Monthly Operating Repts for Sept 1996 for PVNGS Unit 1,2 & 3
ML17312A998
Person / Time
Site: Palo Verde  Arizona Public Service icon.png
Issue date: 09/30/1996
From: Fulton J
ARIZONA PUBLIC SERVICE CO. (FORMERLY ARIZONA NUCLEAR
To:
Shared Package
ML17312A999 List:
References
NUDOCS 9610160436
Download: ML17312A998 (28)


Text

Enclosure 1 September 1996 Monthly Operating Report 96'160436 961004' PDR 4DPCK 05000525i R PDR

I H

l I) i

AVERAGE DAILYUNIT POWER LEVEL DOCKET NO. ~ZQ UNIT NAME ~PUN -1 DATE iQLQBLK COMPLETED BY ~D~~

MONTH: September 1996 DAY AVERAGE DAILYPOWER LEVEL DAY AVERAGE DAILYPOWER LEVEL 1214 17 1068 1217 18 1054 1217 19 1046 1204 20 1016 1192 21 1177 22 1169 23 1157 24 9 1147 25 10 1136 26 1124 27 12 1114 28 13 1107 29 14 1106 30 15 1096 31 16 1080

REFUELING INFORMATION DOCKET NO. QL525 UNIT NAME MbE~

DATE MOBS COMPLETED BY ~~IIQQ MAIMED Scheduled date for next refueling shutdown.

The 6th refueling outage began on 09/21/96.

Scheduled date for restart following refueling.

11/1 0/96.

Will refueling or resumption of operation thereafter require a Technical Specification change or other license amendment?

Scheduled date for submitting proposed licensing action and supporting information.

5/20/96 Important Licensing considerations associated with refueling, e.g., new or different fuel design or supplier, unreviewed design or performance analysis methods, significant changes in fuel design, and new operating procedures.

None.

The number of fuel assemblies.

b) In the spent fuel storage pool.

Licensed spent fuel storage capacity.

Intended change in spent fuel storage capacity. ~~

Projected date of last refueling that can be discharged to spent fuel storage pool assuming present capacity.

2005 (18 Month reloads and full core discharge capability).

J

~ 0

SUMMARY

OF OPERATING EXPERIENCE FOR THE MONTH DOCKET NO. ~25 UNIT NAME DATE 10LQKK COMPLETED BY J D ~m 09/01 0000 Unit began the month in Mode 1 at 100% power.

09/03 2200 Commenced RX Power end-of-cycle coastdown.

09/21 0017 Manually Tripped RX to start refueling outage. Mode 3 09/21 1010 Entered Mode 4.

09/22 0144 Entered Mode 5.

09/24 1609 Entered Mode 6.

09/30 2359 Unit ended the month in Mode 6.

II l

II

SHUTDOWNS AND POWER REDUCTIONS September 1996 DOCKET NO UNIT NAME EVN95-1 DATE 10LQKK COMPLETED BY ~ggQrl Outage Method of Duration Shutting Down System Component Cause and Corrective Action Date Type" Hours Reason2 Reactor3 LER No. Code4 Code5 to Prevent Occurrence 96-04 9/21/96 S 239.7 C N/A N/A N/A RX manually tripped to begin the sixth refueling outage.

1F-Forced 2Reason. 3Method: 4Exhibit F - Instructions for Preparation S-Scheduled A-Equipment Failure(Explain) . 1-Manual of the Data Entry Sheets for Licensee B-Maintenance or Test 2-Manual Scram Event Report (LER) File (NUREG 0161)

C-Refueling 3-Automatic Scram D-Regulatory Restriction 4-Continuation from Previous Month E-Operator Training & License 5-Reduction of 20% or Greater in the Exhibit H-Same Source Examination Past 24 Hours F-Administrative 9-Other-(Explain)

G-Operational Error H-Other (Explain)

~ ~

P

AVERAGE DAILYUNIT POWER LEVEL DOCKET NO. SL529 UNIT NAME LVHGR2 DATE MGKK COMPLETED BY J D~QQ UHEJSHRZ MONTH: September 1996 DAY AVERAGE DAILYPOWER LEVEL DAY AVERAGE DAILYPOWER LEVEL 1246 17 1260 1252 18 1260 1250 19 1262 1252 20 1263 1253 21 1261 1253 22 1260 1253 23 1262 1256 24 1259 1257 25 1257 10 1257 26 1255 1259 27 1262 12 1255 28 1266 13 1257 29 1265 14 1262 30 1263 15 1264 31 16 1258

i REFUELING INFORMATION DOCKET NO. QQ-QQ UNIT NAME ~V DATE lQLQBLK COMPLETED BY ~D Scheduled date for next refueling shutdown.

The 7th refueling outage is scheduled for 09/20/97.

Scheduled date for restart following refueling.

11/09/97.

Will refueling or resumption of operation thereafter require a Technical Specification change or other license amendment?

No.

Scheduled date for submitting proposed licensing action and supporting information.

N/A Important Licensing considerations associated with refueling, e.g., new or different fuel design or supplier, unreviewed design or performance analysis methods, significant changes in fuel design, and new operating procedures.

N/A

~

The number of fuel assemblies.

a) tn the core.

b) In the spent fuel storage pool.

Licensed spent fuel storage capacity.

't~

~29 Intended change in spent fuel storage capacity. ~~

Projected date of last refueling that can be discharged to spent fuel storage pool assuming present capacity.

2005 (18 Month reloads and full core discharge capability).

j .I 1 t t

SUMMARY

OF OPERATING EXPE RIENCE FOR THE MONTH DOCKET NO. SL529 UNIT NAME ~VV~~>~

DATE ALGA COMPLETED BY J D ~go IHRUSLSZ 09/01 0000 Unit began the month in Mode 1 at 100% RX power.

09/30 2359 Unit ended the month in Mode 1 at 100% RX power.

~ I ~

SHUTDOWNS AND POWER REDUCTIONS September 1996 DOCKET NO ~!QQ UNIT NAME /VV'~~

DATE 10l99lK COMPLETED BY J D~gO Outage Method of.

Duration Shutting Down System Component Cause and Corrective Action No. Date Type" Hours Reason2 Reactor3 LER No. Code" Code5 to Prevent Occurrence No reactor shutdowns or significant power reductions occurred during the month of September 1996.

F-Forced 2Reason. 3Method: 4Exhibit F - Instructions for Preparation S-Scheduled A-Equipment Failure(Explain) 1-Manual of the Data Entry Sheets for Licensee 8-Maintenance or Test 2-Manual Scram Event Report (LER) File (NUREG 0161)

C-Refueling 3-Automatic Scram D-Regulatory Restriction 4-Continuation from Previous Month E-Operator Training & License 5-Reduction of 20% or Greater in the Exhibit H-Same Source Examination Past 24 Hours F-Administrative 9-Other-(Explain)

G-Operational Error H-Other (Explain)

~ >

y

t AVERAGE DAILYUNIT POWER LEVEL t

DOCKET NO. K='53Q UNIT NAME EEK~

DATE ~/Q//j COMPLETED BY ~UHQQ MONTH: September 1996 DAY AVERAGE DAILYPOWER LEVEL DAY AVERAGE DAILYPOWER LEVEL 1240 17 1257 1242 18 1258 1248 19 1238 1250 20 1238 1249 21 1250 1252 22 1252 1245 23 1257 1248 24 1254 1253 25 1252'0 1253 26 1249 1253 27 1257 12 1252 28 1254 13 1251 29 1253 14 1256 30 1254 15 1255 31 16 1254

~ I REFUELING INFORMATION DOCKET NO.

UNIT NAME f~

MHRR2 DATE 1QNQLK COMPLETED BY J D~fQQ

~ Scheduled date for next refueling shutdown.

The 6th refueling outage is scheduled for 2/22/97.

Scheduled date for restart following refueling.

4/13/97.

Will refueling or resumption of operation thereafter require a Technical Specification change or other license amendment?

None.

Scheduled date for submitting proposed licensing action and supporting information.

None.

Important Licensing considerations associated with refueling, e.g., new or different fuel design or supplier, unreviewed design or performance analysis methods, significant changes in fuel design, and new operating procedures.

None.

The number of fuel assemblies.

b) In the spent fuel storage pool.

Licensed spent fuel storage capacity.

Intended change in spent fuel storage capacity.

Projected date of last refueling that can be discharged to spent fuel storage pool assuming present capacity.

2005 (18 Month reloads and full core discharge capability).

SUMMARY

OF OPERATING EXPERIENCE FOR THE MONTH DOCKET NO.59-539 UNIT NAME DATE KlQKK COMPLETED BY SIRUHJWI 09/01 0000 Unit began the month in Mode 1 at 100% RX power.

09/30 2359 Unit ended the month in Mode 1 at,100% RX power.

I ~ ij SHUTDOWNS AND POWER REDUCTIONS September 1996 DOCKET NO ~5-QQ UNIT NAME ~PVN -3 DATE 3 0/09/96 COMPLETED BY uuu=

J D Fut/on Outage Method of Duration Shutting Down System Component Cause and Corrective Action No. Date Type" Hours Reason2 Reactor3 LER No. Code4 Code5 to Prevent Occurrence No reactor shutdowns or significant power reductions occurred during the month of September 1996.

"F-Forced 2 Reason: 3Method: 4Exhibit F - Instructions for Preparation S-Scheduled A-Equipment Failure(Explain) 1-Manual of the Data Entry Sheets for Licensee B-Maintenance or Test 2-Manual Scram Event Report (LER) File (NUREG 0161)

C-Refueling 3-Automatic Scram D-Regulatory Restriction 4-Continuation from Previous Month E-Operator Training 8 License 5-Reduction of 20% or Greater in the Exhibit H-Same Source Examination Past 24 Hours F-Administrative 9-Other-(Explain)

G-Operational Error H-Other (Explain)