ML17311A947
| ML17311A947 | |
| Person / Time | |
|---|---|
| Site: | Palo Verde |
| Issue date: | 04/30/1995 |
| From: | ARIZONA PUBLIC SERVICE CO. (FORMERLY ARIZONA NUCLEAR |
| To: | |
| Shared Package | |
| ML17311A945 | List: |
| References | |
| NUDOCS 9506160353 | |
| Download: ML17311A947 (4) | |
Text
ENCLOSURE 2 REVISED PAGE FOR THE APRIL 1995 MONTHLYOPERATING REPORTS 950bib0353 950b08 PDR 4DOCK 05000528(
R PDR
4 0
A 17
SHUTDOWNS AND POWER REDUCTIONS April 1995 DOCKET NO UNITNAME
~V95='I.
DATE Q555lK COMPLETED BY
~DUHQIl aullaa21 Date Outage Method of Duration Shutting Down Type" Hours Reason2 Reactor3 LER No.
System Component Cause and Corrective Action Code4 Code5 to Prevent Occurrence 95-01 04/01/95 S
719.9 N/A N/A N/A Rx manually tripped to begin the 5th refueling outage.
"F-Forced S-Scheduled 2R A-Equipment Failure(Explain)
B-Maintenance or Test C-Refueling D-Regulatory Restriction E-Operator Training 8 License Examination F-Administrative G-Operational Error H-Other (Explain) 3Method:
1-Manual 2-Manual Scram 3-Automatic Scram 4-Continuation from Previous Month 5-Reduction of 20% or Greater in the Past 24 Hours 9-Other-(Explain) 4Exhibit F - Instructions for Preparation of the Data Entry Sheets for Licensee Event Report (LER) File (NUREG 0161)
Exhibit H-Same Source