and Accounting Program Inspection Report 05000250/2020402 and 05000251/2020402 Public Version (Cover Letter Only) IR 05000250/20200042021-02-11011 February 2021 Integrated Inspection Report 05000250/2020004 and 05000251/2020004 and Independent Spent Fuel Storage Installation Inspection (ISFSI) 07200062/2020002 IR 05000250/20210112021-02-0404 February 2021 NRC Inspection Report 05000250/2021011 and 05000251/2021011, and Investigation Report 2-2019-025; and Apparent Violations IR 05000250/20204012020-12-14014 December 2020 Security Baseline Inspection Report 05000250/2020401 and 05000251/2020401 IR 05000250/20200502020-12-0909 December 2020 Special Inspection Report 05000250/2020050 and 05000251/2020050 IR 05000250/20200032020-11-0404 November 2020 Integrated Inspection Report 05000250/2020003 and 05000251/2020003 IR 05000250/20200022020-08-10010 August 2020 Integrated Inspection Report 05000250/2020002, 05000251/2020002, and Independent Spent Fuel Storage Installation Inspection (ISFSI) 07200062/2020001 IR 05000250/20200112020-07-23023 July 2020 NRC Inspection Report 05000250-2020011 and 05000251-2020011 and Investigation Report 2-2019-011; and Apparent Violation Final IR 05000250/20200012020-05-0707 May 2020 Integrated Inspection Report 05000250/2020001 and 05000251/2020001 IR 05000250/20204112020-04-17017 April 2020 Cyber Security Inspection Report 05000250/2020411 and 05000251/2020411 IR 05000250/20200102020-03-30030 March 2020 Design Basis Assurance Inspection (Teams) Inspection Report 05000250/2020010 and 05000251/2020010 IR 05000250/20190042020-01-30030 January 2020 Integrated Inspection Report 05000250/2019004 and 05000251/2019004 and Independent Spent Fuel Storage Installation Inspection (ISFSI) Report 07200062/2019001 2024-01-05
[Table view] Category:Letter
MONTHYEARML24023A0342024-02-0505 February 2024 Exemption from Select Requirements of 10 CFR Part 73 (EPID L-2023-LLE-0038 (Security Notifications, Reports, and Recordkeeping and Suspicious Activity Reporting)) L-2024-010, Point Units 3 and 4, Seabrook, Duane Arnold, and Point Beach Units 1 and 2, Nuclear Property Insurance - 10 CFR 50.54(w)(3)2024-01-25025 January 2024 Point Units 3 and 4, Seabrook, Duane Arnold, and Point Beach Units 1 and 2, Nuclear Property Insurance - 10 CFR 50.54(w)(3) ML23341A2102024-01-22022 January 2024 LTR-23-0216-1 - Closure Letter - 2.206 Petition for License Renewal Plant Reactor Pressure Vessel Embrittlement ML23320A3062024-01-22022 January 2024 Issuance of Amendment Nos. 298 and 291 Regarding Revising the Fire Protection Program in Support of Reactor Coolant Pump Seal Replacement Project L-2024-007, Inservice Inspection Program Owner'S Activity Report (OAR-1)2024-01-18018 January 2024 Inservice Inspection Program Owner'S Activity Report (OAR-1) L-2023-173, Quality Assurance Topical Report (FPL-1) Revision 30 Update2023-12-15015 December 2023 Quality Assurance Topical Report (FPL-1) Revision 30 Update L-2023-166, Turkey Points Units 3 and 4, Correction to the 2022 Annual Radioactive Effluent Release Report2023-12-0606 December 2023 Turkey Points Units 3 and 4, Correction to the 2022 Annual Radioactive Effluent Release Report ML23340A0332023-12-0101 December 2023 FPL to Fws, Comments Submitted by Florida Power and Light on the Species Status Assessment Accompanying the September 20, 2023 Proposed Threatened Species Status with Section 4(d) Rule for the Miami Cave Crayfish L-2023-172, Supplement to Exemption Request Regarding Enhanced Weapons. Firearms Background Checks. and Security Event Notifications Final Rule2023-11-29029 November 2023 Supplement to Exemption Request Regarding Enhanced Weapons. Firearms Background Checks. and Security Event Notifications Final Rule L-2023-155, Supplement to Response to Request for Additional Information, Revised NextEra Common Emergency Plan, and Revised Site-Specific Emergency Plan Annexes Regarding License Amendment Request for Common Emergency Plan Consistent with NUREG-06542023-11-28028 November 2023 Supplement to Response to Request for Additional Information, Revised NextEra Common Emergency Plan, and Revised Site-Specific Emergency Plan Annexes Regarding License Amendment Request for Common Emergency Plan Consistent with NUREG-0654, ML23333A0152023-11-27027 November 2023 Attachment G - Arcadis Memo Re FPL Year 4 Raasr Final (June 2, 2023, Appended to Derm letter)-1 ML23333A0102023-11-27027 November 2023 Attachment B - 11/07/2022 - Waterkeeper Scoping Comments-1 L-2023-146, Part 73 Exemption Request Regarding Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Final Rule2023-11-16016 November 2023 Part 73 Exemption Request Regarding Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Final Rule L-2023-078, License Amendment Request 278, Incorporate Advanced Fuel Products, Extend Surveillance Intervals and 10 CFR 50.46 Exemption Request to Facilitate Transition to 24-Month Fuel Cycles2023-11-15015 November 2023 License Amendment Request 278, Incorporate Advanced Fuel Products, Extend Surveillance Intervals and 10 CFR 50.46 Exemption Request to Facilitate Transition to 24-Month Fuel Cycles IR 05000250/20230032023-11-0909 November 2023 Integrated Inspection Report 05000250/2023003 and 05000251/2023003 ML23310A1342023-11-0404 November 2023 10 CFR 2.206 Petition - LTR-23-0216-1 Petition Amendment; Turkey Point Subsequent Renewal with Petitioner 11/04/2023 ML24016A2622023-10-25025 October 2023 Subsequent License Renewal Updated List of Threatened and Endangered Species That May Occur in Your Proposed Project Location or May Be Affected Project L-2023-077, License Amendment Request 277 Updated Spent Fuel Pool Criticality Analysis2023-10-11011 October 2023 License Amendment Request 277 Updated Spent Fuel Pool Criticality Analysis ML23346A1322023-10-0606 October 2023 Communication from C-10 Research & Education Foundation Regarding NextEra Common Emergency Fleet Plan License Amendment Request and Related Documents Subsequently Published IR 05000250/20230102023-09-29029 September 2023 Biennial Problem Identification and Resolution Inspection Report 05000250/2023010 and 05000251/2023010 ML23234A1922023-09-27027 September 2023 Issuance of Amendment Nos. 297 and 290 Regarding Conversion to Improved Standard Technical Specifications ML23265A5492023-09-22022 September 2023 Transmittal of WCAP-18830-P/NP Turkey Point Fuel Storage Criticality Analysis for 24 Month Cycles to Support a License Amendment Request from FPL - License Amendment Request 277 Updated Spent Fuel Pool Criticality Analysis ML23243A9522023-09-0808 September 2023 Notice of Availability of the Draft Environmental Impact Statement for the Turkey Point Nuclear Generating Unit Numbers 3 and 4 Subsequent License Renewal Application ML23243A9542023-09-0808 September 2023 Notice of Availability of the Draft Environmental Impact Statement for the Turkey Point Nuclear Generating Unit Numbers 3 and 4 Subsequent License Renewal Application ML23243A9532023-09-0808 September 2023 Notice of Availability of the Draft Environmental Impact Statement for the Turkey Point Nuclear Generating Unit Numbers 3 and 4 Subsequent License Renewal Application ML23243A9552023-09-0808 September 2023 Notice of Availability of the Draft Environmental Impact Statement for the Turkey Point Nuclear Generating Unit Numbers 3 and 4 Subsequent License Renewal Application - Tribe- Section 106 Letters ML23199A2352023-09-0505 September 2023 Letter to EPA-Turkey Point Nuclear Generating Station, Units 3 and 4 - Notice of Availability of Draft Site-Specific Environmental Impact Statement for Subsequent License Renewal ML23199A2482023-09-0505 September 2023 Ltr to Florida Power and Light Co - Turkey Point Nuclear Generating Units 3 and 4 - Notice of Availability of Draft Site-Specific Environmental Impact Statement for Subsequent License Renewal L-2023-110, Response to Requests for Additional Information Regarding License Amendment Request No. 276, Revise Fire Protection Program in Support of Reactor Coolant Pump Seal Replacement Project2023-08-25025 August 2023 Response to Requests for Additional Information Regarding License Amendment Request No. 276, Revise Fire Protection Program in Support of Reactor Coolant Pump Seal Replacement Project IR 05000250/20230052023-08-21021 August 2023 Updated Inspection Plan for Turkey Point, Units 3 & 4 (Report 05000250/2023005 and 05000251/2023005) L-2023-115, Inservice Inspection Program Owner'S Activity Report (OAR-1)2023-08-21021 August 2023 Inservice Inspection Program Owner'S Activity Report (OAR-1) L-2023-114, Proposed Turkey Point Units 6 and 7; Seabrook Station; Point Beach Units 1 and 2 - Official Service List Update2023-08-17017 August 2023 Proposed Turkey Point Units 6 and 7; Seabrook Station; Point Beach Units 1 and 2 - Official Service List Update IR 05000250/20230022023-08-14014 August 2023 Integrated Inspection Report 05000250/2023002 and 05000251/2023002 L-2023-098, and Point Beach Units 1 and 2 - Response to Request for Additional Information Regarding License Amendment Request for Common Emergency Plan Consistent with NUREG-0654, Revision 22023-08-0707 August 2023 and Point Beach Units 1 and 2 - Response to Request for Additional Information Regarding License Amendment Request for Common Emergency Plan Consistent with NUREG-0654, Revision 2 ML23242A0922023-08-0606 August 2023 Request for Withholding Information from Public Disclosure for Turkey Point Nuclear Generating Unit Nos. 3 and 4 ML23201A0872023-08-0303 August 2023 Audit Plan in Support of Review of License Amendment ML23198A2702023-08-0303 August 2023 Issuance of the Site-Specific Environmental Impact Statement Scoping Process Summary Report Associated with the Turkey Point Nuclear Generating Unit Numbers 3 and 4, Subsequent License Renewal Application, Environmental Report Supplement 2 L-2023-094, Response to Requests for Additional Information Regarding License Amendment Request No. 276, Revise Fire Protection Program in Support of Reactor Coolant Pump Seal Replacement Project2023-07-27027 July 2023 Response to Requests for Additional Information Regarding License Amendment Request No. 276, Revise Fire Protection Program in Support of Reactor Coolant Pump Seal Replacement Project ML23178A1872023-07-25025 July 2023 Review of the Spring 2022 Steam Generator Tube Inspections During Refueling Outage No. 33 ML23188A1242023-07-20020 July 2023 Acknowledgment of Temporary Suspension Request for License Request for License Amendment Request Reactor Protection System, Engineered Safety Features System, and Nuclear Instrumentation System ML23200A0672023-07-18018 July 2023 Tp 2023 RQ Inspection Notification Letter ML23173A0812023-07-17017 July 2023 Supplement to Regulatory Audit Plan in Support of Review of License Amendment Request Supporting Digital Instrumentation & Control Modernization Project (EPID L-2022-LLA-0105) - Non-Proprietary L-2023-087, Florida Power & Light/Nextera Energy, Results of the Safety Culture Program Effectiveness Review, March 20, 2023 (ADAMS Accession No. ML22340A452)2023-06-29029 June 2023 Florida Power & Light/Nextera Energy, Results of the Safety Culture Program Effectiveness Review, March 20, 2023 (ADAMS Accession No. ML22340A452) 2024-02-05
[Table view] |
Text
ber 10, 2019
SUBJECT:
TURKEY POINT NUCLEAR GENERATING STATION - TRIENNIAL FIRE PROTECTION INSPECTION REPORT 05000250/2019012 AND 05000251/2019012
Dear Mr. Maul:
On November 8, 2019, the U.S. Nuclear Regulatory Commission (NRC) completed an inspection at Turkey Point. On November 7, 2019, the NRC inspectors discussed the results of this inspection with Mr. Brian Stamp and other members of your staff. The results of this inspection are documented in the enclosed report.
No findings or violations of more than minor significance were identified during this inspection.
This letter, its enclosure, and your response (if any) will be made available for public inspection and copying at http://www.nrc.gov/reading-rm/adams.html and at the NRC Public Document Room in accordance with Title 10 of the Code of Federal Regulations 2.390, Public Inspections, Exemptions, Requests for Withholding.
Sincerely,
/RA/
Scott M. Shaeffer, Chief Engineering Branch 2 Division of Reactor Safety Docket Nos. 05000250 and 05000251 License Nos. DPR-31 and DPR-41
Enclosure:
As stated
Inspection Report
Docket Numbers: 05000250 and 05000251 License Numbers: DPR-31 and DPR-41 Report Numbers: 05000250/2019012 and 05000251/2019012 Enterprise Identifier: I-2019-012-0011 Licensee: Florida Power & Light Company Facility: Turkey Point Location: Florida City, FL Inspection Dates: October 21, 2019 to November 08, 2019 Inspectors: J. Dymek, Reactor Inspector L. Jones, Senior Reactor Inspector W. Monk, Senior Reactor Inspector J. Montgomery, Senior Reactor Inspector D. Strickland, Reactor Inspector Approved By: Scott M. Shaeffer, Chief Engineering Branch 2 Division of Reactor Safety Enclosure
SUMMARY
The U.S. Nuclear Regulatory Commission (NRC) continued monitoring the licensees performance by conducting a triennial fire protection inspection at Turkey Point, in accordance with the Reactor Oversight Process. The Reactor Oversight Process is the NRCs program for overseeing the safe operation of commercial nuclear power reactors. Refer to https://www.nrc.gov/reactors/operating/oversight.html for more information.
List of Findings and Violations No findings or violations of more than minor significance were identified.
Additional Tracking Items None.
INSPECTION SCOPES
Inspections were conducted using the appropriate portions of the inspection procedures (IPs) in effect at the beginning of the inspection unless otherwise noted. Currently approved IPs with their attached revision histories are located on the public website at http://www.nrc.gov/reading-rm/doc-collections/insp-manual/inspection-procedure/index.html. Samples were declared complete when the IP requirements most appropriate to the inspection activity were met consistent with Inspection Manual Chapter (IMC) 2515, Light-Water Reactor Inspection Program - Operations Phase. The inspectors reviewed selected procedures and records, observed activities, and interviewed personnel to assess licensee performance and compliance with Commission rules and regulations, license conditions, site procedures, and standards.
REACTOR SAFETY
===71111.05XT - Fire Protection - NFPA 805 Fire Protection Inspection Requirements (IP Section 02.01a) (3 Samples 1 Partial)
- (1) FA S/FZ 62 - Units 3 & 4 Computer Room
- (2) FA W/FZ 70 - Unit 3 4160V Switchgear Room 3B
- (3) FA OD-84/FZ 84 - Unit 3 & 4 Aux Feedwater Pump Area (4) (Partial)
FA HH/FZ 98 - Units 3 & 4 Cable Spreading Room (specific sample focused on the Very Early Warning Fire Detection System)
B.5.b Inspection Activities (IP Section 02.03) ===
Main article: IP 71111.05
- (1) Containment Flooding with Portable Pump
INSPECTION RESULTS
No findings were identified.
EXIT MEETINGS AND DEBRIEFS
The inspectors verified no proprietary information was retained or documented in this report.
- On November 7, 2019, the inspectors presented the triennial fire protection inspection results to Mr. Brian Stamp and other members of the licensee staff.
DOCUMENTS REVIEWED
Inspection Type Designation Description or Title Revision or
Procedure Date
71111.05XT Calculations 5610-016-DB-001 Fire Protection System NFPA 805 Design Basis Rev. 2
5610-E-855 Breaker List 323
5610-M-722A Nuclear Safety Capability Fire Shutdown Analysis Basis Rev. 10
Document
5610-M-722B Nuclear Safety Capability Fire Safe Shutdown Analysis Rev. 8
(NSCA)
5610-M-722C Non-Power Operations (NPO) Review Rev. 3
5613-E-320 Vital DC Bus 3D23 & 3D23A Load List 59
5613-E-672 Inverter 3Y02 Load List 26
5613-E-673 Inverter 3Y05 Load List 29
PTN-BFJM-017 Standby Steam Generator Feedwater Pump Fuel Tank 12/13/1994
Capacity
PTN-BFJM-91- Turkey Point Control Building & Annex Heat up Calculation 4
035 for Appendix R Fire Scenarios
PTN-BFJR-16- Turkey Point Nuclear Plant FPRA Summary Report Rev. 2
057
Corrective Action AR 01674334 INPO IER L1 11-4 Actions For Loss of AC Power 8/2/2011
Documents AR 01993249 IN 2014-10 OE Rev. 3
AR 02161919 Fire Protection Surveillance Not Completed 10/12/2016
AR 02162260 Pre Fire Plan for FZ 84, AFW Pump Area Do Not Show the 10/13/2016
HALON Bottles
AR 02167413 Fire Door 58-1 Replaced with Improper Door 11/3/2016
AR 02171838 Fire Door 134-1 Not Latching On Its Own 11/30/2016
AR 02172599 Diesel Driven Fire Pump Batteries Expired 12/5/2016
AR 02192363 Transient Combustibles Located in Medium Risk Zone W/O 3/20/2017
Permit
AR 02194142 Document Inspection of Fire Door 71-1 3/27/2017
AR 02208584 Fire Door 27-1 Found Not Latching On Its Own During 6/4/2017
Rounds
AR 02208611 Transient Combustibles W/O TCP FZ 28 - Aux BLDG Fan 6/5/2017
Room
AR 02222361 NRC IN 2017-04 High Energy Arcing Fault in Elec Eqmt w/ 10/12/2017
Inspection Type Designation Description or Title Revision or
Procedure Date
AL
AR 02261216 Report of a Fire at the U3 Gen. H2 Panel on Purity Blower 4/28/2018
AR 02298760 Fire Door 58-2 Not Latching On Its Own 1/22/2019
AR 02298772 Fire Door 30-2 Not Latching 1/22/2019
AR 02312459 Electric Driven Fire Pump Casing Leak 4/27/2019
AR 02319501 Diesel Driven Fire Pump Batteries Leak 6/28/2019
AR 02319945 "A" Jockey Pump Not Maintaining Fire Header Pressure 7/2/2019
AR 02325099 Fire Door 12-1 Does Not Close Unassisted 8/20/2019
AR 02330882 Wiring Changes Required in ALT Shutdown Panel for 4B 10/14/2019
Charging Pump
Corrective Action AR 02332899 0-SME-104.01 - Self Contained, Battery Powered, 10/24/2019
Documents Emergency Lighting Procedural Change
Resulting from AR 02333396 2019 TFPI NRC Insp. Identified. Cigarette Butts Found in 10/29/2019
Inspection Power Block
AR 02334147 2019 TFPI Discovery - Issue With PreFire Plan for FZ 84 11/4/2019
AR 02334404 4th Quarter 2019 Fire Drill Failure 11/6/2019
AR 02334634 FP-AA-104-1006 Implementation of the NFPA 805 Monitoring 11/7/2019
Program - 2019 TFPI Identified Change
Drawings 560-M-354 HVAC DC Enclosure Building Units 3 & 4 Rev. 4
5610-A-56
- D.C. Enclosure Building, Floor & Elevation Details, Revision 4
5610-A-56, sheet Architectural-
- D.C. Enclosure Building, Miscellaneous Details Revision No.
no. 2 4
5610-E-1 Main Single Line Unit 3 47
5610-E-27-005 Fire Pump Controller Breaker 30305 Revision No.
5610-E-27-3Y1 Mechanical Auxiliaries, Fire Pump Motor P39, Revision No. 1 Revision No.
5610-E-640 Lighting, Communication Grounding, Raceway & Fire Rev. 19
Protection Plan - DC Enclosure Units 3 & 4
5610-T-E-1591 Operating Diagram Electrical Distribution Rev. 82
5613-E-10 Motor Control Center 3B43 Rev. 19
5613-E-11 Electrical 125V DC & 120V Instrument AC 20
Inspection Type Designation Description or Title Revision or
Procedure Date
5613-E-12 125V DC and 120V Instrument AC 12
5613-E-3 4KV Switchgear 3AC Bus 3C Rev. 5
5613-E-5 480 Volt System Load Controllers 3A, 3B, 3C, 3D & 3H Revision No.
5613-M-3041 Reactor Coolant System 44
5613-M-993 4160V Unit 3 A/B Switchgear Rooms Air Sampling Detection Rev. 0
Engineering EC 242511 PTN-3 MODIFICATIONS TO HDP AND CWP 4KV Rev. 12
Changes BREAKERS FROM FP NFPA 805 PROJECT
EC 281443 VESDA Modification Acceptance Test Plan Rev. 1
Engineering PTN-ENG-SENJ- Resolution of Interim Compensatory Measure B.5.b; Phase 3 2
Evaluations07-001
PTN-FPER-07- Code Compliance Evaluation-NFPA 13, Installation of Revision No.
013 Sprinklers 0
PTN-FPER-07- Code Compliance Evaluation-NFPA-72E, Automatic Fire Revision No.
2E Detectors 0
PTN-FPER-08- Engineering Evaluation Report, Adequate for Hazard EEE Revision No.
006 0
PTN-FPER-11- NFPA 805 Recovery Action Feasibility Evaluation Rev. 1
2
PTN-FPER-11- NFPA 805 Fire Area Transition Review Rev. 5
006
PTN-FPER-11-08 Engineering Evaluation Report, Suppression and Detection in Revision No.
Outdoor Areas 0
Miscellaneous Control Room Report-Fire Protection Impairments 10/21/2019
Control Room Report-Hourly Rove Route Checklist 10/21/2019
033006-RPT-003 PTN BASIS FOR NFPA 805 MONITORING DATABASE Rev. 3
Fire Drill AFW Pump Cage Area 09/14/2011
Evaluation
Fire Drill AFW Pump Cage Area 11/08/2011
Evaluation
Fire Drill Non-vital Battery Room Area (NEIL Observed) 11/09/2015
Evaluation
Fire drill Unit 3 De-superheater Area 10/12/2016
Inspection Type Designation Description or Title Revision or
Procedure Date
Evaluation
MEETING NFPA 805 Monitoring Program Expert Panel (MPEP) Meeting 1/30/2019
MINUTES
MEETING NFPA 805 Monitoring Program Expert Panel (MPEP) Meeting 5/13/2019
MINUTES
System 104 Plant Lighting 10/21/2019
Health Report
TPN UFSAR Chapter 9, Section 9.6.1, Fire Protection Program 9/20/2016
v000895 Vendor Manual, Portable Diesel Fire Pump 04/15/2010
Procedures 0-ADM-016 Fire Protection Program Rev. 31
0-ADM-016.10 IMPLEMENTATION OF THE NFPA 805 MONITORING 2
PROGRAM
0-ADM-016.2 Fire Brigade Program 11
0-ADM-051 Outage Risk Assessment and Control 04/17/2019
0-EPIP-20112 Communications Network 11/10/2008
0-NOP-074.01 STANDBY STEAM GENERATOR FEEDWATER SYSTEM 10
0-ONOP-016.20 PRE-FIRE PLANS Rev. 0
0-ONOP-016.8 Response to a Fire/Smoke Detection System Alarm 21
0-ONOP-025.3 DC Equipment and Inverter Rooms Supplemental Cooling 3C
0-ONOP0-16.10 Safe Shutdown Manual Actions 40
0-OSP-016.34 Portable Diesel Fire Pump Operability Test and Extensive 15
Damage Mitigation Equipment Surveillance
0-SFP-016.5 Fire Protection Equipment Surveillance 7/15/2019
0-SME-104.01 Self Contained, Battery Powered, Emergency Lights Rev. 11
Quarterly Performance Test
3-ONOP-075 Off Normal Operating Procedure 13
FP-AA-104-1006 Implementation of the NFPA 805 Monitoring Program Rev. 1
OP-AA-100-1000 Conduct of Operations Rev. 29
PI-AA-102 OPERATING EXPERIENCE PROGRAM Rev. 17
PI-AA-102-1001 OPERATING EXPERIENCE PROGRAM SCREENING AND Rev. 22
RESPONDING TO INCOMING OPERATING EXPERIENCE
RM-AA-101-1000 Processing Controlled Documents 7
SAM-SAG-2, Containment Flooding With Portable Pump 0
Inspection Type Designation Description or Title Revision or
Procedure Date
Work Orders 40526574 B.5.b S-PDFP: Battery Electrical Inspection (6M) 06/15/2018
40624145-01 Portable Diesel Fire Pump OP Test 07/22/2019
40642647-01 Portable Diesel Fire Pump OP Test 10/16/2019
CTP20-2018-672 Install New Battery in B5B Pump 11/19/2019
WO 40487647 Unit 3 DEDICATED ALT SHUTDOWN COMM SYS 1/22/2018
OPERABILITY TEST
WO 40537078 D058-1 Replace Door 7/1/2017
WO 40567647 Emergency Lights Group 4: Inspect/Test 3/12/2019
WO 40589620 Unit 4 DEDICATED ALT SHUTDOWN COMM SYS 8/23/2019
OPERABILITY TEST
WO 40606209 Emerg Light Group 9 INST/TEST (Portable & Fire Lockers 4/26/2019
Lantern)
WO 40614115 Emergency Lights Group 5: Inspect/Test 6/10/2019
WO 40614136 Electric Fire Pump Quarterly Inspection 5/31/2019
WO 40625295 Emerg Light Group 9 INST/TEST (Portable & Fire Lockers 8/5/2019
Lantern)
WO 40635737 Emergency Lights Group 6: Inspect/Test 9/23/2019
WO 40636797 Emergency Lights Group 5: Inspect/Test 9/25/2019
WO 94150355 FD 132-2 Not Latching On Its Own 11/1/2016
WO 94151665 FD 134-1 Not Latching On Its Own 11/30/2016
WO 94161484 FD 27-1 Found Not Latching On Its Own During Rounds 6/4/2017
WO 94188869 D082-2 Fire Door Does Not Close Unassisted 1/22/2019
8