ML17313A181
| ML17313A181 | |
| Person / Time | |
|---|---|
| Site: | Palo Verde |
| Issue date: | 12/31/1997 |
| From: | Fulton J ARIZONA PUBLIC SERVICE CO. (FORMERLY ARIZONA NUCLEAR |
| To: | |
| Shared Package | |
| ML17313A180 | List: |
| References | |
| NUDOCS 9801220042 | |
| Download: ML17313A181 (3) | |
Text
NRC MONTHLYOPERATING DATAREPORT DOCKET NO.:
UNIT NAME:
DATE:
COMPLETED BY:
TELEPHONE:
50-528 I
PVNGS-1 1/14/98 J. D. Fulton 602 250-3549 Reporting Period:
December 1997 1.
Design Electrical Rating (Net MWe):
1265 2.
Maximum Dependable Capacity (Net MWe):
1243 Unit 1 Generatin Statistics 3.
Hours Reactor was Critical 4.
Hours Generator was On-Line 5.
Unit Reserve Shutdown Hours 6.
Net Electrical Ener Generated MWh UNITSHUTDOWNS This Month 744.0 744.0 0.0 934,524 Yr.,to Date 8,671.1 8,658.6 0.0 10,737,706 Cumulative 73,996.3 72,811.1 0.0 86,203,268 Outage Duration No.
Date Type~
Hours Reason~
Method of Shutting Down Reactor3 Cause and Corrective Action to Prevent Occurrence No reactor shutdowns occurred during the month of December 1997.
F-Forced S-Scheduled
SUMMARY
2Reason:
A-Equipment Failure (Explain)
B-Maintenance or Test C-Refueling D-Regulatory Restriction E-Operator Training / License Examination F-Administrative 6-Operational Error (Explain)
H-Other (Explain) 3Method:
1-Manual 2-Manual Trip/ Scram 3-Automatic Trip/ Scram 4-Continuation 5-Other-(Explain) 980i220042 980ii4 PDR AOQCK 05000528 R
e NRC MONTHLYOPERATING DATAREPORT DOCKET NO.:
UNIT NAME:
DATE:
COMPLETED BY:
TELEPHONE:
50-529 I
PVNGS-2 1/1 4/98 J. D. Fulton 602 250-3549 Reporting Period:
December 1997 1.
Design Electrical Rating (Net MWe):
1265 2.
Maximum Dependable Capacity(NetMWe):
1243 Unit 2 Generatin Statistics 3.
Hours Reactor was Critical 4.
Hours Generator was On-Line 5.
Unit Reserve Shutdown Hours 6.
Net Electrical Ener Generated MWh UNITSHUTDOWNS This Month 744.0 744.0 0.0 948,014 Yr. to Date 7,692.0 7,661.9 0.0 9,322,667 Cumulative 73,425.7 72,232.8 0.0 86,429,559 Outage Method of Duration Shutting Down No.
Date Type~
Hours Reasons Reactor3 No reactor shutdowns occurred during the month of December 1997.
Cause and Corrective Action to Prevent Occurrence F-Forced S-Scheduled
SUMMARY
2Reason:
A-Equipment Failure (Explain)
B-Maintenance or Test C-Refueling D-Regulatory Restriction E-Operator Training /License Examination F-Administrative G-Operational Error (Explain)
H-Other (Explain) sMethod:
1-Manual 2-Manual Trip/ Scram 3-Automatic Trip/ Scram 4-Continuation 5-Other-(Explain) t t
NRC MONTHLYOPERATING DATAREPORT DOCKET NO.:
UNIT NAME:
DATE:
COMPLETED BY:
TELEPHONE:
50-530 PVNGS-3 1/14/98 J. D. Fulton 602 250-3549 Reporting Period:
December 1997 1.
Design Electrical Rating (Net MWe):
1269 2.
Maximum Dependable Capacity(Net MWe):
1247 Unit 3 Generatin Statistics Hours Reactor was Critical Hours Generator was On-Line Unit Reserve Shutdown Hours Net Electrical Ener Generated MWh UNIT SHUTDOWNS This Month 744.0 744.0 0.0 933,789 Yr. to Date 7,868.9 7,822.1 0.0 9,453,826 Cumulative 69,325.7 68,499.6 0.0 82,752,971 Outage Method of Duration Shutting Down No.
Date Types'ours Reason~
Reactors No reactor shutdowns occurred during the month of December 1997.
Cause and Corrective Action to Prevent Occurrence F-Forced S-Scheduled
SUMMARY
~Reason:
A-Equipment Failure (Explain)
B-Maintenance or Test C-Refueling D-Regulatory Restriction E-Operator Training / License Examination F-Administrative 6-Operational Error (Explain)
H-Other (Explain) s Method:
1-Manual 2-Manual Trip/ Scram 3-Automatic Trip/ Scram 4-Continuation 5-Other-(Explain)