ML19354D943

From kanterella
Revision as of 00:46, 18 February 2020 by StriderTol (talk | contribs) (StriderTol Bot change)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
LER 89-025-00:on 891220,determined That Reactor Bldg Overhead Auxiliary Hook May Have Contacted Side of New Fuel Bundle on 891214,causing Extensive Damage.Caused by Personnel Error.Bundle Shipped Back to GE.W/900115 Ltr
ML19354D943
Person / Time
Site: Quad Cities Constellation icon.png
Issue date: 01/15/1990
From: Bax R, Lechmaier J
COMMONWEALTH EDISON CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
LER-89-025-02, LER-89-25-2, RLB-90-005, RLB-90-5, NUDOCS 9001250045
Download: ML19354D943 (6)


Text

p-00nunonweehh Edison owed Cates Nuclear Power Staten

  • 22710 206 Awonue North -
  • I . .

.~

Corocws, tilinos 61242 9740

,. Telephone 309454 2241 RLB-90-005 January 15, 1990 U. S. Nuclear Regulatory Commission Document Control Desk Hashington, DC 20555

Reference:

Quad Cities Nuclear Power Station Docket Number 50-254, DPR-29, Unit One Enclosed l's Licensee Event Report (LER)89-025, Revision 00, for Quad Cities Nuclear Power Station.

This report is submitted in accordance with the requirements of the Code of Federal Regulations, Title 10, Part 20.405(a)(1)(iv), which requires the licensee

'to make a report in writing within 30 days of the occurrence of any incident for-which notification is required by 10CFR20.403. '

Respectfully, COMMONWEALTH EDISON COMPANY QUAD CITIES NUCLEAR POWER STATION R. L. Bax Station Manager RLB/MJB/eb Enclosure cc: R. Stols R. Higgins INPO Records Center NRC Region III 2526H ggi2gg $$ 4

- y S-

e LICENSEE EVENT REPORT (LER)

Form Rev 2.0 Fact 11ty Name (1) Docket Number (2) Pane f31

. a..a e t t ies ta t t One of El of of of 21 El 4. 1 lerlolt Title (4). Potential Damage to New Fuel Bun 01e LYu 325 From Isnpact of Rx Blog Crane Aux Hook When Hoist  ;

Inadvertent 1v Lowered oue to Personnel Error.

Event cate (E) LER k - r f61 Reoort cate (71 Other Faci 11tiet Involved (R) i Month Day Year Year /// Sequential p//,j/ Revision Month Day Year F ac t_l it y Names cocket Numberft) >

l lll,jl u~ r fjj uu-kar P '

el El of of of I l

~ ~

11 2 21 o al e al o oi2 Is oIo oI1 ils el o el El el of of I I  ;

THIS REPORT 15 $USMITTED PUR$UANT TO THE REQUIREMENTS OF 10CFR I f theek one or more of the followinn) fil) '

4 20.402(b) _ 20.405(c) 50.73(a)(2)(iv) _, 73.71(b)

POWER __., 20.405(a)(1)(1) 50.36(c)(1) _ 50.73(a)(2)(v) 73.71(c)

LEVEL 20.405(a)(1)(11) 50.36(c)(2) 50.73(a)(2)(vii) Other (Specify fle) o!a!0 20.405(a)(1)(111) 50.73(a)(2)(1) _ 50.73(a)(2)(v111)(A) in Abstract

////////////////////////// K. 20.405(a)(1)(iv) 50.73(a)(2)(ii) 50.73(a)(2)(viit)(B) below and in

////////////////////////// __ 20.405(a)(1)(v) 50.73(a)(2)(iii) 50.73(a)(2)(x) Text) t LICENSEE CONTACT FOR THIS LER f121 Name TELEPHONE NUMBER AREA CODE

.lohn techmaier. Technical Staff Ennineer. Extention 2174 3 lol9 61 El 41 -l 21 21 41 C061PLETE ONE LINE FOR EACH COMP 0 FAILURE DESCRIBED IN THIS REPORT f13)

CAUSE SYSTEM COMPONENT MANUFAC- REPORTABLE CAUSE SYSTEM COMPONENT MANUFAC- REPORTABLE TURER To NPRot TURER TO NPRDS I I I I I I I I l l 1 1 l i 1 I I I I I I I I i 1 I I I

$UPPLEMENTAL REPORT EXPECTED f14) Expected Month I oav i Year Submission lYet fff yet. conclete EXPECTED SUBMI$1 ION DATE) X l N0 l l l ABSTRACT (L*mtt to 1400 spaces, i.e. approximately fifteen single-space typewritten lines) (16)

ABSTRACT:

1 I

At 1230 hours0.0142 days <br />0.342 hours <br />0.00203 weeks <br />4.68015e-4 months <br />, on December 20, 1989, Unit One was in the PUN mode at 89 percent of rated core thermal power.

A determination was made at this time that new fuel bundle LYU325 may have been damaged in excess of $2,000.00. The Reactor Building Overhead Crane Auxiliary Holst hook had contacted the side of the bundle during fuel receiving activities on December 14, 1989.

The cause of this event was personnel error involving an inadvertent action due to inattention. The fuel handler operating the overhead crane lowered the hoist without a signal man and inadvertently Continued to lower the hoist until the hook had contacted the fuel bundle.

Corrective action included temporarily removing the fuel handler from operating the crane. The fuel bundle will be shipped back to General Electric for inspection and replacement of any possibly damaged parts.

This report is submitted to comply with'the requirements of 10CFR20.405(a)(1)(tv).

2509H

FACILITY BAME (1). DOCKET NupSER (2) Ltt hussars f &) Pane it)

Year seguential Revision o'uas cities unit one' 0 l E l 01010121 El 4 aIe - 01211 -

0l0 01 2 or oli Ttxi Energy Inoustry toentif testion system (ttIs) cooes are ioenttttee in the text as (xx)

PLANT AND SYSTEM IDENTIFICATION:

General Electric - Boiling Water Reactor - 2511 MWt rated core thermal power.

EVENT IDENTIFICATION: Potential Damage to New Fuel Bundle LYU325 From Impact of Rx. Bldg. Crane Aux. Hook When Holst Inadvertently Lowered -

Due to Personnel Error.

A. CONDITIONS PRIOR TO EVENT:

Unit: One Event Date: December 20, 1989 Event Time: 1230 Reactor Mode: 4 Mode Name: RUN Power Level: 89%

This report was initiated by Deviation Report D-4-01-89-124.

RUN Mode (4) - In this position the reactor system pressure is at or.above 825 psig, and the reactor protection system is energized, with APRM protection and RBM interlocks in service (excluding the 15% high flux scram).

B. DESCRIPTION OF EVENT:

At 0945 hours0.0109 days <br />0.263 hours <br />0.00156 weeks <br />3.595725e-4 months <br />, on December 14. 1989, Unit One was in the RUN mode at 91 percent of rated core thermal power. Operations were-in progress to place the new Unit Two reload fuel into the new fuel storage vault (NFSV)[RK). The metal shipping containers (MSC's) were laid out side by side on the refuel floor in a row. east to west. These MSC's were in the horizontal position with their lids and end caps removed. The fuel handlers (FH's) on the floor were installing the retention bars on the MSC's and completing preparations for loading the MSC's into the new fuel transfer basket (NFTB)[BSKT3. As this work was proceeding, another FH operating the Reactor Building Overhead Crane [CRN] positioned the crane over the area of the MSC's. He then lowered the 9-ton hoist (HOI) hook to aid in aligning the hoist over a MSC.

This was installing retention done bars without on the the awareness of the FH's on the floor who were MSC's. The crane operator ~ continued to lower the hoist until the hook contacted and then partially laid over onto a new fuel bundle (LYU325). A FH on the floor noticed this and directed the crane operator to take the hook off the bundle. The crane operator raised the hoist to remove the hook from the top of the fuel bundle. The fuel handling foreman (FHF) then arrived on the floor and was informed of what had happened. The FHF notified a Qualified Nuclear Engineer (QNE) who went-to the refuel. floor and examined.the fuel bundle.

The QNE found a few scratches on-two rods [ ROD] in the area where-the hook had-contacted.the fuel-bundle. However, the scratches were only approximately one mil.

in depth, and no denting, bowing, or other type of damage could be seen. The QNE indicated that the fuel bundle could be put into the NFSV. A different FH was assigned to operate the overhead crane. The fuel bundle was put into the NFTB and then transferred into the-NFSV. The QNE left the refuel floor and informed an

-Operating Engineer (OE) of the situation. The OE ordered the job stopped at.1050 hours0.0122 days <br />0.292 hours <br />0.00174 weeks <br />3.99525e-4 months <br />, so the event could be evaluated. The job was later permitted to resume at 1410 hours0.0163 days <br />0.392 hours <br />0.00233 weeks <br />5.36505e-4 months <br />.

2s09H d

Lif Ekstf EVthf REPORT f LER) Ttxt tbkT M 4 TIDE Farm Rev 2.0 FACILITY MAME (1) D0cKEt NUMER (2) ,Jg, M t (fil Pane fil j Year ! / sequential Revision Ql g///

Quad cities unit one itxt o i E I o I o I o 1 21 El 4 aIeI-lcI2Is - oIo el 1 or als Energy Inoustry Identification system (ttis) codes are toentttted in the text as [xx)

From the initial visual inspection, fuel bundle LYU325 appeared to be undamaged, therefore, no notifications were made at this time. Discussions were held with General Electric and CECO Nuclear Fuel Services (NFS) Department to determine if any damage may have occurred to the fuel bundle which could not be visually detected without taking it apart. General Electric was given all information pertinent to how the hook contacted the fuel bundle; hook weight, cable (cbil weight, hoist speed, location of contact, etc.

After further consideration, General Electric determined that the fuel bundle would require disassembly to determine any damage. The decision was then made that the fuel bundle would be shipped back to General Electric for inspection and replacement of any possibly damaged parts.

Since the potential for damage in excess of $2,000.00 existed, the incident was determined to be reportable. This determination was made at 1230 hours0.0142 days <br />0.342 hours <br />0.00203 weeks <br />4.68015e-4 months <br />, on December 20, 1989. Unit One was in the run mode at 89 percent of rated core thermal power. At 1035 hours0.012 days <br />0.288 hours <br />0.00171 weeks <br />3.938175e-4 months <br />, on December 21, 1989, a 24-hour Emergency Notification System (ENS) phone notification was made to the NRC per 10CFR20.403 -

greater than $2,000.00 damage to licensed material. A 24-hour notification to Illinois Department of Nuclear Safety (IDNS) was made on December 21, 1989. IDNS indicated a follow-up telegram would not be necessary.

There were no other structures, systems or components inoperable or degraded at the start of this event which could have contributed to the event.

C. APPARENT CAUSE OF EVENT:

This event is being reported in accordance with 10CFR20.405(a)(1)(iv), which requires the licensee to make a report in writing within 30 days of the occurrence of any incident for which notification is required by 10CFR20.403.

The cause of this event was personnel error involving an inadvertent action due to inattention. The FH operating the overhead crane lowered the hoist and inadvertently continued to lower the hoist until the hook had contacted the fuel bundle. The FH's on the floor were installing retention bars to the MSC's and did not see the hook being lowered. Standard practice has the crane operator lower the hook down to just above the level of the head of a standing man. The hook is then lowered to the required height under the direction of a signalman. QAP 500-10.

Heavy Load Handling Personnel Job Duties, specifies that a signalman shall give hand signal directions to the trane operator for the safe pick-up, movement and set down of the load. However, no restrictions are specified for the movement of the 9-ton book when it is unloaded. At no time was there any intent to lift or move any loads, 2s09H

l LIftkitt EVthT REPORT fLER) TEXT C0kTf ktl4710N Fore Rev 2.0 FAc!LITY NAME (1) DOCKET NuPert (2) tre ktsett fE1 Pane f31 J Year /// sequential /// Revision

, /p/p/, Number ,/g/

/ Ng! ggt duad Cities Unit One 0 l 5 1 0 1 0 1 0 1 21 El 4 Bl9 Ol2lE Dl0 01 4 0F 015 Ttxt Energy Industry toentification system (Ells) codes are toentified in the text as (xx]

l D. SAFETY ANALYSIS OF EVENT:

The safety consequences of this event are minimal. The fuel bundle contacted by the lowered hook was new and, therefore, had not been irradiated. Therefore, there was no potential for release of radioactivity due to the fuel bundle being damaged by the hook. The fuel bundle is being shipped back to General Electric for inspection and replacement of any possibly damaged parts. Of potential concern is whether this event could happen with irradiated fuel. The irradiated fuel is stored in the fuel pool storage racks (RK) and the movement of this fuel is performed with the refuel bridge (DF)(FMB) and not the overhead crane. For loads over 750 lbs., use of the overhead crane is permitted only in the Restricted Mode, which prevents operation over the irradiated fuel in the fuel racks. Loads of 750 lbs. or less do not require operating in the Restricted Mode and, therefore, the potential exists that a hoist from the overhead crane could be lowered onto irradiated fuel in the fuel racks. However, this weight is within the designed limits for the racks, therefore, the subtriticality of the fuel arrays would not be modified and the structural integrity of the fuel racks would be maintained in the event that a hook was lowered onto the fuel. In addition, any irradiated fuel rod damage would be bounded by the refueling accident as described in the FSAR.

E. CORRECTIVE ACTIONS:

The immediate corrective action taken was to visually examine the fuel bundle for possible damage. Only minor scratches were found during the initial examination.

A different FH was assigned to operate the overhead crane. The OE had the job halted to evaluate the event. The job was later permitted to continue; however, the FH at error was not alloweJ to move fuel at this time.

Training was given to FH personnel on proper crane operation and on this event.

A discussion between the Department Head and the FH that caused this event was completed. The importance of jc'. awareness was stressed. The FH was then permitted to operate the crane.

The fuel bundle will be shipped back to General Electric for inspection and replacement of any possibly damaged parts. If necessary, a new fuel bundle will be provided by General Electric for use during the upcoming cycle. The procedures involving crane operation, heavy load movement and lifting and rigging were reviewed and found adequate.

F. PREVIOUS EVENTS:

A review of past Licensee Event Reports (LER's) and Deviation Reports (DVR's) revealed two related documented events in the last five years:

DVR 4-1-87-081 Damaged Spacer on Fuel Bundle Due to Faulty Rack Location LER 254/89-16 New Fuel Assembly Dropped in Fuel Pool When Refuel Grapple Released Due to Personnel Error and Lack of Procedural Guidance Based upon the corrective actions taken, no further corrective actions are deemed necessary at this time. .

j 2s09H

x -

p

!e -

, _ha

' llf Ehl* - "Vthf REPf)RT flfk) TEXT CDelf tanlAflDN , ~ Form Rev 2.0 FACILITY NAME (11- 00CKLt' NUMBER (2) _.

Ltt Musaare (6) Pana f21 y

Year j/l/j Sequential

/

l//l/

Revision

' ljj uv ' - jlll u'y Qua1 Citiet Unit One" 0 i E l 0 l 0 1 0 1 21 El'd RI9 . Ol2lE - 010 01 E OF DIE TEXT. -Energy Industry Identification Syst(m (E!!S) codes are identified in the text as [XX)'

. G. s COMPONENT FAILURE _ DATA:

There was-'no component failure identified in this event.

f' s

l l

1 i

1 J

l l

2

!2509H' j

- w