ML19323B466
ML19323B466 | |
Person / Time | |
---|---|
Site: | Brunswick |
Issue date: | 05/06/1980 |
From: | CAROLINA POWER & LIGHT CO. |
To: | |
Shared Package | |
ML19323B464 | List: |
References | |
NUDOCS 8005120406 | |
Download: ML19323B466 (15) | |
Text
--
v 8005IJRp Yo lo I
APPE!! DIX 5 AVERAGE DAILY P0vr' LEVEL DCCKET 'IO. 050-0324 UtlIT E RU'iS WIOK U'!I T 2 DATE 05/01/d1 CO.'.!PLETED 3Y EULIS ?ILLIS TELEPH0!!E 9 Iv-457-9521 APRIL do DAY AV3. DAIL/ POWE0 LEVEL DAY AVG. D A ILY ?CER '.E /EL
( UWE-!!ET) (.UE '!ET) 1 0. 17 0.
2 0. 18 0.
3 0. 19 0.
4 0. 29 0.
5 0. 21 0.
6 0. 22 0.
7 0. 23 0.
8 0. 24 0.
9 0. 25 O.
10 C. 26 0.
ll 0. 27 0.
12 0. 2a 0.
13 0. 29 0.
14 0. 30 0.
15 O.
10 0.
1.15 - J
OPERATING DATA REPORT DOCKET NO. 050-0324 DATC 05/01/89
- . COMPLETED RY EULIS WILLIS l
TELEPHONE 919-457-9521 OPERATING STATUS
- 1. UtlIT NoiE: BRUNSWICK UNIT 2 I NOTES I
- 2. REPORTING PERIn0: APRIL 00 I I
- 6. l4AX DEPEdDA6LE CAPACIfY (GROSS t.tvE): o!5.9 I I
- 7. MAX DEPE::DABLE CA?ACITY (NET enE): 790.0 - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - -
- d. IF CHAD 3ES JCCUR I:1 CAPACITY RATI:GS (ITEMS 3 THRU 7) SINCE LA5T REPORT, GIVE REASO:!S
- 9. PO^ER LEVEL TO WHICH REST 3I^TED IP A':Y . rit:1 ?.mb ) : Nuri$:
- 10. JEASONS FOR RESTRICTIO:I IF ANY:
THIS YR TO CU1UL ,
MONTH OtTE ATIVE II. HOURS IV REPORTING PERIOD 719.0 2903.0 39384.0
- 12. NU."9ER OF HCURS REACTOR .TAS CRITICAL 0.0 136d . 7 26639.7
- 13. REACTOR RESERVE SHUTDJ'11 HOURS 0.0 3.0 0.0 14 HJURS GEdERATJD 0.4 LINE 0.0 1220.1 25102.2
- 15. UNIi RESERVE SHUTDOWN HJUR5 0.0 2.0 0.0
- 17. GROSS ELECTR ICAL 3:fER3Y GE lER ATED (*.i?9) 0.0 372513.0 15437537.0 id. :lET ELECTRICI AL E'!ERGY 3E5iER ATEJ ( .T*H) 0.0 842125.0 14832593.0 i
- 19. UNIT SERVICE FACTJR 0.0 42.3 53.7
- 20. Ulli AVAILAD'LITY FACTOR . 0.0 42.3 63.7
- 22. UilIl CAPACIi/ FACrJR (USIN3 DER '!iT) 0.0 35 .3 45.0
- 23. U'!I f FORCEU OUTAGE RAfE O.7 s.1 12.7 24 SHUTD0'?!.15 SCHEDULED OVER tiEXT $ 'A nifHS ( r(PE, DATE. AMD DUR ATIO
- I 0F EACH):
- 25. IF SHUTDJ 'N Ai E!!D JF REPORT PERIJD, ESTIMATED DATE 0.: STACT U?: 5 /22 /6 0
- 26. UNIiS I.i TEST STAiUS (PRIOR TO CD 'l.'ERICI AL GPERATIC'!): FORCAST ACHEIVED I:lliI AL CRITICALITY - - - - - - - - - - - - - - - -
INIilAL ELECfRICITY -------- --------
Cat.i!4ERICI AL CPERATICN -------- - - - - - - - - -
1.16 - 9 1
D**]D w
]D 2 e A\ c Ju. 1 e
)
i
- - . . _ ,..n_ . - . _ - -~ -.
, . 5 F
' ~
AP:?ENDIX 4
DOCKET NO: 050-0324 -
UNIT: Brunswick No. 2 -
DATE: May 1980 COMPLETED BY: Eulis A. Willis .
OPERATIONS
SUMMARY
+ Brunswick No. 2 i
i Brunswick Unit No. 2 was shutdown for the entire month of April for refueling.
The unit is expected back on line May 22, 1980. A more detailed description of the refueling outage will be provided in the Monthly Operating Report for
! the month the unit returns to service.
1 1
J
~
l i
i
l i
l APPENDIX B AVERAGE DAILY POVER LEVEL
- DOCKET NO. 050-0325 UNIT SRUliSWICK U
- !IT I DATE 05/01/01
< COMPLETED BY EULIS WILLI 5 i AELEPHO'IE Viv-457-9521 APRIL c0 DAY AVG. DAILY POWED LEVEL DAY AVG. DAILY P7MER LEVEL (MWE-NET) (M P:E ':ET) l l 0. 17 81.
2 0. 18 359.
3 . 94 19 471.
4 121. 27 694.
5 O. 21 686.
6 22o. 22 598.
7 494 23 425.
. 8 118. 24 663.
9 0, 25 714 t
10 0. 26 606.
!I O. 27 21.
- 12 0. 2d 605.
i 13 215. -29 652.
14 501. 30 607.
i 15 232.
16 0.
1 1.15 - 8 i
l
l l
l 4
OPERATING DATA REPORT )
DOCKET NO. 350-0125 DATE 05/0;/ W COVPLETED RY EULIS >!I;.LIS TELEPHQ*IE 919-457-9521 OPERATING STATUS
- 1. U!!IT NAME: SRUISMICK UNIT I I t!OTES I
- 2. REPORTI'!G PERICD: A?RIL 00 I I
- 3. LICENSED THER'!AL PCeER ('JWT): 2436 I I
- 4. NA.'iEPLATE RATIfiG G F9 MME): c67.0 I I
- 6. MAX DEPE?!DABLE CA? AUiTY (GROSS W!i): c15.0 I I
- 7. MAX DEPi NA9LE CAPACITY ( ?!ET CE ) : 793.0 - - - - - - - - - - - - - - - - - - - - - - - - - - - -
- d. IF CHAifGES GCCUR I?! CAPACITY RATI'IGS (I fEMS 3 THPU 7 ) SINCE LAS E REPORT, GIVE REASCI15:
t 9 POWER LEVEL TO ;fHICH RESTPICTED IF ANY ( 'IET !PTE ) : !!O"E
'n. REASGNS FCR RESTRICTION IF A!!Y:
THIS YR TO CUMUL VO:ITH D *.TE ATIVE II. riOURS IN REPORTING PERIOD 719.0 2903.0 27350.0
- 12. NUuSER OF HJURS REACTOR VAS CRITICAL 516.9 2655.I 20044.7
- 13. REACTOR RESERVE SHUiDC!'l HOURS 0.0 J.0 1647.1
- 14. iOURS GENERATOR Oil LIliE 443.2 2533.0 18865.9
- 15. UNIf RESERVE SHUTDO'I'! HOURS 0.0 0.0 0.0
- 16. GROSS THERMAL ENERGY GE'IERATED (.-bH) 669') A5 . 4 5292731.9 39122223.9
- 17. GROSS ELECTRICAL ENERJY GE?IERATED (lDM) 2305E0.0 1771230.0 1301n049.0 Id. NET ELECTRICI AL ENERGY GE'IER ATED (.MH) 215417.0 1707732.0 12515542.0
- 19. UNIT SERVICE FACTOR 61.6 67.3 69.0
- 20. U:llT AVAILA3!LITY FACTOR 6I.6 37 .3 69.0
- 22. UNIf CAPACITY FACT 3R (USI:!G DER nit) 37.0 71.7 55.7
- 23. U' LIT FORCED OUTAGE RATE 38.4 12.7 20.4 24 SHUTDO.i:IS SCHEDULED OVER tiEXT 5 M]NTHS (TYPE, DATE. AND DUR ATIO I OF E ACH):
Refueling 800508 1920 hours0.0222 days <br />0.533 hours <br />0.00317 weeks <br />7.3056e-4 months <br />
- 25. IF SHUT 00Mi Af END JF REPORT PERI 1D, ESTIMATED DATE OF START UP: O/ 9/ 0
- 26. U'!IiS IN TEST STAfUS (PRIOR TJ COiMERICIAL OPERATIC'!): FORCAST ACHEIVED INITIAL CRITICALIfY - - - - - - - -------_
INITIAL ELECTRICITY -------- - - - - - - -
CO.4MERICIAL OPERATION - - - - - - --- --
1.16 - 9 D**]D comomSN'o*]D L ._
s DOCKET NO. nsn nvs UNITSHUTDOWNS AND POWER REDUCTIONS 11rnnwi ck Mn. 1 UNIT NAME DATE May 1980 COMPLETED BY Foi t <: A_ Uqt;e, REPORT MONTil Anril 1990 TELEPilONE (919) 457-95M '
i "s -
c s- ei i u. 3 Licensee E ., bn Cause & rorreciive g 5C E p E '4 8. .g No. p.n c y.! .g s 5 Even E@ Atinen in l- p $
a: : Reporisr 40 9d Preveni Recurrence c :::: a d :!
d O 6
009 800331 F 50.8 !! 3 N/A EC Transf Reactor scram on low water level due to an apparent loss of "1D" bus. The "lD" bus feeder breaker from the start up auxiliary transformer was removed from the cabinet for preventative maintenance. The "lD" bus feeder breaker from the unit auxiliary trans-former tripped, causing a total loss of the ID bus. The bus loss caused a loss of several major components in the primary systems and the steam systems, causing a reactor scram due to low reactor vessel water levei The cause of the trip to the unit auxiliary transformer feeder breaker has not been determined. The breaker was inspected and checked out satis-factorily. This trip is being con-n 1,io rn,1 n .: n n e i n n u i n e 1,ir n r (cnn t ',iL ,
1 2 3 4 f: Forced Reason: Method: Exhibii G - Insitutisons S: Scheduled A fquipment F.nlure(Explain) l Manual for pseparation of Data ll-Maintenance oi Test 2 Manual Scram. Entr> Sheels for I.icemec C. Refueling 3 Automatic Scram. Event Report ILERIl'de INURLG-D Regulatory Resirietion 4 Other (Explain) 0161)
E-Operator Training & License Examination
~
F-Admunsivative 5 G Operational I rear (Explain) Esinbis 1 - Same Source 19/77) Il Olher (Explain t i
e
.-3 DOCKET NO. 050-O'125 UNIT Sil01 DOWNS AND POWER REDUC 110NS UNIT N AME Brunsuick No. 1 DATE May 1980 COMPLETED ilY I'n l i s ^_ Uillis REPORT MONTil April 1980 (9191 457-os?1 TELEPilONE I
, , .$'E 3 $ Licensee $ r, ,, Cause & Corrective No. DJte g k ,3 y y [ vent E] n. $ ALHun to l
$5 5 ReporI # nU u !O Prevent Recurrence 5 < 5 =t t
6 and is not expected to liappen again. 009 (C ant'd) The outage duration was extended
- because of the detailed investigation ,
l involved in determining a cause. , s.
..~.. ..
ll '. I 2 3 4 F: Fosced Reason: Method: Exhibit G -Instructions S: Scheduled A 1:yuipment Failure (Explain) 1 Manual for Preparation of Data D. Maintenance of Test 2-Manual Scram. Entey Sheets for Licensee C.Itefueling 3 Autunutic Scram. Event Report ILER) Fde INURLG. D.Itegulatory Resiris. tion 4-Other (Explain) 0161) E-Operator Training & License Examination F. Athninist rative 5 G Operational lirror (Explain) Exlubit 1 - Same Source las/77) 11 Ot her (lixpl.iin)
l DOCKET NO. 050-0325 l UNIT SilU1 DOWNS AND POWER REDUCTIONS ! UNIT NAM E Ilrunswick No. 1 DATE Flay 1980 COMPLETED BY Enlis A. Willis REPORT MONTil Aprf1 1980 TELEPilONE (914) 457-9521 e r. _ E c
-, .$g 3 $ h* 5 Litensee p, ja. Cause & C.nrective i
N. . Date i 5g j js5 Event g mO pO Action to 4 Repori # Present Recurrence t-fE e~o ;y, :g: o o o e 010 800403 F 42.0 B 1 N/A SF Turbin Power limited to approximately 25% of full power because of problems with the llPCI automat.ic start test and
. a steam leak on llPCI steam trap bypass valve.
The hydraulics for the llPCI turbine
- stop valve were adjusted for proper timing, thus correcting the auto-matic start test problem. The steam
, leaks on the steam trap bypass valve were repaired allowing the unit to return to full power.
I 2 3 . 4 F: Forced Reason: Method: Exlubit G Instructions S: Scheduled A Equipment Failure (Explain) 1 -Manual for Pseparation of Data
. II. Maintenance of Test 2 Manual Scram. Entry Sheets for Licensee C Refueling 3 Automatic Scram. Event Repost ILERI Fde (NURI G-D Regulatory Restriction 4-Other (Explain) 0161)
E-Operator Training & IJcense Examination F Administrative $ G Operational Le or (Explain) Exhibii 1 - Same Source es/77) ll Other (Explain)
050-0325 - I T UNIT SilUTDOWNS AND POWER REDUCTIONS A E Brunswick No. 1 tiay 1980 DATE COMPLETED BY Eulis A. 11fIlis REPORT MONTil April 1980 (919) 457-9521 TELEPil0NE "L - Cause & Conective
-, 3g 3 $ Licensee [ r,, ,
Action to No. Date Q ~g 5 js5 Event 3, y pO 5 mO Prevens Recurrence F
$E 3 ;f3 :$
e Repost # v o Q ILI Valvex Reactor scrammed after a turbine trip. 011 800405 F 30.2 B 3 N/A The turbine tripped because of high
- vibration. A control valve periodic -
test was in progress. The outage was extended approximately 16 hours due to " indicated" leakage inside the dry-well exceeding the amount of leakage allowed by Technical Specifications. The " indication" was determined to be a spurious - elec':rical signal
- instead of actual Icakage. The periodic test was revised to bypass a high vibration trip when the control valve periodic test is run. By re-placing a flow transmitter which had a faulty bellows assembly, the "indi- ' cated" high drywell leakage problem - was resolved and the unit returned to service. ,
3 4 1 2 Method: Exlubit G -Instructions F: Forced Reason: for Pseparaimn uI Data S: Ss heduled A liguipment failure (Explain) 1 Manual H. Maintenance of Test 2-Manual Scram. Entr> Sheets for Licensee 3 Automatic Scram. I.ent Repon 11 ERIl' ele INURI G-C.Refochng D. Regulatory Restriction 4 Other (Explain) 0161: I?opeiaior Tsaining& License Examination 5 F Atinunistrative G-Operational Enor (Explain) Eshibit I Same Source l*l/77 ) Il-Othes (Explain)
~.
0 t DOCKET NO. 050-0325 - UNIT SilUIDOWNS AND POWER REDUCTIONS UNIT NAME Brunswick No. 1 DATE !!d Y 1980 COMPLETED BY Eulis A. Uf111s
' REPOR T MONTil Anri1 1980 TELEPii0NE (919) 457-9521 m .. E E - jg 3 y $5 Licensee [ r,, {wl, Cause & Corecctive No. Date h 15 g @ js$ Event gg g3o Action to H gE e j;g iteport a mO g Pievent Recursence c5 Eleco a Reactor scram from a turbine trip.
012 800408 F 124.6 B 3 N/A EC The turbine trip occurred immediately
- following a " Quick Start" periodic test on #2 Diesel Generator. An ex-tene.ive investigation revealed the problem to be an electrical ground on #2 Diesel Generator in conjunction with the low electrical ground on the distribution system, causing a spike on the D.C. bus which energized a .
relay in the turbine safety system and
- tripped the turbine. (1) The grounds Identified during the investigation -
scere cleared. (2) Test were performed to assiire starting of Diesel Generator
#2 would not cause transients on the D.C. bus. (3) Turbine trip circuits were checked for proper operation.
(4) Visual inspections of the (Cont'd ) I 2 3 4 F: Forced Reason: Mediod: Exhibit G Inst uce ns 5: Scheduled A l'quipment Failure (Explain) 1 -Manual for P ceasauon f I!aia B-Maintenance of Test 2 Manual Scram. Ento St cess for Licensee C Itclocling 3 Automatic Scram. Event Iteport (LER) l'ile (NURI G-D llegulatory itestriction 4-Other ( Explain) 0161) 1 -Operator Training & Uanse Examination F-Adnunistrative 5 G Operational l.ison (Explain) Exhibit 1 Same Sousee p8/77) li-Othes (Esplain)
4 DOCKET NO. MO-01? S UNITS!!UTDOWNS AND POWER REDUCTIONS UNIT N AME krnneu t ri- *'n 1 DATE Flav 1990 COMPLETEI) BY Eulis A. Utills REPORT MONTil April 1980 TELEPilONE M10 As7-os?1
., jg 3 E Licensec ,E r, , Cause & Corrective No. Date g 3g s j5$ Event 3y gO3 Atenen to H y 5 ji 53 =S e.
Repori # mO o v Prevent Recurrence 6 012 (<:ont'd, relays and cabinets of the turbine trip circuits were made and revealed no anomalies. The unit was returned to service. I 2 3 4 F: Forced Reason: Method: Exhibit G-Instructineis S. Scheduled A.Iquipment Failure (Explain) 1. Manual for Preparation of Dara li-Maintenance of Test 2. Manual Scram. Entry Sheets for Licensee C. Refueling 3 Automatic Scram. Event Report ILERI File int >RI G. l 4-Other (Explain) 0161) D Regulatory Restriction
- 1. Oper.itor Trainmg & License Examination F. Ailnunist rative 5
. G Operanonal Earor (Explain) Esinbit I - Same Source 4 19/77) ll-Olher (E xplain)
^ ^
l DOCKETNO. 050-0325 UNIT SilUTDOWNS AND POWER REDUCTIONS UNI f NA\tE Brunswick No. 1
- D t1 E May 1980 COMPLE1ED BY fulis A. Uillis REPORT MONT!! Anrfl 1980 TELEP!!ONE (019) 457-4s21 e.
-_ E E , .! ? 3y $ E' E Liecusec [-r, jL Cause & Curressive +
No. Date g 3g ,j y y Event gg pg Assion to 80 O
$E 5 55=g e
Report a 5 u Prevent Resurrence C Elecon Reactor scram from a turbine trip. The 013 800415 F 50.5 B 3 N/A EC turbine tripped when starting #2 Diesel Generator. The problem was a replica of an earlier outage (see Outage No. 80-01-1) when an electrical ground on
#2 Diesel Generator caused a turbine
- trip. The ground fault was cleared and the unit was returned to service. A program was instituted to closely
- monitor D.C. bus grounds. A modifica-tion was made to the turbine protective - relay system to prevent. spikes from causing trips. Improved relays are being designed which will be installed in the turbine protective relay circuit:
during the forthcoming refueling outage 1 2 3 4 F: Forced Reason: Method: Exh: bit C Instrussions S: Sehedu!ed A l .pnpment Faiture (Explain) 14f anual for Preparation of Data
- 11. 4 ut. ten:.nce of Test .
24tanual Serarn. Entr> 5!iee:5 for Licen>ce C.R::ec!mg 3-Automatic Serain. Eveni Repuri (LERI Fi!c (NURLG-D Regutato:y Remitienion f0ther (Explain) 0161) E 0;.cn:ror T:ainm 1 L: cense Exainin tion F-AJ:cuusir :ive 5 G Operational 1:gror (Exp!ain) Eshibit I Same Sousee ps!?7) !!-0;her (E splam)
e . ^ DOCKET NO. nsn-n17s , UNIT SIIUTDOWNS AND POWER REDUCTIONS UNI r NAM E Brunswick No. _1 ' D g1E *by 1(Hn COMPLETED BY Fulfr A- Utilis REPORT MONTl! Anril 1980 TELEP!IONE (9141 457-45?1 I e. E c g jg 3 $ Y 5' Licensee Eg D, Cause 1 Corrective + No. Date i 3 ij d js$ Event gy gO3 Assionto 6-fE $ 35g a t Report # mO uo Prevent Recurrence 6 014 800422 F 35 A 1 N/A IIC llTEXCil Reduced power to perform condenser waterbox work. . IA south and IB north conder ser water-boxes were chected for leaks using the helium Icak detection method. Leaks . were identified and repaired in lA south. No leaks were found in 111 north 1 I 2 3 4 i F: Forced Reason: Methud: Ex!nbit G. Instsuctions S: Scheduled A 1:iiuipment Failure (Explain) I-Manual for Preparation of Dasa lisiintenance of Test . 2 Manual Seram. Entr> Sheets for Licensee C R:fuc!m;; 3 Automatic Scram. Esent Report tLERI Fde (NURLG-D-Regul.ito:y Resttietion 4 Other (Explain) 01611 E Operator T:ammel License Examinariam a F Admumtrative 5 1 G Operational Error (Explain) Eshtbii ! Same Source Pa!77) Il-Other (Explam)
DOCK ET NO. 050-0325 ,- UNIT StIUTDOWNS AND POWER REDUCTIONS Ilrunswick No. 1 UNIf NAME ' DATE Pfav 1980 COMPLETED tiY . Eulis A. Wi11is REPORT MONTl! Anri1 l ')R0 TELEP!!ONE (919) 457-9321 l l
~. . = -
C. eB .3 traO . ,. 6 'l,
;, 2e = , s _; Licemcc = -r, c' Cause 1 Conective .
Na- Date i, ~@ i .E s E Event ;7 E-3 Asi,on sa H dE U <~ Ig =f Report # iE C $U u Psegen Rc6urrence O 015 800'.26 F 19.7 A 1 N/A SA Valvex Unit separated from the grid because
. of excessive drywell leakage. An investigation revealed a packing leak on the recirculation line sample valve.
The packing was replaced and adjust-ments'to the valve were made. 1 I 2 3 4
- F: For ed Reamn: Method: Exlubis G. Insieuetions S: Scheduled A l'iguipment Failure (Explain) I-Manual for Preparation of Data ll M.iir.:enance or Test , 2 Manual Scram. I:rit) Stices, for t.ieen>ce C Refue!ing 3 Automatie Scram. Esent Repose (LER) Fa!c (NURLC-D Regularory Restriction 4 O:hcr (Explain) 0161)
- E Operator Training 1 License Examination F Administrative 5 i G Operational Error (Explain) -
Estubii I Same Source , Pl!77) !!-Other (Explain) S i'
.s .
j APPENDIX i DOCKET NO: 050-0325 UNIT: Brunswick No. 1 DATE: May 1980 COMPLETED BY: Eulis A. Willis i 1 -' OPERATIONS
SUMMARY
l Brunswick No. 1 l Brunswick Unit No.1 operated at a 38.5% capacity factor for the month of ! April. The following power changes and shutdowns occurred during the month: March 31: A trip of the unit auxiliary transformer feeder breaker caused a reactor scram. April 3: Power limited because of probicms with the HPCI automatic start test. April 5: High vibration during a control valve periodic test caused a turbine trip and a reactor scram. April 8: Problems with electrical grounds on #2 diesel generator caused a turbine trip and reactor scram. J I j April 15: A replica of the April 8th outage. Problems with the grounds on
#2 diesel generator.
April 22: Power reduced to perform condenser waterbox work. April 26: Excessive drywell leakage caused a unit separation to repack a valve. Total "down time" was 275.8 hours resulting in a 61.6% Availability Factor. For aore detailed information on individual outages, see the Unit Shutdowns and i Power Reductions Log (Appendix D) for this month. i l
- - -. - - - . - - - - , _ . - - . . -- _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ __ __, _ __}}