ML17313A206

From kanterella
Jump to navigation Jump to search
Monthly Operating Repts for Jan 1998 for Palo Verde Nuclear Generating Station,Unit 1,2 & 3.W/980210 Ltr
ML17313A206
Person / Time
Site: Palo Verde  Arizona Public Service icon.png
Issue date: 01/31/1998
From: Fulton J, Overbeck G
ARIZONA PUBLIC SERVICE CO. (FORMERLY ARIZONA NUCLEAR
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
035-00498-GRO-J, 35-498-GRO-J, NUDOCS 9802170077
Download: ML17313A206 (9)


Text

E ~ 'ATEGORY 1~

REGULATORY INFORMATION DISTRIBUTIOTSYSTEM (RIDS)

ACCESSION NBR:9802170077 DOC.DATE: DOCKET ¹ FACIL:S~-50-528 Palo Verde Nuclear Station, Unit 1, Arizona Publi 05000528 8TN-'5'0'.-'529 Palo Verde Nuclear Station, Unit 2, Arizona Publi 05000529 STN-50-530 Palo Verde Nuclear Station, Unit 3, Arizona Publi 05000530 AUTH. NAME AUTHOR AFFILIATION FULTON,J.D. Arizona Public Service Co. (formerly Arizona Nuclear Power OVERBECK,G.R. Arizona Public Service Co. (formerly Arizona Nuclear Power RECIP.NAME RECIPIENT AFFILIATION Monthly operating repts for Jan 1998 Verde Nuclear

SUBJECT:

Generating Station, Unit. 1,2 &, .W/980210 ltr.o DISTRIBUTION CODE: IE24D COPIES RECEIVED:LTR ENCL SIZE:

TITLE: Monthly Operating Report (per Tech Specs) E NOTES:STANDARDIZED PLANT 05000528@

Standardized plant. 05000529 Standardized plant. 05000530O RECIPIENT COPIES RECIPIENT COPIES ID CODE/NAME LTTR ENCL ID CODE/NAME LTTR ENCL PD4-2 PD 1 1 CLIFFORD,J 1 1 INTERNAL: ACRS 1 1 AEOD/SPD/RRAB 1 1 ENTER 0 1 1 OC/DBA/PAD 1 1 1 1 EXTERNAL I L TCO BRYCE g J H 1 1 NOAC 1 1 D NRC PDR 1 1 E

N NOTE TO ALL "RIDS" RECIPIENTS:

PLEASE HELP US TO REDUCE WASTE. TO HAVE YOUR NAME OR ORGANIZATION REMOVED FROM DISTRIBUTION LISTS OR REDUCE THE NUMBER OF COPIES RECEIVED BY YOU OR YOUR ORGANIZATION, CONTACT THE DOCUMENT CONTROL DESK (DCD) ON EXTENSION 415-2083 TOTAL NUMBER OF COPIES REQUIRED: LTTR 10 ENCL 10

t~

~

I l

i, l l

i.

Comm/rmnnr. Innmmr/nn. Eanyy.

Greg g R. Overbeck Mail Station 7602 Palo Verde Nuclear Vice President TEL 602/39341 48 P.O. Box 52034 Generating Station Nuclear Production FAX 602/3936077 Phoenbr, AZ 85072-2034 035-00498-6 RO/JDF February 10, 1998 U. S. Nuclear Regulatory Commission ATTN: Document Control Desk Mail Station P1-37 Washington, DC 20555

Dear Sirs:

Subject:

Palo Verde Nuclear Generating Station (PVNGS)

Units 1, 2, and 3 Docket Nos. STN 50-528/529/530 Monthly Operating Reports for JANUARY 1998 Enclosed are the Monthly Operating Reports for January 1998, prepared and submitted pursuant to Specification 6.9.1.6 of Appendix A (Technical Specifications) to the PVNGS Units 1, 2, and 3 Operating Licenses.

By copy of this letter, Arizona Public Service Company is also forwarding the Monthly Operating Reports to the Regional Administrator, NRC Region IV.

If you have any questions, please contact Judy Fulton at (602) 250-3549.

Sincerely, G RO/JDF/clj

Enclosures:

JANUARY 1998 Monthly Operating Reports CC: E. W. Merschoff K. E. Perkins (all w/enclosures)

~t 94 l INPO Records Center <'A~to r ti'J LB Utility Data Institute 9802%70077 980i3i PDR ADQCK 05000528 ',

llIIIlllIIIlllMllllllllllllllllllll R PDR

I St I

iH h

't

t NRC MONTHLYOPERATING DATA REPORT t

DOCKET NO.: 50-528 NAME:

'NIT PVNGS-1 DATE: 2/9/98 COMPLETED BY: J. D. Fuiton TELEPHONE: 602 250-3549 Reporting Period: Janua 1998 Design Electrical Rating (Net MWe): 1265

2. Maximum Dependable Capacity (Net MWe): 1243 Unit 1 Generatin Statistics- -'.

This Month Yr. to Date Cumulative'4,740.3 Hours Reactor was Critical '44.0 744.0

4. Hours Generator was-On-Line, -

-:.::.'-',.'."=-"-'---':,".' 744.0 744.0 73,555.1 Unit Reserve Shutdown'Hours -,:, '-,'-':,,""=' ',*' 0.0 0.0 0.0 Net. Electrical Ener Generated MWh 933,948 933,948 87,137,216 UNIT SHUTDOWNS Outage Method of Duration Shutting Down Cause and Corrective Action No. Date Type'ours Reason Reactor to Prevent Occurrence No reactor shutdowns occurred during the month of January 1998.

'F-Forced 2Reason: sMethod:

S-Scheduled A-Equipment Failure (Explain) 1-Manual B-Maintenance or Test 2-Manual Trip / Scram C-Refueling 3-Automatic Trip / Scram D-Regulatory Restriction 4-Continuation E-Operator Training / License Examination 5-Other-(Explain)

F-Administrative 8-Operational Error (Explain)

H-Other (Explain)

SUMMARY

NRC MONTHLYOPERATING DATA REPORT DOCKET NO.: 50-529 NAME: 'NIT PVNGS-2 DATE: 2/9/98 COMPLETED BY: J. D. Fulton TELEPHONE: 602 250-3549 Reporting Period: Janua 1998

1. Design Electrical Rating (Net MWe): 1265
2. Maximum Dependable Capacity (Net MWe): 1243

'-.,":<<;,~""i<;;-~;,'8" ",Unit 2 Generatin ",Statistics~~4"-',-";.;.':,;"',::.-..'-";;"::" 5~';.this'Month".-~:;".'44.0 .-'.-';."',-,Cumulative.,'9';,

,Hoiirs.Reactor..'.was.'.Critical';",-'P~V~f;.~-
.".~$ >>. 5!-.;.,"',j~<~",-~~);;;:.9!'~<,',>>. 744.0 74,169.7

"'Hou'rs'enerator,::Was; On'-Line .-"~,;.":.':";~ll'-.".:"~"~".'4;;;~;;:~4i,."-';,";-, 744.0 744.0 72,976.8

.Unit: Res'e'r'veSh'utdo'wii'Ho'u'i's',4;:;=,:~~i,;;-"'4l;-';:;-',A+;:.~@;,;;9",;',~i';,'.,'.;::, 0.0 0.0 0.0
Net';Ele'ctrIc'al
.En'er'".Gen'crated" MWh -:,<<ig,"'.~~<'..<j>%44'~5,"-,: 947,011 947,011 87,376,570 UNIT SHUTDOWNS Outage Method of Duration Shutting Down Cause and Corrective Action No. Date Type'ours Reasons Reactor to Prevent Occurrence No reactor shutdowns occurred during the month of January 1998.

'F-Forced ~Reason: sMethod:

S-Scheduled A-Equipment Failure (Explain) 1-Manual B-Maintenance or Test 2-Manual Trip / Scram C-Refueling 3-Automatic Trip / Scram D-Regulatory Restriction 4-Continuation E-Operator Training / License Examination 5-Other-(Explain)

F-Administrative 6-Operational Error (Explain)

H-Other (Explain)

SUMMARY

NRC MONTHLYOPERATING DATA REPORT DOCKET NO. '50-530 UNIT NAME: PVNGS-3 DATE: 2/9/98 COMPLETED BY: J. D. Fulton TELEPHONE: 602 250-3549 Reporting Period: Janua 1998

1. Design Electrical Rating (Net MWe): 1269
2. Maximum Dependable Capacity (Net MWe): 1247 Unit 3.Generatin Statistics- This Yr; to Date Cumulative

Month'--'44.0 3.. Hours Reactor was Critical 744.0 70,069.7

4. Hours Generator'was'On-Line 744.0 744.0 69,243.6 Unit Reserve Shutdow'n 0.0 0.0 0.0
6. Net Electrical Ener Hours'NIT Generated MWh

" 930,278 930,278 83,683,249 SHUTDOWNS Outage Method of Duration Shutting Down Cause and Corrective Action No. Dale Type'ours ReasorP Reactor to Prevent Occurrence No reactor shutdowns occurred during the month of January 1998.

'F-Forced 2Reason: sMethod:

S-Scheduled A-Equipment Failure (Explain) 1-Manual B-Maintenance or Test 2-Manual Trip / Scram C-Refueling 3-Automatic Trip / Scram D-Regulatory Restriction 4-Continuation E-Operator Training / License Examination 5-Other-(Explain)

F-Administrative 8-Operational Error (Explain)

H-Other (Explain)

SUMMARY