Errata to Monthly Operating Rept for Mar 1990 for Palo Verde Nuclear Generating Station,Unit 2
ML17305A863
Person / Time
Site: Palo Verde Arizona Public Service icon.png
Issue date: 03/31/1990
From: Porter K
ARIZONA PUBLIC SERVICE CO. (FORMERLY ARIZONA NUCLEAR
To:
Shared Package
ML17305A861 List:
References
NUDOCS 9006050340
Download: ML17305A863 (2)


Text

~~ AMENDED ~~

NRC MONTHLY OPERATING REPORT DOCKET NO. 50-529 DATE COMPLETED BY K F Porter OPERATING STATUS 1.

2.

3.

4.

Unit Name:

II" Palo Verde Nuclear Generatin Licensed Thermal Power (MWt): 3800 Nameplate Rating (Gross MWe): ~140 Station Unit 2

5. Design Electrical Rating (Net MWe): ~12 0
6. Maximum Dependable Capacity (Gross MWe): 1303
7. Maximum Dependable Capacity (Net MWe): 1221
8. If Changes Occur In Capacity Ratings (Item Numbers 3 Through 7)

Since Last Report, Give Reasons: N A

9. Power Level to Which Restricted, If Any (Net MWe): one
10. Reasons For Restrictions, If Any: N A This Month Yr.-to-Date Cumulative ll 12 Hours in Reporting Period Number of Hours Reactor 44 2 160 30 960 Was Critical 0 0 1 295 0 20 546 1
13. Reactor Reserve Shutdown Hours 0 0 0 0 0 0
14. Hours Generator On-Line 0 0 1 295 0 20 042 2
15. Unit Reserve Shutdown Hours 0 0 0 0 0 0
16. Gross Thermal Energy Generated (MWH) 0 3 499 053 17 Gross Electrical Energy Generated (MWH) 0 1 712 500 25 682 370
18. Net Electrical Energy Generated (MWH) 0 1 614 008 23 996 820 I
19. Unit Service Factor 45.0a 63.3a
20. Unit Availability Factor 63.3a
21. Unit Capacity Factor (Using MDC Net) 61.2a 63 5a 22 Unit Capacity Factor (Using DER Net) 61 0%
23. Unit Forced Outage Rate 9 9a
24. Shutdowns Scheduled Over Next 6 Months (Type, Date and Duration of Each):

N A

25. If Shutdown At End of Report Period, Estimated Date of Start-up:

June 09 1990 Forecast Achieved INITIAL CRITICALITY ~03 86 ~04 18 86 INITIAL ELECTRICITY 06 86 05 20 86 COMMERCIAL OPERATION ~11 86 09 19 86 9006050340 900531 6-PDR ADOCK 05000529 R PDC