Category:MONTHLY OPERATING ANALYSIS REPORT
MONTHYEARML17300B3811999-09-30030 September 1999 Monthly Operating Repts for Sept 1999 for Pvngs,Units 1,2 & 3.With 991007 Ltr ML17300B3271999-08-31031 August 1999 Monthly Operating Rept for Aug 1999 for Pvngs,Units 1,2 & 3 ML17313B0611999-07-31031 July 1999 Monthly Operating Repts for July 1999 for Pvngs,Units 1,2 & 3.With 990810 Ltr ML17300B3151999-06-30030 June 1999 Monthly Operating Repts for June 1999 for Pvngs,Units 1,2 & 3.With ML17313A9731999-05-31031 May 1999 Monthly Operating Repts for May 1999 for Pvngs,Units 1,2 & 3.With ML17313A9201999-04-30030 April 1999 Monthly Operating Repts for Apr 1999 for Pvngs,Units 1,2 & 3.With ML17313A8801999-03-31031 March 1999 Monthly Operating Repts for Mar 1999 for Pvngs,Units 1,2 & 3.With 990412 Ltr ML17313A8501999-02-28028 February 1999 Monthly Operating Repts for Feb 1999 for Palo Verde Nuclear Generating Station.With 990311 Ltr ML17313A8061999-01-31031 January 1999 Monthly Operating Repts for Jan 1999 for Pvngs,Units 1,2 & 3.With ML17313A7381998-12-31031 December 1998 Monthly Operating Repts for Dec 1998 for Palo Verde Nuclear Generating Station,Units 1,2 & 3.With 990113 Ltr ML17313A7031998-11-30030 November 1998 Monthly Operating Repts for Nov 1998 for Pvngs,Unit 1,2 & 3. with 981209 Ltr ML17313A6741998-10-31031 October 1998 Monthly Operating Repts for Oct 1998 for Pvngs,Units 1,2 & 3.With ML17313A6561998-09-30030 September 1998 Monthly Operating Rept for Sept 1998 for PVNGS Units 1,2 & 3.With 981007 Ltr ML17313A5301998-07-31031 July 1998 Monthly Operating Repts for July 1998 for Pvgns,Units 1,2 & 3.W/980812 Ltr ML17313A5001998-06-30030 June 1998 Monthly Operating Repts for June 1998 for Palo Verde Nuclear Generating Station,Units 1,2 & 3.W/980710 Ltr ML17313A4211998-05-31031 May 1998 Monthly Operating Repts for May 1998 for Pvngs,Units 1,2 & 3 ML17313A3691998-04-30030 April 1998 Monthly Operating Repts for Apr 1998 for PVNGS ML17313A3461998-03-31031 March 1998 Monthly Operating Repts for Mar 1998 for PVNGS Units 1,2 & 3.W/980408 Ltr ML17313A2521998-02-28028 February 1998 Monthly Operating Repts for Feb 1998 for Palo Verde Nuclear Generating Station,Units 1,2 & 3.W/980311 Ltr ML17313A2061998-01-31031 January 1998 Monthly Operating Repts for Jan 1998 for Palo Verde Nuclear Generating Station,Unit 1,2 & 3.W/980210 Ltr ML17313A1811997-12-31031 December 1997 Monthly Operating Repts for Dec 1997 for Palo Verde Nuclear Generating Station,Units 1,2 & 3 ML17313A1351997-11-30030 November 1997 Monthly Operating Repts for Nov 1997 for Palo Verde Nuclear Generating Station,Units 1,2 & 3 ML17313A1821997-11-30030 November 1997 Revised Monthly Operating Rept for Nov 1997 for Palo Verde Nuclear Generating Station,Unit 3 ML17312B7521997-10-31031 October 1997 Monthly Operating Repts for Oct 1997 for Palo Verde Nuclear Generating Station,Units 1,2 & 3.W/971112 Ltr ML17312B6641997-08-31031 August 1997 Monthly Operating Repts for Aug 1997 for Pvngs,Units 1,2 & 3 ML17313B0621997-07-31031 July 1997 Monthly Operating Repts for July 1997 for Pvngs,Units 1,2 & 3.With 970812 Ltr ML17312B1741996-12-31031 December 1996 Monthly Operating Repts for Dec 1996 for Pvngs,Units 1,2 & 3.W/970109 Ltr ML17312A9981996-09-30030 September 1996 Monthly Operating Repts for Sept 1996 for PVNGS Unit 1,2 & 3 ML17312A9681996-08-31031 August 1996 Monthly Operating Repts for Aug 1996 for Palo Verde Nuclear Generating Station Units 1,2 & 3.W/960911 Ltr ML17312A9181996-07-31031 July 1996 Monthly Operating Repts for July 1996 for Pvngs,Units 1,2 & 3 ML17312A9191996-04-30030 April 1996 Rev to MOR for Apr 1996 for PVNGS Unit 1 ML17312A6881996-03-31031 March 1996 Monthly Operating Repts for Mar 1996 for PVNGS.W/960411 Ltr ML17312B0001996-03-31031 March 1996 Revised Monthly Operating Rept for Mar 1996 for Palo Verde Nuclear Generating Station,Unit 2 ML17312A5371996-01-31031 January 1996 Monthly Operating Rept for Jan 1996 for PVNGS Units 1,2 & 3 ML17311B3121995-11-30030 November 1995 Monthly Operating Repts for Nov 1995 for PVNGS Units 1,2 & 3 ML17311B2681995-10-31031 October 1995 Monthly Operating Repts for Oct 1995 for Palo Verde Nuclear Generating Station.W/951108 Ltr ML17311B2221995-09-30030 September 1995 Monthly Operating Repts for Sept 1995 for Palo Verde Nuclear Generating Station ML17311B1821995-08-31031 August 1995 Monthly Operating Repts for Aug 1995 for Palo Verde Nuclear Generating Station.W/950913 Ltr ML17311B0441995-06-30030 June 1995 Monthly Operating Repts for June 1995 for PVNGS Unit 1,2 & 3 ML17311B0451995-05-31031 May 1995 Revised Page 6 to Monthly Operating Rept for May 1995 for PVNGS Unit 2 ML17311A9471995-04-30030 April 1995 Revised Monthly Operating Rept for Apr 1995 for PVNGS ML17311A8721995-04-30030 April 1995 Monthly Operating Repts for Apr 1995 for PVNGS Units 1-3. W/950509 Ltr ML17311A8061995-03-31031 March 1995 Monthly Operating Repts for Mar 1995 for Palo Verde Nuclear Generating Station ML17311A7101995-02-28028 February 1995 Monthly Operating Repts for Feb 1995 for Palo Verde Nuclear Generating Station ML17311A6601995-01-31031 January 1995 Monthly Operating Repts for Jan 1995 for Palo Verde Nuclear Generating Station.W/950210 Ltr ML17311A7121994-11-30030 November 1994 Revised Monthly Operating Rept for Nov 1994 for Palo Verde Nuclear Plant Unit 3 ML17311A2691994-08-31031 August 1994 Monthly Operating Repts for Aug 1994 for Palo Verde Nuclear Generating Station ML17310B2811994-04-30030 April 1994 Monthly Operating Repts for Apr 1993 for Palo Verde Nuclear Generating Station.W/940513 Ltr ML17310B2161994-03-31031 March 1994 Monthly Operating Repts for Mar 1994 for PVNGS Units 1,2 & 3 ML17310B1001994-02-28028 February 1994 Monthly Operating Repts for Feb 1994 for Palo Verde Nuclear Generating Station Units 1,2 & 3.W/940314 Ltr 1999-09-30
[Table view] Category:TEXT-SAFETY REPORT
MONTHYEARML17300B3811999-09-30030 September 1999 Monthly Operating Repts for Sept 1999 for Pvngs,Units 1,2 & 3.With 991007 Ltr ML17300B3271999-08-31031 August 1999 Monthly Operating Rept for Aug 1999 for Pvngs,Units 1,2 & 3 05000528/LER-1999-002-01, :on 990730,test Mode Trip Bypass for EDG Output Breakers Not Surveilled.Cause Under Investigation.Operations Personnel Conservatively Invoked SR 3.0.3 for SR 3.8.1.13. with1999-08-27027 August 1999
- on 990730,test Mode Trip Bypass for EDG Output Breakers Not Surveilled.Cause Under Investigation.Operations Personnel Conservatively Invoked SR 3.0.3 for SR 3.8.1.13. with
05000528/LER-1996-009, :on 961027,identified That TS Violation May Have Occurred Due to Missed Surveillance Test.Caused by Personnel Error.Setpoint for Limit Switches for Valve 1SIAUV647 Corrected to Achieve 1-inch Stroke Length1999-08-18018 August 1999
- on 961027,identified That TS Violation May Have Occurred Due to Missed Surveillance Test.Caused by Personnel Error.Setpoint for Limit Switches for Valve 1SIAUV647 Corrected to Achieve 1-inch Stroke Length
ML17313B0611999-07-31031 July 1999 Monthly Operating Repts for July 1999 for Pvngs,Units 1,2 & 3.With 990810 Ltr ML17313B0191999-07-16016 July 1999 LER 99-005-00:on 990618,RT on Low DNBR Was Noted.Caused by Hardware Induced Calculation Error.Cr Operator Was Taken to Place Reactor in Stable Condition IAW Appropriate Operating Procedure 05000529/LER-1999-005, :on 990618,RT on Low DNBR Was Noted.Caused by Hardware Induced Calculation Error.Cr Operator Was Taken to Place Reactor in Stable Condition IAW Appropriate Operating Procedure1999-07-16016 July 1999
- on 990618,RT on Low DNBR Was Noted.Caused by Hardware Induced Calculation Error.Cr Operator Was Taken to Place Reactor in Stable Condition IAW Appropriate Operating Procedure
ML17300B2991999-07-0808 July 1999 SER Accepting Exemption from Updated Final Safety Analysis Report for Plant,Units 1,2 & 3 ML17300B3151999-06-30030 June 1999 Monthly Operating Repts for June 1999 for Pvngs,Units 1,2 & 3.With ML17313A9921999-06-21021 June 1999 Special Rept:On 990525,RMS mini-computer Was Removed from Service to Implement Yr 2000 Mod & Was OOS Longer than 72 H Allowed.Caused by Planned Y2K Mods.Preplanned Alternate Sampling Program Was Initiated ML17313A9911999-06-18018 June 1999 Special Rept:On 990510,loose-part Detection Sys Channel 2 Was Declared Inoperable.Caused by Malfunction of Mineral Cable Connector to Accelerometer.Licensee Will Implement Modifications Which Will Enhance loose-part Detection Sys ML17313A9731999-05-31031 May 1999 Monthly Operating Repts for May 1999 for Pvngs,Units 1,2 & 3.With 05000529/LER-1999-004, :on 990408,PSV Lift Pressures Were Outside of TS Limits.Caused by Lift Pressure Setpoint Drift.Psvs Have Been Tested,Disassembled,Inspected,Reassembled & Certified at Wyle Labs1999-05-0707 May 1999
- on 990408,PSV Lift Pressures Were Outside of TS Limits.Caused by Lift Pressure Setpoint Drift.Psvs Have Been Tested,Disassembled,Inspected,Reassembled & Certified at Wyle Labs
ML17313A9201999-04-30030 April 1999 Monthly Operating Repts for Apr 1999 for Pvngs,Units 1,2 & 3.With ML17313A9001999-04-26026 April 1999 SER Accepting Licensee Proposed Relief Requests 11 & 12 for Second 10-year Inservice Insp Interval for Palo Verde Nuclear Generating Station,Units 1,2 & 3 05000528/LER-1999-003, :on 990317,required Surveillance Requirement Not Completed Due to Deficient Procedure,Was Determined. Caused by Cognitive Personnel Error.St Procedures Revised to Require Chiller to Be Operating & Oil Temperature Checked1999-04-14014 April 1999
- on 990317,required Surveillance Requirement Not Completed Due to Deficient Procedure,Was Determined. Caused by Cognitive Personnel Error.St Procedures Revised to Require Chiller to Be Operating & Oil Temperature Checked
ML17313A8951999-04-14014 April 1999 LER 99-003-00:on 990317,required Surveillance Requirement Not Completed Due to Deficient Procedure,Was Determined. Caused by Cognitive Personnel Error.St Procedures Revised to Require Chiller to Be Operating & Oil Temperature Checked ML17313A8921999-04-13013 April 1999 LER 98-003-01:on 980902,discovered That MSSV as-found Lift Pressures Were Outside TS Limits.Caused by Bonding of Valve Disc to Nozzle Seat.Affected Valves Were Adjusted,Retested & Returned to Svc 05000530/LER-1998-003-02, :on 980902,discovered That MSSV as-found Lift Pressures Were Outside TS Limits.Caused by Bonding of Valve Disc to Nozzle Seat.Affected Valves Were Adjusted,Retested & Returned to Svc1999-04-13013 April 1999
- on 980902,discovered That MSSV as-found Lift Pressures Were Outside TS Limits.Caused by Bonding of Valve Disc to Nozzle Seat.Affected Valves Were Adjusted,Retested & Returned to Svc
ML17313A8891999-04-0909 April 1999 LER 99-001-00:on 990310,RT on High Pressurizer Pressure Was Noted.Caused by Loss of Heat Removal.Cr Supervisor Was Removed from Shift Duties for Diagnostics Skills Training. with 990409 Ltr 05000528/LER-1999-001-02, :on 990310,RT on High Pressurizer Pressure Was Noted.Caused by Loss of Heat Removal.Cr Supervisor Was Removed from Shift Duties for Diagnostics Skills Training. with1999-04-0909 April 1999
- on 990310,RT on High Pressurizer Pressure Was Noted.Caused by Loss of Heat Removal.Cr Supervisor Was Removed from Shift Duties for Diagnostics Skills Training. with
ML17300B3071999-03-31031 March 1999 Seismic Portion of Submittal-Only Screening Review of Palo Verde Nuclear Generating Station Units Ipeee ML17313A8801999-03-31031 March 1999 Monthly Operating Repts for Mar 1999 for Pvngs,Units 1,2 & 3.With 990412 Ltr ML20207M9231999-03-12012 March 1999 Amended Part 21 Rept Re Cooper-Bessemer Ksv EDG Power Piston Failure.Total of 198 or More Pistons Have Been Measured at Seven Different Sites.All Potentially Defective Pistons Have Been Removed from Svc Based on Encl Results ML20207H7471999-03-10010 March 1999 1999 Emergency Preparedness Exercise 99-E-AEV-03003 ML17313A8441999-03-0808 March 1999 Safety Evaluation Accepting Licensee Proposed Alternative to Replacement Requirements of Section III of ASME Code 05000529/LER-1999-001-01, :on 990103,TS Violation for Power Dependent Insertion Limit Alarm Being Inoperable.Caused by Personnel Error.Revised Procedure to Clarify How Computer Point Is to Be Returned to Scan Mode.With1999-03-0101 March 1999
- on 990103,TS Violation for Power Dependent Insertion Limit Alarm Being Inoperable.Caused by Personnel Error.Revised Procedure to Clarify How Computer Point Is to Be Returned to Scan Mode.With
ML17313A8361999-03-0101 March 1999 LER 99-001-00:on 990103,TS Violation for Power Dependent Insertion Limit Alarm Being Inoperable.Caused by Personnel Error.Revised Procedure to Clarify How Computer Point Is to Be Returned to Scan Mode.With 990302 Ltr ML17313A8501999-02-28028 February 1999 Monthly Operating Repts for Feb 1999 for Palo Verde Nuclear Generating Station.With 990311 Ltr ML17313A7791999-02-0505 February 1999 Safety Evaluation Accepting Licensee Rev to Emergency Plan That Would Result in Two Less Radiation Protection Positions Immediatelu Available During Emergencies ML17313A7951999-02-0404 February 1999 Safety Evaluation Accepting Licensing Actions Associated with GL 92-08, Thermo-Lag 330-1 Fire Barriers ML17313A8061999-01-31031 January 1999 Monthly Operating Repts for Jan 1999 for Pvngs,Units 1,2 & 3.With ML17313A7701999-01-15015 January 1999 LER 96-008-00:on 960507,inadequate Procedure Results in Nuclear Power Channels Not Calibrated During Power Ascension Tests Occurred.Caused by Deficient Procedure.Procedure Revised 05000528/LER-1996-008, :on 960507,inadequate Procedure Results in Nuclear Power Channels Not Calibrated During Power Ascension Tests Occurred.Caused by Deficient Procedure.Procedure Revised1999-01-15015 January 1999
- on 960507,inadequate Procedure Results in Nuclear Power Channels Not Calibrated During Power Ascension Tests Occurred.Caused by Deficient Procedure.Procedure Revised
ML17313A7381998-12-31031 December 1998 Monthly Operating Repts for Dec 1998 for Palo Verde Nuclear Generating Station,Units 1,2 & 3.With 990113 Ltr ML20206H2101998-12-31031 December 1998 SCE 1998 Annual Rept ML17313A7251998-12-23023 December 1998 Safety Evaluation Supporting Amends 119 & 119 to Licenses NPF-41 & NPF-51,respectively ML17313A7031998-11-30030 November 1998 Monthly Operating Repts for Nov 1998 for Pvngs,Unit 1,2 & 3. with 981209 Ltr ML17313A6911998-11-25025 November 1998 Corrected Safety Evaluation Pp 13 & 50 to Plant Units 1,2 & 3,respectively.Change to Pp 13 Corrects Discussion in Paragraph L2.Change in Pp 50 Corrects Discussion Under ITS 3.5.2 ML17313A6701998-11-0404 November 1998 Rev 2 to PVNGS Unit 2 Colr ML17313A6741998-10-31031 October 1998 Monthly Operating Repts for Oct 1998 for Pvngs,Units 1,2 & 3.With 05000528/LER-1998-008, :on 980729,EQ of Electrical Connectors Were Not Adequately Demonstrated.Caused Because Test Was Conducted with Only Single Lv Connector & Without Fully Ranged Inputs. Revised EQ Requirements1998-10-24024 October 1998
- on 980729,EQ of Electrical Connectors Were Not Adequately Demonstrated.Caused Because Test Was Conducted with Only Single Lv Connector & Without Fully Ranged Inputs. Revised EQ Requirements
ML17313A6611998-10-24024 October 1998 LER 98-008-00:on 980729,EQ of Electrical Connectors Were Not Adequately Demonstrated.Caused Because Test Was Conducted with Only Single Lv Connector & Without Fully Ranged Inputs. Revised EQ Requirements ML20154N2751998-10-19019 October 1998 Safety Evaluation Supporting Amend 119 to License NPF-74 ML17313A6561998-09-30030 September 1998 Monthly Operating Rept for Sept 1998 for PVNGS Units 1,2 & 3.With 981007 Ltr ML17313A5961998-09-14014 September 1998 LER 98-002-00:on 980814,B Train H Recombiner Was Noted Inoperable Due to cross-wired Power Receptacle.Cause of Event Is Under investigation.Cross-wired Power Supply Receptacle for B Train H Recombiner Was re-wired 05000530/LER-1998-002-02, :on 980814,B Train H Recombiner Was Noted Inoperable Due to cross-wired Power Receptacle.Cause of Event Is Under investigation.Cross-wired Power Supply Receptacle for B Train H Recombiner Was re-wired1998-09-14014 September 1998
- on 980814,B Train H Recombiner Was Noted Inoperable Due to cross-wired Power Receptacle.Cause of Event Is Under investigation.Cross-wired Power Supply Receptacle for B Train H Recombiner Was re-wired
ML17313A5761998-09-0808 September 1998 LER 98-003-01:on 980113,discovered That One Channel of RWT Level Sys Had Failed High.Caused by Water Intrusion Into Electrical Termination Pull Box.Weep Holes Were Drilled Into Bottoms of Pull Boxes Nearest Level Transmitters 05000529/LER-1998-003, :on 980113,discovered That One Channel of RWT Level Sys Had Failed High.Caused by Water Intrusion Into Electrical Termination Pull Box.Weep Holes Were Drilled Into Bottoms of Pull Boxes Nearest Level Transmitters1998-09-0808 September 1998
- on 980113,discovered That One Channel of RWT Level Sys Had Failed High.Caused by Water Intrusion Into Electrical Termination Pull Box.Weep Holes Were Drilled Into Bottoms of Pull Boxes Nearest Level Transmitters
ML17313A5591998-08-28028 August 1998 LER 98-001-00:on 980730,entered TS 3.0.3 Due to Safety Injection Flow Instruments Being Removed from Svc.Caused by Personnel Error.Transmitters Were Unisolated & Returned to svc.W/980828 Ltr 1999-09-30
[Table view] |
Text
CATEGORY 1 REGULATOi ~
INFORMATION DISTRIBUTION ZSTEM (RIDS)
'N FACIAL:STN-50-528 Palo Verde Nuclear Station, Unit 1, Arizona Publi 05000528 STN-50-529 Palo Verde Nuclear. Station, Unit 2, Arizona Publi 05000529 STN-50-530 Palo Verde Nuclear Station, Unit 3, Arizona Publi 05000530 AUTH.NAME AUTHOR AFFILIATION FULTON,J.D.
Arizona Public Service Co. (formerly Arizona Nuclear Power LEVINE,J.M.
Arizona Public Service Co. (formerly Arizona Nuclear Power RECIP.NAME RECIPIENT AFFILIATION.
I
SUBJECT:
Monthl operating repts for Mar 1996 for PVNGS,units 1,2 6
3 W 960411 ltr.
DISTRIBUTION CODE:
IE24D COPIES RECEIVED:LTR ENCL SIZE:
TITLE: Monthly Operating Report (per Tech Specs)
E NOTES:STANDARDIZED PLANT Standardized plant.
Standardized plant.
05000528 G
05000529 05000530 Q
RECIPIENT ID CODE/NAME PD4-2 PD COPIES LTTR ENCL 1
1 RECIPIENT ID CODE/NAME THOMAS,C COPIES LTTR ENCL 1
1 INTERNAL: ACRS RGN4
. ZNZZR~O,.
10 10 1
1 1
1 AEOD/SPD/RRAB NRR/DRPM/PECB 1
1 1
1 EXTERNAL LITCO BRYCEi J H
NRC PDR 1
1 1
1 NOAC 1
1 D
E NOTE TO ALL "RIDS" RECIPIENTS:
PLEASE HELP US TO REDUCE WASTEl CONTACT THE DOCUMENT CONTROL DESK, ROOM OWFN SD-5(EXT. 415"2083)
TO ELIMINATE YOUR NAME FROM DISTRIBUTION LISTS FOR DOCUMENTS YOU DON'T NEEDl TOTAL NUMBER OF COPIES REQUIRED:
LTTR 19 ENCL 19
)iri Arizona Public Service Company PALO VERDE NUCLEAR GENERATING STATION P.O. BOX 52034
~
PHOENIX, ARIZONA85072-2034 JAMES M. LEVINE VICE PRESIDENT NUCLEAR PAODUCTIDN 182-06132-JML/J LT/JDF April 11, 1996 U. S. Nuclear Regulatory Commission ATTN: Document Control Desk Mail Station P1-37 Washington, DC 20555
Dear Sirs:
Subject:
Palo Verde Nuclear Generating Station (PVNGS)
Units 1, 2, and 3 Docket Nos. STN 50-528/529/530 Monthly Operating Reports for MARCH 1996 Enclosed are the Monthly Operating Reports for MARCH 1996, prepared and submitted pursuant to Specification 6.9.1.6 of Appendix A (Technical Specifications) to the PVNGS Units 1, 2, and 3 Operating Licenses.
By copy of this letter, Arizona Public Service Company is also forwarding the Mionthly Operating Reports to the Regional Administrator, NRC Region IV.
Ifyou have any questions, please contact Judy Fulton at (602) 393-5277.
Sincerely, JML/JLT/JDF/clj cc:
L. J. Callan K. E. Perkins NRC Senior Resident Inspector INPO Records Center UtilityData Institute 9604i7007i 96033i PDR ADQCK 05000528 R
PDR (all w/enclosures)
Enclosures:
MARCH 1996 Monthly Operating Reports
<EOO8O
P C
dl 1
AVERAGE DAILYUNIT POWER LEVEL DOCKET NO.'NIT NAME DATE 6LLllK COMPLETED BY ~I,ltQll MONTH: March 1996 DAY AVERAGE DAILYPOWER LEVEL DAY AVERAGE DAILYPOWER LEVEL 17 1242 18 1242 3
19 1242 538 20 1239 1195 21 1240 1240 22 1237 1241 23 1242 1242 24 1245.
1239 25 1244 10 1239 26 1244 1240 27 1244 12 1238 28 1242 13 1239
'29 1242 14 1237 30 1244 15 1241 31 1243 16 1242
I I
I'
REFUELING INFORMATION DOCKET NO. f~
UNIT NAME
/VV'>~
DATE
@11L95 COMPLETED BY JJ3 ~~
Scheduled date for next refueling shutdown.
The 6th refueling outage is scheduled to begin on 09/07/96.
Scheduled date for restart following refueling.
10/27/96.
Will refueling or resumption of operation thereafter require a Technical Specification change or other license amendments No Scheduled date for submitting proposed licensing action and supporting information.
5/20/96
/
Important Licensing considerations associated with refueling, e.g., new or different fuel design or sup'plier, unreviewed design or performance analysis
- methods, significant changes in fuel design, and new operating procedures.
None.
The number of fuel assemblies.
b) In the spent fuel storage pool.
Licensed spent fuel storage capacity.
Intended change in spent fuel storage capacity. ~0t Projected date of last refueling that can be discharged to spent fuel storage pool assuming present capacity.
2005 (18 Month reloads and full core discharge capabiiity).
SUMMARY
OF OPERATING EXPERIENCE FOR THE MONTH DOCKET NO
~0 UNIT NAME
~UGLY DATE 2481K COMPLETED BY JJ~tltQQ uRIER4Ru 03/01 0000 03/02 0113 03/02 0214 03/02 0235 03/02 0300 03/02 1639 Unit began the month with RX in Mode 3.
Entered Mode 2.
RX critical.
RX power to POAH (Point Of Adding Heat).
Raised RX power to 1.5%.
Commenced RX power increase to 11%.
03/02 1653 Entered Mode 1.
03/02 1750 Completed RX power increase to 11%.
03/03 2133 Synchronized the Main Generator to the grid.
03/03 2340 RX power at19%.
03/04 0810 RX power at 50%.
03/05 0215 RX power at 90%.
03/05 0620 RX power at100%.
03/31 2359 Ended the month in Mode 1 with RX power at 100%.
SHUTDOWNS AND POWER REDUCTIONS March 1996 DOCKET NO QL529 UNIT NAME
@VV'~
DATE
~/'ll95 COMPLETED BY
~D@lgg No.
Outage Method of Duration Shutting Down Date Type" Hours Reason2 Reactor3 LER No.
System Component Cause and Corrective Action Code4 Code5 to Prevent Occurrence 96-01 02/25/96 F
69.6 H
2 N/A N/A N/A Continuation of outage from previous month. Unit returned to power on 3/3/96.
1F Forced S-Scheduled 2Reason:
A-Equipment Failure(Explain)
B-Maintenance or Test C-Refueling D-Regulatory Restriction E-Operator Training 8 License Examination F-Administrative G-Operational Error H-Other (Explain) 3Method:
1-Manual 2-Manual Scram 3-Automatic Scram 4-Continuation from Previous Month 5-Reduction of 20% or Greater in the Past 24 Hours 9-Other-(Explain) 4Exhibit F - Instructions for Preparation of the Data Entry Sheets for Licensee Event Report (LER) File (NUREG 0161)
Exhibit H-Same Source
t t
AVERAGE DAILYUNIT POWER LEVEL DOCKET NO.
~KB UNIT NAME LVHGR2 DATE dLLUK COMPLETED BY ~~~ggQ MONTH: March 1996 DAY AVERAGE DAILYPOWER LEVEL DAY AVERAGE DAILYPOWER LEVEL 1261 17 1260 18 1258 19 1257 20 1247 21 1230 22 1220 23 1203 24 1191 25 10 1177 26 1169 27 12 1150 28 13 1139 29 14 1119 30 15 1060 31 16
I S
REFUELING INFORMATION DOCKET NO.
~KB UNIT NAME ElblGR2 DATE
~gQ COMPLETED BY JJ2.Eggs Scheduled date for next refueling shutdown.
The 6th refueling outage is scheduled for 03/16/96.
Scheduled date for restart following refueling.
05/05/96.
Will refueling or resumption of operation thereafter require a Technical Specification change or other license amendment?
Technical Specification 3.2.6 "Reactor Coolant Cold Leg Temperature" figure 3.2-1 to establish new 100%
power operation allowable temperature from 560'F to 550'F.
Scheduled date for submitting proposed licensing action and supporting information.
Submitted 01/05/96.
Important Licensing considerations associated with refueling, e.g., new or different fuel design or supplier,
'unreviewed design or performance analysis
- methods, significant changes in fuel design, and new operating procedures.
Change megawatts thermal stretch power from 3800 to 3876.
The number of fuel assemblies.
a) tn the cere.~
, b) In the spent fuel storage pool. ~l~
Licensed spent fuel storage capacity. ~29 Intended change in spent fuel storage capacity. ~
Projected date of last refueling that can be discharged to spent fuel storage pool assuming present capacity.
2005 (18 Month reloads and full core discharge capability).
gl r
SUMMARY
OF OPERATING EXPERIENCE FOR THE MONTH DOCKET NO.
~29 UNIT NAME E~~
DATE 812K COMPLETED BY ~~QQ 03/01 0000 03/05 0800 Unit began the month in Mode 1 at 100% RX power.
Commenced RX power coastdown.
03/15 2049 Commenced RX power decrease for shut down.
03/16 0005 03/16 0610 03/16 1022 Tripped RX at 23%, entered mode 3 Started RCS cooldown.
Entered Mode 4.
03/17 0155 Entered Mode 5.
03/20 2211 Entered Mode 6.
03/31 2359 Unit ended the month with RX in Mode 6 for 6th refueling outage.
SHUTDOWNS AND POWER REDUCTIONS March 1996 DOCKET NO
~50-5 9
UNITNAME
~PV GS-DATE 4~/1 1/
COMPLETED BY J. D ~FI~
No.
Date Outage Method of Duration Shutting Down Type" Hours Reason2 Reactor3 LER No.
System Component Cause and Corrective Action Code4 Code5 to Prevent Occurrence 96-02 03/16/96 S
383.9 N/A N/A N/A RX manually tripped to begin the sixth refueling outage.
1F-Forced S-Scheduled Reason:
A-Equipment Failure(Explain)
B-Maintenance or Test C-Refueling D-Regulatory Restriction
- E-Operator Training 8 License Examination F-Administrative G-Operational Error H-Other (Explain) 3Method:
1-Manual 2-Manual Scram 3-Automatic Scram 4-Continuation from Previous Month 5-Reduction of 20% or Greater in the Past 24 Hours 9-Other-(Explain) 4Exhibit F - Instructions for Preparation of the Data Entry Sheets for Licensee Event Report (LER) File (NUREG 0161)
Exhibit H-Same Source 0
0
'h h
W
AVERAGE DAILYUNIT POWER LEVEL DOCKET NO.
5%53Q UNIT NAME ERHGR2 DATE dLL1lK COMPLETED BY ~MQQ 6LUJSZW MONTH: March 1996 DAY AVERAGE DAILYPOWER LEVEL DAY AVERAGE DAILYPOWER LEVEL 1250 17 1248 1245 18 1249 1257 19 1253 1258 20 1255 1255 21 1252 1254 22 1252 1257 23 1246 1255 24 1249 1256 25 1249 10 1255 26 1247 1257 27
- 1247, 12 1252 28 1247 13 1250 29 1249 14 1254 30 1249 15 1255 1250 16 1245
REFUELING INFORMATION DOCKET NO.
59-l539 UNIT NAME ElHGR2 DATE dLLUK COMPLETED BY ~~QQ Scheduled date for next refueling shutdown.
The 6th refueling outage is scheduled for 3/15/97.
Scheduled date for restart following refueling.
5/7/97.
Will refueling or resumption of operation thereafter require a Technical Specification change or other license amendments None.
Scheduled date for submitting proposed licensing action and supporting information.
None.
Important Licensing considerations associated with refueling, e.g., new or different fuel design or supplier, unreviewed design or performance analysis
- methods, significant changes in fuel design, and new operating procedures.
None.
The number of fuel assemblies.
t Licensed spent fuel storage capacity.
Intended change in spent fuel storage capacity.
Projected date of last refueling that can be discharged to spent fuel storage pool assuming present capacity.
2005 (18 Month reloads and full core discharge capability).
SUMMARY
OF OPERATING EXPERIENCE FOR THE MONTH DOCKET NO
~Q UNIT NAME DATE 9~95 COMPLETED BY J D~FQQ Ehm~%5 03/01
- 0000, Unit began the month in Mode 1 at 100% RX power.
03/31 2359 Unit ended the month in Mode 1 at 100% RX power.
F'
SHUTDOWNS AND POWER REDUCTIONS March 1996 DOCKET NO QQ-QQ UNIT NAME DATE Q~gg COMPLETED BY ~Ii]31 No.
Date Outage Method of Duration Shutting Down Type" Hours Reason2 Reactor3 LER No.
System Component Cause and Corrective Action Code4 Code5 to Prevent Occurrence No reactor shutdowns or significant power reductions occurred during the month of March 1996.
"F-Forced-S-Scheduled Reason:
A-Equipment Failure(Explain)
B-Maintenance or Test C-Refueling D-Regulatory Restriction E-Operator Training 8 License Examination F-Administrative G-Operational Error H-Other (Explain) 3Method:
1-Manual 2-Manual Scram 3-Automatic Scram 4-Continuation from Previous Month 5-Reduction of 20% or Greater in the Past 24 Hours 9-Other-(Explain) 4Exhibit F - Instructions for Preparation of the Data Entry Sheets for Licensee Event Report (LER) File (NUREG 0161)
Exhibit H-Same Source -
-Ol
~
a C j S
t'I
'I i
t