NRC MONTHLY OPERATING REPORT
~~ AMENDED~~
DOCKET NO.
50-529 DATE COMPLETED BY K F Porter OPERATING STATUS 1.
2.
3.
4.
5.
6.
7.
8.
9.
10 Unit Name:
Palo Verde Nuclear Generatin Station Unit 2 Reporting Period:
ebrua 1990 Licensed Thermal Power (MWt):
3800 Nameplate Rating (Gross MWe):
1403 Design Electrical Rating (Net MWe):
~12 0 Maximum Dependable Capacity (Gross MWe): 1303 Maximum Dependable Capacity (Net MWe):
1221 If Changes Occur In Capaci.ty Ratings (Item Numbers 3 Through 7)
Since Last Report, Give Reasons:
N A Power Level to Which Restricted, If Any (Net MWe):
None Reasons For Restrictions, If Any:
A 11.
12.
13.
14.
15.
16.
17.
18.
19.
20.
21.
Hours in Reporting Period Number of Hours Reactor Was Critical Reactor Reserve Shutdown Hours Hours Generator On-Line Unit Reserve Shutdown Hours Gross Thermal Energy Generated (MWH)
Gross Electrical Energy Generated (MWH)
Net Electrical Energy Generated (MWH)
Unit Service Factor Unit Availability Factor Unit Capacity Factor This Month 6
2 551 0
0 0 551 0
0 0 2 064 631 26 800 683 616 Yr.-to-Date 1 416 1 295 0
0 0 1 295 0
0 0 480 00 1
12 500 1 614 008 Cumulative 30 216 20 546 1
0 0 0 042 2
0 0 3 499 053 23 996 820 I
66 3s 66 3
22
'3.
24.
(Using MDC Net)
Unit Capacity Factor (Using DER Net)
Unit Forced Outage Rate 83 3
80 1
0 0 93 4 89 8
0 0 Shutdowns Scheduled Over Next 6 Months (Type, Date and Duration of Each):
N A 65 0%
62 5
9 9
- 25. If Shutdown At End of Report Period, Estimated Date of Start-up:
Ma 31 1990 INITIALCRITICALITY INITIALELECTRICITY COMMERCIAL OPERATION Forecast
~03 86
~06 86
~11 86 Achieved
~04 18 86 05 20 86 09 19 86 9006050337 9005$ i PDR ADOCK 05000529 R 'DC 6