ML17311A712

From kanterella
Jump to navigation Jump to search
Revised Monthly Operating Rept for Nov 1994 for Palo Verde Nuclear Plant Unit 3
ML17311A712
Person / Time
Site: Palo Verde  Arizona Public Service icon.png
Issue date: 11/30/1994
From: Ecklund B
ARIZONA PUBLIC SERVICE CO. (FORMERLY ARIZONA NUCLEAR
To:
Shared Package
ML17311A708 List:
References
NUDOCS 9503170050
Download: ML17311A712 (4)


Text

ENCLOSURE 2 REVISED PAGE FOR THE NOVEMBER 1994 MONTHLYOPERATING REPORTS p cy50510 ADOCK 05000528 PDR PD R

~

~

v ~ Jt

SUMMARY

OF OPERATING EXPERIENCE FOR THE MONTH DOCKET NO. 50-530 UNIT NAME PVNGS-3 DATE 03/10/95 COMPLETED BY B. S. Eckiu TELEPHONE ~602 393-6 November 1994 11/01 0000 Unit began the month in Mode 1, 100% Rx power.

11/24 0012 Performed a 1% power reduction to 99% as required to perform HI Rate Steam Generator Blow Down.

11/24 0023 Power is 99%.

11.24 0112 Commenced power ascension to 100%.

11/24 0137 Rx power is at 100%.

11/25 1956 Commenced power reduction for Steam Generator mid-cycle outage.

11/26 0043 Manually tripped the reactor. Entered Mode 3.

11/26 1500 Enetered Mode 4.

11/26 2131 Entered Mode 5.

11/30 2400 Ended Month in Mode 5, mid-cycle outage.

d gl t