MONTHYEARML20029D0201994-04-25025 April 1994 LER 94-007-01:on 931014,high Head Safety Injection Flow Balance Testing Found to Be Below TS Requirement.Caused by Unaccounted for Uncertainties.Cold Leg Safety Injection Leg Throttle Valve adjusted.W/940425 Ltr ML20045G9391993-07-0808 July 1993 Lr 93-017-00:on 930616,containment Hydrogen Analyzer Heat Trace Channel Calibration Not Performed on Staggered Test Basis Due to Inadequate Implementation of TS Amend.Test Procedure Satisfactorily performed.W/930708 Ltr ML20044H1591993-05-27027 May 1993 LER 93-016-00:on 930509,discovered That Containment Hydrogen Analyzer Pressure Switch PS-3 Sensing Line Disconnected in Local Panel.Caused by Personnel Error. Pressure Switch Calibr & Line reconnected.W/930527 Ltr ML20044D5711993-05-14014 May 1993 LER 93-002-00:on 930416,automatic Reactor Trip Initiated from Turbine Trip Due to Over Excitation of Main Generator. Emergency Procedure 2-E-0 Entered & Individuals Involved in Event Received Remediated training.W/930514 Ltr ML20044D2281993-05-12012 May 1993 LER 93-003-00:on 930424,manual Reactor Trip Initiated Due to Erratic Feedwater Flow Indications to SG C & Excessive Main Feedwater Regulating Valve Oscillations.Caused by Design Instabilities.Secondary Sys secured.W/930512 Ltr ML20044C9541993-05-0707 May 1993 LER 93-015-00:on 930427,discovered That Portions of Containment Pressure Channels That Input to Containment Spray hi-hi Pressure Not Tested Monthly.Caused by Personnel Error.Test Procedures changed.W/930507 Ltr ML20044C9811993-05-0606 May 1993 LER 93-014-00:on 930411,as-found Speed Setting of Steam Driven AFW Pump 1-FW-P-2 Found Below Required TS Limit. Caused by Incorrect Speed Control Setting.Pump Speed Adjusted & Maint Personnel counseled.W/930506 Ltr ML20024G6841991-04-18018 April 1991 LER 91-006-00:on 910403,discovered That Ac Offsite Power Source Surveillance Not Performed Due to Personnel Error. Surveillance Initiated Immediately & Positive Discipline Administered to supervisor.W/910418 Ltr ML20029B5601991-03-0606 March 1991 LER 91-005-00:on 910209,containment Building Penetrations Breached.Caused by Inadequate Procedural Controls.Core Mapping & Cavity Pump Down Activities Secured,Air Hose Removed & Hydrolase Hose capped.W/910306 Ltr ML20029A6471991-02-22022 February 1991 LER 91-004-00:on 910206,sealed Radioactive Source in Storage Not Leak Tested Prior to Use.Caused by Inadequate Procedures for Verifying Leak Testing of Sources.Procedures Revised.W/ 910222 Ltr ML20028H6681991-01-18018 January 1991 LER 90-009-01:on 900719,discovered That Response Time Testing of Pressurizer High Level Reactor Trip Function Not Performed in Accordance W/Tech Spec 3.3.1.1,Table 3.3-2. Caused by Personnel Error.Procedures revised.W/910118 Ltr ML20043H8321990-06-22022 June 1990 LER 90-007-00:on 900523,discovered That Two Sets of Concrete Roof Blocks on Svc Water Pump House Not in Required Safety Position.Caused by Lack of Administrative Controls.Blocks Restored to Required locations.W/900622 Ltr ML20043D5801990-06-0404 June 1990 LER 90-006-00:on 900504,casing Cooling Pump Not Put Into Alert Status & Surveillance Missed.Caused by Personnel Error.Pump 1-RS-P-3B Placed in Alert status.W/900604 Ltr ML20012E3301990-03-27027 March 1990 LER 90-003-00:on 900228,52 Valves Identified Not Included in Tech Spec Required Monthly Containment Integrity Verification Surveillance Program.Caused by Personnel Error & Inadequate Procedure.Procedure revised.W/900327 Ltr ML20012B6441990-03-0808 March 1990 LER 90-001-00:on 900215,inadvertent Partial Train a ESF Actuation of Containment Depressurization Sys Occurred. Caused by Human Error.Evaluation to Be Performed to Determine If Test Points Can Be moved.W/900308 Ltr ML20006E2371990-02-0808 February 1990 LER 90-001-00:on 900123,reactor Trip Occurred on Steam Feedwater Flow Mismatch.Caused by Failed Circuit Driver Card on Feedwater Regulating Valve.Feedwater Regulating Valve Driver Card replaced.W/900208 Ltr ML20006E3771990-02-0505 February 1990 LER 90-002-00:on 900127,fuel Bldg Ventilation Sys Not Aligned to Discharge Through Auxiliary Bldg HEPA Filter & Charcoal Adsorber Assembly During Fuel Movement.Caused by Personnel Error.Disciplinary Action taken.W/900205 Ltr ML20006A8531990-01-19019 January 1990 LER 89-019-00:on 891228,discovered That Outer Door of Containment Equipment Escape Air Lock Was Drawing in Air & Inner Door Noted as Not Being in Fully Closed Position.Cause Undetermined.Sys Enhancements Being evaluated.W/900119 Ltr ML20005F8781990-01-11011 January 1990 LER 89-018-00:on 891219,determined That Three Pressurizer Pressure Safety Injection Instrumentation Channels May Not Have Adequate Margin Between Actuation Setpoint & Bottom of Instrument span.W/900111 Ltr ML19332D5471989-11-22022 November 1989 LER 85-003-03:on 890907,determined That Situation Could Arise Where Water Level Would Rise to 264 Ft Before Next Required Surveillance Interval.Cause Not Determined.Dike to Be constructed.W/891122 Ltr ML20024B7821983-07-0606 July 1983 LER 83-048/03L-0:on 830606 & 17,intermediate Range Channels N35 & N36 High Neutron Flux Reactor Trip Setpoints Exceeded Tech Spec Requirements.Caused by Administrative Error. Setpoints reduced.W/830706 Ltr ML20024C1361983-06-30030 June 1983 LER 83-031/03L-0:on 830614,w/unit at 100% Power,Fire Door S54/5 from Emergency Switchgear Room to Cable Vault Would Not Latch.Fire Watch Posted Immediately.Caused by Misaligned Strike.Door Repaired within 1 h.W/830630 Ltr ML20024C3721983-06-30030 June 1983 LER 83-042/03L-0:on 830606,vital Bus 1-I Momentarily Deenergized While Trying to Clear Inverter Trouble Alarm. Caused by Operator Error.Bus energized.W/830630 Ltr ML20024B9891983-06-28028 June 1983 LER 83-047/03L-0:on 830530,emergency Diesel Generator 2J Tripped on High Crankcase Pressure During Surveillance Testing.Cause Not Determined.Diesel Tested Satisfactorily. W/830628 Ltr ML20024C2941983-06-23023 June 1983 LER 83-044/03L-0:on 830526,during Mode 3,one Recirculation Valve on Each of Two Casing Cooling Pumps Found Open.Caused by Procedure Inadequacy.Valves Closed Immediately.Maint Procedure Will Be revised.W/830623 Ltr ML20024C3071983-06-22022 June 1983 LER 83-034/03L-0:on 830525,during Mode 1,one Header of Control Room Bottled Air Pressurized Sys Had Lower than Required Pressure.Probably Caused by Leak from B Bank of Air Bottles.Header repressurized.W/830622 Ltr ML20024C0971983-06-22022 June 1983 LER 83-045/03L-0:on 830614,Fire Door S71-18,between Emergency Diesel Generator Room 2H & Turbine Bldg,Would Not Latch & Lock.Caused by Stuck Latch.Latch Adjusted & Lubricated.Door Designs modified.W/830622 Ltr ML20023E0951983-06-0101 June 1983 LER 83-027/03L-0:on 830505,one Header (42 Bottles) of Control Room Bottled Air Pressurized Sys Found to Have Lower than Required Pressure (2,290 Vs 2,300 Psig).Probably Caused by Leakage When Compressor malfunctioned.W/830601 Ltr ML20023E0721983-05-26026 May 1983 LER 83-029/03L-0:on 830509,following Rapid Rampdown from 100% to 4% power,I-131 Dose Equivalent Exceeded 1.0 Uci/G. Caused by Unidentified Fuel Element Defect Worsened by post-rampdown Conditions.Sampling increased.W/830526 Ltr ML20023D5371983-05-13013 May 1983 LER 83-022/03L-0:on 830412,review of ASME XI Iwv Program Identified 192 Valves Not Exercised &/Or Stroke Timed.Caused by Fragmented Implementation of Testing Program.Programs Upgraded ML20023D2491983-05-11011 May 1983 LER 83-032/03L-0:on 830412,during Mode 5,visual Insp of Hydraulic Snubber 2-WGCB-HSS-3B Revealed Damaged Reservoir W/O Fluid.Caused by Personnel Working in Area.Snubber Replaced ML20023C5371983-05-10010 May 1983 LER 83-021/03L-0:on 830411,Fire Door S-71-7 Between Svc Bldg Health Physics Area & Auxiliary Bldg Would Not Self Close.Caused by Removal of Reclosure Device for Maint of Closure Coupling.Reclosure Device Reinstalled ML20023B5931983-04-27027 April 1983 LER 83-029/03L-0:on 830402,during Mode 4,automatic Actuation of ECCS Occurred.Caused by Maint Personnel Standing on Conduit Resulting in Loss of lo-lo Pressurizer Pressure Safety Injection Block.Maint Personnel Reinstructed ML20023B5701983-04-27027 April 1983 LER 83-008/03L-0:on 830410,review Revealed That Procedure Used to Restore Boron Injection Tank Concentration Introduced Potential Unanalyzed Injection Flow Diversions. Caused by Oversight.Emergency Procedures Revised ML20028G6541983-02-0909 February 1983 LER 83-003/03L-0:on 830122,during Mode 5,RHR Flow Was Lost for 4 Minutes.Caused by Failure of 15 Kv a Inverter to Ac Vital Bus 1-III,de-energizing Auxiliary Relay for Pressure Channel P-1403.Vital Bus 1-III & RHR Flow Restored ML20028G6311983-02-0909 February 1983 LER 83-016/03L-0:on 830115 & 16,both Open & Closed Containment Isolation Valves TV-SI-200 & TV-CC-204C,train a Position Indication Lights Found Lit.Caused by Leaking Steam Generator Chemical Feed Line Vent Valve ML20028G0781983-01-31031 January 1983 LER 83-001/03L-0:on 830112,primary Grade Water Isolation Valve to Blender 1-CH-217 Remained Open Longer than Tech Spec Requirements.Caused by Personnel Error.Responsible Operator Reinstructed ML20028G0381983-01-28028 January 1983 LER 83-002/03L-0:on 830104,two of Four 2H Emergency Diesel Generator Surveillance Tests Required by Tech Spec Missed During Nov-Dec 1982.Caused by Scheduling Error.Test Frequency Increased to Meet Tech Spec Requirements ML20028G0131983-01-28028 January 1983 LER 83-011/03L-0:on 821119,individual Rod Position Indication Deviated from Group Demand Position by Greater than 12 Steps.Caused by Instrument Drift.Indicator Channel for Rods B-09 & 02 & F-06 Recalibr ML20028F3501983-01-19019 January 1983 LER 83-008/03L-0:on 830107,during Mode 3,individual Rod Position Indication Deviated from Group Demand Position by Greater than 12 Steps While Withdrawing Shutdown Bank B. Caused by Instrument Drift.Rods Recalibr ML20028E0391983-01-11011 January 1983 Updated LER 82-079/03X-1:on 821126,flow Path from Boric Acid Tanks to RCS Found Inoperable.Caused by Ruptured Diaphragm of Boric Acid Transfer Pump Suction Header Isolation Valve 1-CH-80.Valve Diaphragm Replaced ML20028E0441983-01-11011 January 1983 LER 82-085/03L-0:on 821215,w/unit at Full Power,Emergency Diesel Generator 2J Removed from Svc for 7 H to Adjust Voltage Regulator Response Time.Caused by Voltage Regulator Drift.Procedures Will Be Revised ML20028E0201983-01-11011 January 1983 LER 82-084/03L-0:on 821216,during Full Power,Input from Range Nuclear Instrument N-42 to Comparator Drawer N-50 Was in Defeat.Caused by Failure to Take N-42 Out of Defeat After Deviation Alarm Determination.Operators to Be Reinstructed ML20028E0781983-01-11011 January 1983 LER 82-078/03X-1:on 821125,w/unit in Mode 3,120-volt Ac Vital Bus 1-IV Lost Voltage.Caused by Failure of Normal Power Supply Inverter 1-VB-I-04,due to Failed Oscillator Board,Transformer & Fuse.Components Replaced ML20028D1311983-01-0505 January 1983 LER 82-083/03L-0:on 821213,emergency Diesel Generator 2J Removed from Svc.Caused by Failure of 40X Unexcitation Alarm Relay Coil.Carbon Deposits & Arcing Damage of 40/76 Relay Contact Prevented Good Contact ML20028D1571983-01-0505 January 1983 Updated LER 81-071/03X-2:on 810911,hydraulic Snubber on Main Steam Line Discovered Inoperable Due to Loss of Oil from Reservoir.Caused by Leak Due to Scored Brass Bushing on Piston Shaft.Snubber Purged & Refilled.Reach Rod Retorqued ML20028C5191982-12-31031 December 1982 LER 82-083/03L-0:on 821204,while Operating at 17% Rated Thermal Power,Turbine Control Sys Malfunctioned Causing Sudden Increase in Load,Resulting in Reactor Trip.Caused by Malfunction of Analog Converter ML20028A8651982-11-16016 November 1982 LER 82-067/03L-0:on 821019,suction to RHR Sys Pumps a & B Lost for 36 Minutes.On 821020,pump Suction Lost for 33 Minutes.Caused by Ambiguous RCS Level Indication While Water Drained to Centerline of Nozzles.Water Added ML20028A8821982-11-16016 November 1982 LER 82-060/03L-0:on 821019,station Battery I-IV Failed 18- Month Discharge Surveillance Test.Caused by Natural End of Life.Battery Replaced ML20028A9781982-11-16016 November 1982 LER 82-071/03L-0:on 821027,control Power for B Casing Cooling Pump Found de-energized.Caused by Opened Circuit Breaker Unintentionally Disturbed by Workers.Circuit Breaker Closed & Power Verified 1994-04-25
[Table view] Category:RO)
MONTHYEARML20029D0201994-04-25025 April 1994 LER 94-007-01:on 931014,high Head Safety Injection Flow Balance Testing Found to Be Below TS Requirement.Caused by Unaccounted for Uncertainties.Cold Leg Safety Injection Leg Throttle Valve adjusted.W/940425 Ltr ML20045G9391993-07-0808 July 1993 Lr 93-017-00:on 930616,containment Hydrogen Analyzer Heat Trace Channel Calibration Not Performed on Staggered Test Basis Due to Inadequate Implementation of TS Amend.Test Procedure Satisfactorily performed.W/930708 Ltr ML20044H1591993-05-27027 May 1993 LER 93-016-00:on 930509,discovered That Containment Hydrogen Analyzer Pressure Switch PS-3 Sensing Line Disconnected in Local Panel.Caused by Personnel Error. Pressure Switch Calibr & Line reconnected.W/930527 Ltr ML20044D5711993-05-14014 May 1993 LER 93-002-00:on 930416,automatic Reactor Trip Initiated from Turbine Trip Due to Over Excitation of Main Generator. Emergency Procedure 2-E-0 Entered & Individuals Involved in Event Received Remediated training.W/930514 Ltr ML20044D2281993-05-12012 May 1993 LER 93-003-00:on 930424,manual Reactor Trip Initiated Due to Erratic Feedwater Flow Indications to SG C & Excessive Main Feedwater Regulating Valve Oscillations.Caused by Design Instabilities.Secondary Sys secured.W/930512 Ltr ML20044C9541993-05-0707 May 1993 LER 93-015-00:on 930427,discovered That Portions of Containment Pressure Channels That Input to Containment Spray hi-hi Pressure Not Tested Monthly.Caused by Personnel Error.Test Procedures changed.W/930507 Ltr ML20044C9811993-05-0606 May 1993 LER 93-014-00:on 930411,as-found Speed Setting of Steam Driven AFW Pump 1-FW-P-2 Found Below Required TS Limit. Caused by Incorrect Speed Control Setting.Pump Speed Adjusted & Maint Personnel counseled.W/930506 Ltr ML20024G6841991-04-18018 April 1991 LER 91-006-00:on 910403,discovered That Ac Offsite Power Source Surveillance Not Performed Due to Personnel Error. Surveillance Initiated Immediately & Positive Discipline Administered to supervisor.W/910418 Ltr ML20029B5601991-03-0606 March 1991 LER 91-005-00:on 910209,containment Building Penetrations Breached.Caused by Inadequate Procedural Controls.Core Mapping & Cavity Pump Down Activities Secured,Air Hose Removed & Hydrolase Hose capped.W/910306 Ltr ML20029A6471991-02-22022 February 1991 LER 91-004-00:on 910206,sealed Radioactive Source in Storage Not Leak Tested Prior to Use.Caused by Inadequate Procedures for Verifying Leak Testing of Sources.Procedures Revised.W/ 910222 Ltr ML20028H6681991-01-18018 January 1991 LER 90-009-01:on 900719,discovered That Response Time Testing of Pressurizer High Level Reactor Trip Function Not Performed in Accordance W/Tech Spec 3.3.1.1,Table 3.3-2. Caused by Personnel Error.Procedures revised.W/910118 Ltr ML20043H8321990-06-22022 June 1990 LER 90-007-00:on 900523,discovered That Two Sets of Concrete Roof Blocks on Svc Water Pump House Not in Required Safety Position.Caused by Lack of Administrative Controls.Blocks Restored to Required locations.W/900622 Ltr ML20043D5801990-06-0404 June 1990 LER 90-006-00:on 900504,casing Cooling Pump Not Put Into Alert Status & Surveillance Missed.Caused by Personnel Error.Pump 1-RS-P-3B Placed in Alert status.W/900604 Ltr ML20012E3301990-03-27027 March 1990 LER 90-003-00:on 900228,52 Valves Identified Not Included in Tech Spec Required Monthly Containment Integrity Verification Surveillance Program.Caused by Personnel Error & Inadequate Procedure.Procedure revised.W/900327 Ltr ML20012B6441990-03-0808 March 1990 LER 90-001-00:on 900215,inadvertent Partial Train a ESF Actuation of Containment Depressurization Sys Occurred. Caused by Human Error.Evaluation to Be Performed to Determine If Test Points Can Be moved.W/900308 Ltr ML20006E2371990-02-0808 February 1990 LER 90-001-00:on 900123,reactor Trip Occurred on Steam Feedwater Flow Mismatch.Caused by Failed Circuit Driver Card on Feedwater Regulating Valve.Feedwater Regulating Valve Driver Card replaced.W/900208 Ltr ML20006E3771990-02-0505 February 1990 LER 90-002-00:on 900127,fuel Bldg Ventilation Sys Not Aligned to Discharge Through Auxiliary Bldg HEPA Filter & Charcoal Adsorber Assembly During Fuel Movement.Caused by Personnel Error.Disciplinary Action taken.W/900205 Ltr ML20006A8531990-01-19019 January 1990 LER 89-019-00:on 891228,discovered That Outer Door of Containment Equipment Escape Air Lock Was Drawing in Air & Inner Door Noted as Not Being in Fully Closed Position.Cause Undetermined.Sys Enhancements Being evaluated.W/900119 Ltr ML20005F8781990-01-11011 January 1990 LER 89-018-00:on 891219,determined That Three Pressurizer Pressure Safety Injection Instrumentation Channels May Not Have Adequate Margin Between Actuation Setpoint & Bottom of Instrument span.W/900111 Ltr ML19332D5471989-11-22022 November 1989 LER 85-003-03:on 890907,determined That Situation Could Arise Where Water Level Would Rise to 264 Ft Before Next Required Surveillance Interval.Cause Not Determined.Dike to Be constructed.W/891122 Ltr ML20024B7821983-07-0606 July 1983 LER 83-048/03L-0:on 830606 & 17,intermediate Range Channels N35 & N36 High Neutron Flux Reactor Trip Setpoints Exceeded Tech Spec Requirements.Caused by Administrative Error. Setpoints reduced.W/830706 Ltr ML20024C1361983-06-30030 June 1983 LER 83-031/03L-0:on 830614,w/unit at 100% Power,Fire Door S54/5 from Emergency Switchgear Room to Cable Vault Would Not Latch.Fire Watch Posted Immediately.Caused by Misaligned Strike.Door Repaired within 1 h.W/830630 Ltr ML20024C3721983-06-30030 June 1983 LER 83-042/03L-0:on 830606,vital Bus 1-I Momentarily Deenergized While Trying to Clear Inverter Trouble Alarm. Caused by Operator Error.Bus energized.W/830630 Ltr ML20024B9891983-06-28028 June 1983 LER 83-047/03L-0:on 830530,emergency Diesel Generator 2J Tripped on High Crankcase Pressure During Surveillance Testing.Cause Not Determined.Diesel Tested Satisfactorily. W/830628 Ltr ML20024C2941983-06-23023 June 1983 LER 83-044/03L-0:on 830526,during Mode 3,one Recirculation Valve on Each of Two Casing Cooling Pumps Found Open.Caused by Procedure Inadequacy.Valves Closed Immediately.Maint Procedure Will Be revised.W/830623 Ltr ML20024C3071983-06-22022 June 1983 LER 83-034/03L-0:on 830525,during Mode 1,one Header of Control Room Bottled Air Pressurized Sys Had Lower than Required Pressure.Probably Caused by Leak from B Bank of Air Bottles.Header repressurized.W/830622 Ltr ML20024C0971983-06-22022 June 1983 LER 83-045/03L-0:on 830614,Fire Door S71-18,between Emergency Diesel Generator Room 2H & Turbine Bldg,Would Not Latch & Lock.Caused by Stuck Latch.Latch Adjusted & Lubricated.Door Designs modified.W/830622 Ltr ML20023E0951983-06-0101 June 1983 LER 83-027/03L-0:on 830505,one Header (42 Bottles) of Control Room Bottled Air Pressurized Sys Found to Have Lower than Required Pressure (2,290 Vs 2,300 Psig).Probably Caused by Leakage When Compressor malfunctioned.W/830601 Ltr ML20023E0721983-05-26026 May 1983 LER 83-029/03L-0:on 830509,following Rapid Rampdown from 100% to 4% power,I-131 Dose Equivalent Exceeded 1.0 Uci/G. Caused by Unidentified Fuel Element Defect Worsened by post-rampdown Conditions.Sampling increased.W/830526 Ltr ML20023D5371983-05-13013 May 1983 LER 83-022/03L-0:on 830412,review of ASME XI Iwv Program Identified 192 Valves Not Exercised &/Or Stroke Timed.Caused by Fragmented Implementation of Testing Program.Programs Upgraded ML20023D2491983-05-11011 May 1983 LER 83-032/03L-0:on 830412,during Mode 5,visual Insp of Hydraulic Snubber 2-WGCB-HSS-3B Revealed Damaged Reservoir W/O Fluid.Caused by Personnel Working in Area.Snubber Replaced ML20023C5371983-05-10010 May 1983 LER 83-021/03L-0:on 830411,Fire Door S-71-7 Between Svc Bldg Health Physics Area & Auxiliary Bldg Would Not Self Close.Caused by Removal of Reclosure Device for Maint of Closure Coupling.Reclosure Device Reinstalled ML20023B5931983-04-27027 April 1983 LER 83-029/03L-0:on 830402,during Mode 4,automatic Actuation of ECCS Occurred.Caused by Maint Personnel Standing on Conduit Resulting in Loss of lo-lo Pressurizer Pressure Safety Injection Block.Maint Personnel Reinstructed ML20023B5701983-04-27027 April 1983 LER 83-008/03L-0:on 830410,review Revealed That Procedure Used to Restore Boron Injection Tank Concentration Introduced Potential Unanalyzed Injection Flow Diversions. Caused by Oversight.Emergency Procedures Revised ML20028G6541983-02-0909 February 1983 LER 83-003/03L-0:on 830122,during Mode 5,RHR Flow Was Lost for 4 Minutes.Caused by Failure of 15 Kv a Inverter to Ac Vital Bus 1-III,de-energizing Auxiliary Relay for Pressure Channel P-1403.Vital Bus 1-III & RHR Flow Restored ML20028G6311983-02-0909 February 1983 LER 83-016/03L-0:on 830115 & 16,both Open & Closed Containment Isolation Valves TV-SI-200 & TV-CC-204C,train a Position Indication Lights Found Lit.Caused by Leaking Steam Generator Chemical Feed Line Vent Valve ML20028G0781983-01-31031 January 1983 LER 83-001/03L-0:on 830112,primary Grade Water Isolation Valve to Blender 1-CH-217 Remained Open Longer than Tech Spec Requirements.Caused by Personnel Error.Responsible Operator Reinstructed ML20028G0381983-01-28028 January 1983 LER 83-002/03L-0:on 830104,two of Four 2H Emergency Diesel Generator Surveillance Tests Required by Tech Spec Missed During Nov-Dec 1982.Caused by Scheduling Error.Test Frequency Increased to Meet Tech Spec Requirements ML20028G0131983-01-28028 January 1983 LER 83-011/03L-0:on 821119,individual Rod Position Indication Deviated from Group Demand Position by Greater than 12 Steps.Caused by Instrument Drift.Indicator Channel for Rods B-09 & 02 & F-06 Recalibr ML20028F3501983-01-19019 January 1983 LER 83-008/03L-0:on 830107,during Mode 3,individual Rod Position Indication Deviated from Group Demand Position by Greater than 12 Steps While Withdrawing Shutdown Bank B. Caused by Instrument Drift.Rods Recalibr ML20028E0391983-01-11011 January 1983 Updated LER 82-079/03X-1:on 821126,flow Path from Boric Acid Tanks to RCS Found Inoperable.Caused by Ruptured Diaphragm of Boric Acid Transfer Pump Suction Header Isolation Valve 1-CH-80.Valve Diaphragm Replaced ML20028E0441983-01-11011 January 1983 LER 82-085/03L-0:on 821215,w/unit at Full Power,Emergency Diesel Generator 2J Removed from Svc for 7 H to Adjust Voltage Regulator Response Time.Caused by Voltage Regulator Drift.Procedures Will Be Revised ML20028E0201983-01-11011 January 1983 LER 82-084/03L-0:on 821216,during Full Power,Input from Range Nuclear Instrument N-42 to Comparator Drawer N-50 Was in Defeat.Caused by Failure to Take N-42 Out of Defeat After Deviation Alarm Determination.Operators to Be Reinstructed ML20028E0781983-01-11011 January 1983 LER 82-078/03X-1:on 821125,w/unit in Mode 3,120-volt Ac Vital Bus 1-IV Lost Voltage.Caused by Failure of Normal Power Supply Inverter 1-VB-I-04,due to Failed Oscillator Board,Transformer & Fuse.Components Replaced ML20028D1311983-01-0505 January 1983 LER 82-083/03L-0:on 821213,emergency Diesel Generator 2J Removed from Svc.Caused by Failure of 40X Unexcitation Alarm Relay Coil.Carbon Deposits & Arcing Damage of 40/76 Relay Contact Prevented Good Contact ML20028D1571983-01-0505 January 1983 Updated LER 81-071/03X-2:on 810911,hydraulic Snubber on Main Steam Line Discovered Inoperable Due to Loss of Oil from Reservoir.Caused by Leak Due to Scored Brass Bushing on Piston Shaft.Snubber Purged & Refilled.Reach Rod Retorqued ML20028C5191982-12-31031 December 1982 LER 82-083/03L-0:on 821204,while Operating at 17% Rated Thermal Power,Turbine Control Sys Malfunctioned Causing Sudden Increase in Load,Resulting in Reactor Trip.Caused by Malfunction of Analog Converter ML20028A8651982-11-16016 November 1982 LER 82-067/03L-0:on 821019,suction to RHR Sys Pumps a & B Lost for 36 Minutes.On 821020,pump Suction Lost for 33 Minutes.Caused by Ambiguous RCS Level Indication While Water Drained to Centerline of Nozzles.Water Added ML20028A8821982-11-16016 November 1982 LER 82-060/03L-0:on 821019,station Battery I-IV Failed 18- Month Discharge Surveillance Test.Caused by Natural End of Life.Battery Replaced ML20028A9781982-11-16016 November 1982 LER 82-071/03L-0:on 821027,control Power for B Casing Cooling Pump Found de-energized.Caused by Opened Circuit Breaker Unintentionally Disturbed by Workers.Circuit Breaker Closed & Power Verified 1994-04-25
[Table view] Category:TEXT-SAFETY REPORT
MONTHYEARML20217N9281999-10-20020 October 1999 Special Rept:On 991003,PZR PORV Actuation Mitigated RCS low- Temp Overpressure Transient.Caused by a RCP Facilitating Sweeping of Entrained Air Out of RCS Loops.Operating Procedure 2-OP-5.1 Will Be Revised ML20217H3631999-10-14014 October 1999 Rev 0 to COLR for North Anna 2 Cycle 14 Pattern Su ML18152A2811999-10-12012 October 1999 Technical Basis for Elimination of Nozzle Inner Radius Insps (for Nozzles Other than Reactor Vessel),Technical Basis for ASME Section XI Code Case N-619. ML20212J9251999-10-0101 October 1999 Safety Evaluation Accepting Licensee Relief Request IWE-3 for Second 10-year ISI for Plant ML20217D6851999-09-30030 September 1999 Monthly Operating Repts for Sept 1999 for North Anna Power Station,Units 1 & 2.With ML20211N2611999-09-0808 September 1999 Safety Evaluation Concluding That Proposed Irradiation of Fuel Rods Beyond Current Lead Rod Burnup Limit & Clarification of Terminology with Respect to Reconstituted Fuel Assemblies Acceptable ML20211J2561999-08-31031 August 1999 Safety Evaluation Accepting Elimination of Augmented ISI Program for Pressurizer Spray Lines at North Anna Unit 2 ML20216E5011999-08-31031 August 1999 Monthly Operating Repts for Aug 1999 for Naps,Units 1 & 2. with ML20211J2421999-08-31031 August 1999 Safety Evaluation Supporting Removal of Augmented Insp Program on RCS Bypass Lines from Licensing Basis of North Anna,Units 1 & 2 ML20210T0791999-08-13013 August 1999 Safety Evaluation Concluding That Revised Withdrawal Schedules for North Anna Units 1 & 2 Satisfy Requirements of App H to 10CFR50 & Therefore Acceptable ML20210S1411999-07-31031 July 1999 Monthly Operating Repts for July 1999 for North Anna Power Station.With ML20210Q9931999-07-31031 July 1999 Rev 1 to COLR for North Anna Power Station,Unit 2 Cycle 13 Pattern Ud ML20209E5641999-06-30030 June 1999 Monthly Operating Repts for June 1999 for North Anna Power Stations,Units 1 & 2.With ML20195G1901999-05-31031 May 1999 Monthly Operating Rept for May 1999 for NAPS Units 1 & 2. with ML20206L4831999-05-10010 May 1999 SER Accepting Request to Delay Submitting Plant,Unit 1 Class 1 Piping ISI Program for Third Insp Interval Until 010430, to Permit Development of Risk Informed ISI Program for Class 1 Piping ML20206Q6671999-04-30030 April 1999 Monthly Operating Repts for Apr 1999 for North Anna Power Station,Units 1 & 2.With ML20205S0391999-04-21021 April 1999 SER Accepting Request for Relief IWE5,per 10CFR50.55a(a)(3) & Proposed Alternatives for IWE2,IWE4,IWE6 & IWL2 Authorized Per 10CFR50.55a(a)(3)(ii) ML20205K3041999-03-31031 March 1999 Monthly Operating Repts for Mar 1999 for North Anna Power Station,Units 1 & 2.With ML20207K5921999-02-28028 February 1999 Monthly Operating Repts for Feb 1999 for North Anna Power Station,Units 1 & 2.With ML20207E1731999-02-18018 February 1999 Informs Commission of Status of Preparations of IAEA Osart Mission to North Anna Nuclear Power Plant Early Next Year ML20205A0241998-12-31031 December 1998 Summary of Facility Changes,Tests & Experiments,Including Summary of SEs Implemented at Plant During 1998,per 10CFR50.59(b)(2).With ML20199C8781998-12-31031 December 1998 Monthly Operating Repts for Dec 1998 for North Anna Power Station,Units 1 & 2.With ML20198H9541998-12-0303 December 1998 Safety Evaluation Authorizing Proposed Alternative for Remainder of Second 10-yr Insp Interval for Plant ML20198J5561998-12-0303 December 1998 ISI Summary Rept for North Anna Power Station,Unit 1 1998 Refueling Outage Owner Rept for Inservice Insps ML20197G8551998-11-30030 November 1998 Monthly Operating Repts for Nov 1998 for North Anna Power Station,Units 1 & 2.With ML20196G1381998-11-0303 November 1998 Safety Evaluation Authorizing Rev to Relief Request NDE-32 for Remainder of Second 10-yr Insp Interval for Each Unit ML20195D0571998-10-31031 October 1998 Monthly Operating Repts for Oct 1998 for North Anna Power Station,Units 1 & 2.With ML20154L0691998-10-14014 October 1998 COLR for North Anna Power Station Unit 1 Cycle 14 Pattern Xy ML20155J6911998-10-0909 October 1998 Staff Response to Tasking Memorandum & Stakeholder Concerns ML20154H4001998-09-30030 September 1998 Monthly Operating Repts for Sept 1998 for North Anna Power Station,Units 1 & 2.With ML20151X8011998-09-10010 September 1998 Special Rept:On 980622,groundwater Level at Piezometer P-22 Was Again Noted to Be Above Max Water Level by 0.71 Feet. Increased Frequency of Piezometer Monitoring & Installed Addl Piezometers at Toe of Slope Along Southwest Section ML20151W4711998-08-31031 August 1998 Monthly Operating Repts for Aug 1998 for North Anna Power Station Units 1 & 2.With ML20237A4341998-07-31031 July 1998 Monthly Operating Repts for July 1998 for North Anna Power Station,Units 1 & 2 ML20236V1251998-07-14014 July 1998 ISI Summary Rept for Naps,Unit 2,1998 Refueling Outage Owners Rept of Isis ML20236K5531998-07-0707 July 1998 SER Accepting Request for Change in ISI Commitment on Protection Against Pipe Breaks Outside Containment ML20236M3381998-06-30030 June 1998 Monthly Operating Repts for June 1998 for North Anna Power Station,Units 1 & 2 ML20248M1011998-05-31031 May 1998 Monthly Operating Repts for May 1998 for North Anna Power Station,Units 1 & 2 ML20248C8831998-05-29029 May 1998 SER Accepting Alternatives Proposed by Licensee for Use of Code Case N-535,pursuant to 10CFRa(a)(3)(i) in ASME Section XI Inservice Insp Program ML20247K9281998-05-15015 May 1998 Special Rept:On 980428,letdown PCV Exhibited Slow Response When C RCP Was Started.Cause to Be Determined.Review of Operating Procedure Will Be Performed to Determine If Enhancements Are Necessary ML20216A8971998-05-0606 May 1998 Rev 0 to Cycle 13 Pattern Ud COLR for North Anna Unit 2 ML20247F4441998-04-30030 April 1998 Monthly Operating Repts for Apr 1998 for North Anna Power Station,Units 1 & 2 ML20217B5321998-04-20020 April 1998 Safety Evaluation Supporting Proposed Alternative to ASME Code for Surface Exam of Seal Welds on Threaded Caps for Plant Reactor Vessel Head Penetrations for part-length CRDMs ML20217H9611998-04-0707 April 1998 Special Rept:On 980216,groundwater Level at Piezometer P-22, Again Noted to Be Above Max Water Level by 0.41 Feet.Design Package for Installation of Addl Standpipe Piezometers at Toe of Slope Southeast Section,Developed ML20216B1891998-03-31031 March 1998 Monthly Operating Repts for Mar 1998 for North Anna Power Station,Units 1 & 2 ML20216E8801998-03-0606 March 1998 Safety Evaluation Authorizing Licensee Request for Relief from ASME Code Requirements,Paragraph IWA-2400(c) (Summer Edition W/Summer 1983 Addenda),For Upcoming Naps,Unit 1 Outage,Per 10CFR50.55a(a)(3)(ii) ML20216E2561998-02-28028 February 1998 Monthly Operating Repts for Feb 1998 for North Anna Power Station,Units 1 & 2 ML20199J6431998-02-0202 February 1998 Safety Evaluation Approving Request for Approval to Repair Flaws in Accordance W/Gl 90-05 for ASME Code Class 3 SW Piping for North Anna,Unit 1,as Submitted in ISI Relief Request NDE-46 on 971218 ML20202D5811998-01-31031 January 1998 Monthly Operating Repts for Jan 1998 for North Anna Power Station,Units 1 & 2 ML20198S7571998-01-15015 January 1998 Safety Evaluation Accepting Licensee Request for Approval to Repair Flaws IAW GL-90-05 for ASME Code Class 3 Svc Water Piping ML20198P1351997-12-31031 December 1997 Monthly Operating Repts for Dec 1997 for North Anna Power Station,Units 1 & 2 1999-09-08
[Table view] |
Text
.
~. *
10 CFR 50.73 i VIRGINI A ELECTRIC AND PODER COMP ANY NORTM ANN A POSCR $T ATION I P. O. Box 402 [
ulNE R AL, VIRGINI A 23117 r January 19, 1990 ;
U. S. Nuclear Regulatory Commission Serial No. N 89-026 '
Attention: Document Contml Desk NAPS /DEQ:deg Washington, D.C. 20555 & Let No. 50 338 i t
l License No. NPF-4 '
i i'
Dear Sirs:
The Virginia Electric and Power Company hereby submits the following Licensee Event Report l applicablc to North Anna Unit 1.
i Report No. LER 89-019-00 l t
f This Report has been reviewed by the Station Nuclear and Operating Committee and will be forwarded to Safety Evaluation and Control for their review, i l
Very Truly Yours,
/ di.b. Kane Station Manager ;
i
Enclosure:
cc: U.S. Nuclear Regulatory Commission 101 Marietta Street, N.W.
Suite 2900 .
Atlanta, Georgia 30323 Mr. J. L. Caldwell NRC Senior Resident Inspector North Anna Power Station
[DR Apocg ogoggggg .
eDe fgaa 1
//t i
R 081# M W& .vCLthm ht;UL;.T00iv C0utee86 De/ g,,,p gp yp
- u. .. . .,= w
- e 181tMATIO DumDies Plh ht6PON$t TO CouPLY wtM TMit [
@'.f*i."
. uCENSEE EVENT REPORT (LER) ,t'UCT.'0'l'o'.' *,,0i. f',','u#E'50!I ECc'ES ,
'*!v*d70'v'e"0J.'Oin"' !UiJ",E'IES$5 WO O s'ou'a%in OM'#,.'O!?L?a"eM"'"
. .C,6,,7 ...t n , m c . . .v t . ,,, .. -
NORTil ANNA P0k'ER STATION, (* NIT 1 016 i o I o I o 131318 1 lor l014 t
,,,,8...
CONTAINMENT EQUIPMENT ESCAPE AIR LOCK LEAKAGE tytNT Daf t lla Ltm Numett p sti klP0mi Daf t (11 OTMt h 8 &Cl481st 8 tNv0LvtD 19) 8 8 C'L * ' h*W8 8 OM *l t hua.H m,si M0hth Day vtan vtan 68,4g '*, 4 [L*y woNTm Dev ttom 015101010 1 I I +
~ ~
1l2 2l8 8 9 8 l9 0l1l9 0l0 0l1 1l9 9l0 0:5 1 0lo:oi l 1 emsat*0avissv vtlDeva va=,,0v tn.0 vial.4=,30. oCeni<C e.... ... . ...,,nu !
0,8 , ,, ,,,,
- 1 N e031st N essasi 30 73mH2Het ?$ 711bl y ,_
n essioin Ha te mi.im u nieH H.i _
tttu.i i n., i iO i0 . .,n He, n.H,n .
_ =g,;.g,, , , :
90?SieH3HG 00 73mHill. 68H Al Js6AA >
a M .85telf t Hi6sl 1 _
M 406teH1Hwi g to illeHRHal to 73,enfH.saHti 90 est tent H.) 90 ?pmHtH6aN to 73ioutHei teclasset CONT ACT Dom ini8 Lim Ital N1wl itLEPHONE NuMDIR ahteCODE G. E. Kane, Station Manarer 7 ! O3 1 8 19 l4 1i2 i ll0l1 COMPLif t ON8 Leht 90A E ACM COMPONINT f alLumt bitCht980 IN fuit htP08tt n3t Cav60 Stille Cou*0hthi MA AC afp08,1,A CAvtt Ivtile COMP 0htNT "(hc PO to 9
?
l I I i l I i i i i i l 1 1 I I I I I I I I I i l I i I
$v8FLEMINT AL SC90RT IRPGCitD flei MONTH Dev Vlah SutMi&&iDN ili tre .ev esm.en Sk9tCTE0 Sv0w3Sr0% Dario a u t a C, ,t ,-. ., . . .. . . . ,..
[ No l l l 3 . ,. . . ,,,. .. . . , n e i At 2230 hours0.0258 days <br />0.619 hours <br />0.00369 weeks <br />8.48515e-4 months <br /> on December 28, 1989, with Unit I at 100 percent power <
(Mode 1 ), llcalth Physics personnel performing their weekly survey rounds reported that the outer door of the containment equipment escape air lock was drawing in air. Prior to performing a Periodic Test to quantify the leakage, the !
inner door was noted as not being in the fully closed position and was subsequently closed, thus restoring containment integrity. This event has been determined to be reportable pursuant to 10CFR50.73(a)(2)(li). A one hour report was made in accordance with 10CFR50.72(b)(ii). Additionally, an engineering calculation has determined that the leakage from the containment +
cscape air lock door during this event was greater than the maximum leakage allowed by Technical Specifications 3.6.1.2 and 3.6.1.3. Consequently, this event is also reportable pursuant to 10CFR50.73(a)(2)(1)(B).
Investigation could not identify why the inner door was not fully closed.
Procedural and system enhancements, recommended as a result of an event j investigation, will be evaluated and implemented as necessary. :
This event posed minimal significant safety implications because the i containment remained subatmospheric throughout this event. The health and I safety of the general public were not affected at any time during this event, j I
esRC P.am 300 (H96
= ace mu u wucuan tevevoar con =ew ;
UCENSEE EVENT CEPORT (LERI TEXT C NTINUATION enaowo owe =o Suo+os ;
LKPihlt 6 31 W
- l e ac4et y ,,anst en DOL &tl NutADta 421 Lth WOMDtk l$i t&00 tai [
Non'rH ANNA P0kTR STATION. l' NIT 1 0 ]6 l0 l0 l0 l 3 l3 ]8 8l9 -
0l Il 9 -
0l0 0l2 0F 0 l4 i earm ,, . - we s.,,,, mu .nm i
1.0 Description of the Event At 2230 hours0.0258 days <br />0.619 hours <br />0.00369 weeks <br />8.48515e-4 months <br /> on December 28, 1989, with Unit 1 at 100 percent power ;
(Mode 1 ), ficalth Physics personnel performing their weekly survey rounds reported that the outer door of the containment equipment escape air lock '
(Ells System identifier Nil , Component identifier AL) was drawing in air.
Following discovery of the outer door leakage, actions were initiated to perform Periodic Test (PT) 62.3,
- Equipment llatch Escape Lock Door Seals Testing," to quantify the seal leakage. At 0040 hours4.62963e-4 days <br />0.0111 hours <br />6.613757e-5 weeks <br />1.522e-5 months <br /> on December 29, 1989, prior to performing PT 62.3, the inner door was noted as not being in the i fully closed position and was immediately closed, thus restoring containment ,
integrity. Since the Surveillance Requirement of Technical Specification ;
4.6.1.3 requires that both the inner and outer doors of the containment equipment air lock be demonstrated operable within 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> following closing, preparations continued to perform PT 62.3. At 0115 hours0.00133 days <br />0.0319 hours <br />1.901455e-4 weeks <br />4.37575e-5 months <br /> on December 29, 1989, the outer door failed to pass PT 62.3 and the Action Statement of Technical Specification 3.6.1.3 was entered for one containment i escape air lock door being inoperable. The O rings on the outer door were cleaned and reinserted and PT 62.3 was satisfactorily completed on the outer door. The outer door was opened to provide access to the inner door. The inner door was successfully tested in accordance with 1 PT 62.3. The outer door was subsequently reclosed and satisfactorily tested as required by 1 PT. ,
62.3. The Action Statement of Technical Specification 3.6.1.3 was cleared at approximately 0315 hours0.00365 days <br />0.0875 hours <br />5.208333e-4 weeks <br />1.198575e-4 months <br /> on December 29, 1989. t At 0700 hours0.0081 days <br />0.194 hours <br />0.00116 weeks <br />2.6635e-4 months <br /> on December 29, 1989, Station Management discussed the containment escape air lock door events. Upon completion, the event was determined to be four hour reportable pursuant to 10CFR50.72(b)(iii)(C) and .
30 day reportable pursuant to 10CFR50.73(a)(2)(ii). At 1000 hours0.0116 days <br />0.278 hours <br />0.00165 weeks <br />3.805e-4 months <br /> on December 29, 1989, the Station Nuclear Safety and Operating Committec ;
conveined to reevaluate the events and discuss the engineering assessment of ,
the event. At that time, the event was determined to be one hour reportable pursuant to 10CFR50.72(b)(ii). At 1040 hours0.012 days <br />0.289 hours <br />0.00172 weeks <br />3.9572e-4 months <br />, a one hout report was made in accordance with 10CFR50.72(b)(ii).
Prior to this event Unit 1 experienced a reactor trip on December 5, 1989. In preparation for Unit startup following the reactor trip, the containment equipment escape air lock was verified to be closed and scaled by satisfactory completion of 1 PT 62.3,1 PT 62.2, " Containment Air Locks -
Interlocks," 1 PT 61.2.3, " Containment Type B Test - Equipment llatch," 1 PT.
61.2.3.1, " Containment Type B Test Equipment flatch "AS FOUND" Leak Rate )
Test," on December 8, 1989, llowever, preceding unit startup, a ground !
occurred on the 'B' Reactor Coolant Pump (RCP) and the containment equipment escape air lock was removed on December 12, 1989 to facilitate replacement of the 'B' RCP motor. After completion of the 'B' RCP motor replacement, the containment escape air lock was reinstalled and verified on
.e, -.- o x =
..e..... o . .,ocu= m oc, -..o ;
LICENSEE EVENT REPORT (LERI TEXT CONTINUATION maovio o= =o ame
. ,,. . tmais awe
. .a n v .. . n . =c a s i av=i a m .. . .uwe n . ..oi u,
'oa "c l;;P t'#.T l l
NORTti ANNA POWER STATION, UNIT 1 0 l6 l0 l0 l0 l3 [3 l8 8[9 -
0l 1l9 0l0 o l3 or o l4 j
I'6 " TeEr*!Ni$n*o7tYe'Eent Con t'd.
December 17, 1989 to be scaled by satisfactory completion of 1 PT 61.2.3, !
" Containment Type B Test - Equipment flatch,", In addition, on December 24, i 1989, the Security Department performed an alarm test on the security ?oor at the containment equipment escape air lock and did not observe increased noise levels due to escape air lock leakage, j An engineering calculation has determined that the leakage from the i containment escape air lock door during this event was greater than the l maxirnum leakage allowed by Technical Specifications 3.6.1.2 and 3.6.1.3. '
Consequently, this event is also reportable pursuant to 10CFR50.73(a)(2)(1)(B). j 2.0 Sicnifiennt S afety Conscauences and implientions This event posed minimal significant safety implications because the '
containment remained subatmospheric throughout this event. Therefore, there was no positive pressure differential to force any radioactive gas through the unsealed air locks. The health and safety of the general public were not affected at any time during this event.
3.0 Cause of the Event Investigation could not identify why the inner door was not fully closed.
4.0 Immediate Corrective Action ,
As an immediate corrective action, a procedure deviation was written .
and approved to test the outer door of the containment equinment escape air lock in an attempt to quantify the leakage. Prior to testing the outer door, the inner door was identified as not being fully closed and was immediately closed, thus restoring containment integrity.
5.0 Additional Corrective Action i I
After the inner door was fully closed, the outer door of the containment equipment escape air lock was tested in accordance with the Technical Specifications. The outer door failed to pass the periodic test and the Action Statement of Technical Specification 3.6.1.3 was entered. The o.
rings on the outer door were adjusted and PT-62.3 was satisfactorily completed on the outer door. The outer door was opened to 1.rovide access to the inner door. The inner door was successfully tested in accordance with 1 PT-62.3.
The outer door was subsequently closed and satisfactorily tested as required by 1 PT-62.3. The Action Statement of Technical Specification 3.6.1.3 was subsequently cleared.
'....-....., .. , , ..... , + m ;
ea v uc e a. = vesammes== 1 LICENSEE EVENT CEPORT (LERI TEXT C2NTINUATION A*aovio ose wo :=-e* I ixemis swa e A.uiv'ainws sie pucetti =smena tal tta wunseta ici tact (3' Ti a= " t!,@t' 'V.*.T NORTH ANNA P0k'ER STATION UNIT 1 o [6 l0 l0 l0 l 3 l3 l8 8l9 -
0 l1 l9 -
0l0 0l4 or 0l4 i
.trw - .m . . n-s uc s m .nm 5.0 Additional Corrective Action Cont'd.
i The following procedural and system enhancements, resulting from an event investigation, will be evaluated and implemented as necessary:
- 1. Installing break away plastic seals to the inner and outer door operators of the equipment hatch escape air locks to provide positive indication of operator movement.
- 2. Revising appropriate periodic tests and operating procedures to document and verify the seals are properly installed and I maintained intact. I
- 3. Adding placecards to the equipment hatch escape air locks that address the need for Control Room notification when the doors are operated.
An engineering calculation was also performed in an attempt to .
quantify the leakage.
6.0 Actions to Prevent Recurrence This is believed to be an isolated event, llowever, corrective actions identified from the event investigation will be evaluated and implemented as necessary to prevent recurrence of similar events.
7.0 Simlar Events On September 21, 1987, both Unit 2 containment air lock doors were discovered to be open in Mode 6 (Refueling) during control rod latching as a result of a procedure inadequacy and personnel error. This event was J reported in LER N2/87 010 00. !
8.0 Additional In form ation l Several followup inspections have been made to verify that both containment equipment air lock doors have remained closed. Also, Unit 2 was checked and !
no problems were identified. l
\
~.c... u. . .e... cre, a.. 3: .. -