ML17313A346

From kanterella
Jump to navigation Jump to search
Monthly Operating Repts for Mar 1998 for PVNGS Units 1,2 & 3.W/980408 Ltr
ML17313A346
Person / Time
Site: Palo Verde  Arizona Public Service icon.png
Issue date: 03/31/1998
From: Fulton J, Overbeck G
ARIZONA PUBLIC SERVICE CO. (FORMERLY ARIZONA NUCLEAR
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
035-00501-GRO-J, 35-501-GRO-J, NUDOCS 9804170140
Download: ML17313A346 (9)


Text

CATEGORY 1 REGULAR RY INFORMATION DISTRIBUTI SYSTEM (RIDS)

ACCESSION NBR:9804170140 DOC.DATE: 98/03/31 NOTARIZED: NO DOCKET FACIL:STN-50-528 Palo Verde Nuclear Station, Unit 1, Arizona Publi 05000528 STN-50-529 Palo Verde Nuclear Station, Unit 2, Arizona Publi 05000529 STN-50-530 Palo Verde Nuclear Station, Unit 3, Arizona Publi 05000530 AUTH. NAME AUTHOR AFFILIATION FULTON,J.D. Arizona Public Service Co. (formerly Arizona Nuclear Power OVERBECK,G.R. Arizona Public Service Co. (formerly Arizona Nuclear Power RECIP.NAME RECIPIENT AFFILIATION SUB JECT: Mo o crating repts for Mar 1998 for PVNGS Units 1,2

.W/980408 ltr. &:

DISTRIBUTION CODE: IE24D COPIES RECEIVED:LTR ENCL SIZE:

TITLE: Monthly Operating Report (per Tech Specs) E NOTES: STANDARDIZED PLANT .- 05000528@

Standardized plant. 05000529 Standardized plant. 05000530 p RECIPIENT COPIES RECIPIENT COPIES ID CODE/NAME LTTR ENCL ID CODE/NAME LTTR ENCL PD4-2 PD 1 1 FIELDS,M 1 1 INTERNAL: ACRS 1 1 AEOD/SPD/RRAB 1 1 E CEN 1 1 OC/DBA/PAD 1 1 1 1 EZTERNAL: LITCO BRYCE,J H 1 1 NOAC 1 1 D NRC PDR 1 1 E

N NOTE TO ALL "RIDS" RECIPIENTS:

PLEASE HELP US TO REDUCE WASTE. TO HAVE YOUR NAME OR ORGANIZATION REMOVED FROM DISTRIBUTION LISTS OR REDUCE THE NUMBER OF COPIES RECEIVED BY YOU OR YOUR ORGANIZATION, CONTACT THE DOCUMENT CONTROL DESK (DCD) ON EXTENSION 415-2083 TOTAL NUMBER OF COPIES REQUIRED: LTTR 10 ENCL 10

%~

4 1

t I

t

Commitment. lanovAlaa &eryy.

Gregg R. Overbeck Mail Station 7602 Palo Verde Nuclear Vice President TEL 602/393-51 48 P.O. Box 52034 Generating Station Nuclear Production FAX 602/3936077 Phoenix, AZ 85072-2034 035-00501-6RO/JDF April 8, 1998 U. S. Nuclear Regulatory Commission ATTN: Document Control Desk Mail Station P1-37 Washington, DC 20555

Dear Sirs:

Subject:

Palo Verde Nuclear Generating Station (PVNGS)

Units 1, 2, and 3 Docket Nos. STN 50-528/529/530 Monthly Operating Reports for MARCH 1998 Enclosed, are. the Monthly Operating Reports, for March 1998, prepared and submitted pursuant,to Specification 6.9.1.6 of Appendix A (Technical Specifications) to the PVNGS Units 1, 2, and 3 Operating Licenses.-

By copy of this letter, Arizona Public Service Company is also fo'rwarding the Monthly Operating Reports to the Regional Administrator, NRC Region IV.

If you have any questions, please contact Judy Fulton at (602) 250-3549.

Sincerely, G RO/JDF/gy

Enclosures:

MARCH 1998 Monthly Operating Reports cc: E. W. Merschoff 'all w/enclosures)

K. E. Perkins INPO Records Center Utility Data Institute

<Ip(,'/jg 98041 7O140 980331 PDR ADQCK 05000528 R PDR

t I,IV lt ~

j I

H SI gfhSS I

I

NRC MONTHLYOPERATING DATA REPORT DOCKET NO.: 50-528 UNIT NAME: PVNGS-1 DATE: 4/08/98 COMPLETED BY: J. D. Fulton TELEPHONE: 602 250-3549 Reporting Period: March 1998

1. Design Electrical Rating (Net MWe): 1265
2. Maximum Dependable Capacity(NetMWe): 1243 t

Uriit 1:Generating Statistics This Month Yr. to', Date Cumulative

-Hours Reactor was Critical 312.1 1,698.9 '5,695.2 Hours Generator- was-On-Line 312.1 1,669.4 74,480.5 Unit Reserve Shutdown Hours 0.0 0.0 0.0

-Net-Electrical-Energy Generated (MWh) 384,888 2,043,120 88,246,388 UNIT SHUTDOWNS Outage Method of Duration Shutting Down Cause and Corrective Action No. Date Type" Hours Reason2 ReactoR to Prevent Occurrence 98-02 3/14/98 S 431.9 C RX manually tripped to begin seventh refueling outage.

"F-Forced 2Reason: 3Method:

S-Scheduled A-Equipment Failure (Explain) 1-Manual B-Maintenance or Test 2-Manual Trip / Scram C-Refueling 3-Automatic Trip / Scram D-Regulatory Restriction 4-Continuation E-Operator Training / License Examination 5-Other-(Explain)

F-Administrative G-Operational Error (Explain)

H-Other (Explain)

SUMMARY

J S

k h

t NRC MONTHLYOPERATING DATA REPORT t

DOCKET NO.: 50-529 UNIT NAME: PVNGS-2 DATE: 4/08/98 COMPLETED BY: J. D. Fulton TELEPHONE: 602 250-3549 Reporting Period: March 1998

1. Design Electrical Rating (Net MWe): 1265
2. Maximum Dependable Capacity(Net MWe): 1243 Unit 2 Generating Statistics This Month Yr. to Date Cumulative
3. Hours Reactor was Critical 744.0 2,160.0 75,585.7
4. Hours Generator was On-Line 744.0 2,160.0 74,392.8
5. Unit Reserve Shutdown Hours 0.0 0.0 0.0
6. Net Electrical Energy Generated (MWh) 946,142 2,747,410 89,176,969 UNIT SHUTDOWNS Outage Method of Duration Shutting Down Cause and Corrective Action No. Date Type" Hours Reason> Reactors to Prevent Occurrence No reactor shutdowns occurred during the month of March 1998.

~

F-Forced 2Reason: sMethod:

S-Scheduled A-Equipment Failure (Explain) 1-Manual B-Maintenance or Test 2-Manual Trip / Scram C-Refueling 3-Automatic Trip / Scram D-Regulatory Restriction 4-Continuation E-Operator Training / License Examination 5-Other-(Explain)

F-Administrative G-Operational Error (Explain)

H-Other (Explain)

SUMMARY

NRC MONTHLYOPERATING DATA REPORT DOCKET NO.: 50-530 UNIT NAME: PVNGS-3 DATE: 4/08/98 COMPLETED BY J. D. Fulton TELEPHONE:

Reporting Period: March 1998

1. Design Electrical Rating (Net MWe): 1269
2. Maximum Dependable Capacity (Net MWe): 1247 Unit 3 Generating Statistics This Month Yr. to Date Cumulative Hours Reactor was Critical 744.0 2,160.0 71,485.7 Hours Generator was On-Line 744.0 2,160.0 70,659.6 Unit Reserve Shutdown Hours 0.0 0.0 0.0 Net Electrical Energy Generated (MWh) 926,784 2,697,745 85,450,716 UNIT SHUTDOWNS Outage Method of Duration Shutting Down Cause and Corrective Action No. Date Type" Hours Reason2 ReactoR to Prevent Occurrence No reactor shutdowns occurred during the month of March 1998.

"F-Forced 2Reason: sMethod:

S-Scheduled A-Equipment Failure (Explain) 1-Manual B-Maintenance or Test 2-Manual Trip / Scram C-Refueling 3-Automatic Trip / Scram D-Regulatory Restriction 4-Continuation E-Operator Training / License Examination 5-Other-(Explain)

F-Administrative G-Operational Error (Explain)

H-Other (Explain)

SUMMARY

r

,I II II