MONTHYEARML17300B3811999-09-30030 September 1999 Monthly Operating Repts for Sept 1999 for Pvngs,Units 1,2 & 3.With 991007 Ltr ML17300B3271999-08-31031 August 1999 Monthly Operating Rept for Aug 1999 for Pvngs,Units 1,2 & 3 ML17313B0611999-07-31031 July 1999 Monthly Operating Repts for July 1999 for Pvngs,Units 1,2 & 3.With 990810 Ltr ML17300B3151999-06-30030 June 1999 Monthly Operating Repts for June 1999 for Pvngs,Units 1,2 & 3.With 990714 Ltr ML17313A9731999-05-31031 May 1999 Monthly Operating Repts for May 1999 for Pvngs,Units 1,2 & 3.With 990608 Ltr ML17313A9201999-04-30030 April 1999 Monthly Operating Repts for Apr 1999 for Pvngs,Units 1,2 & 3.With 990512 Ltr ML17313A8801999-03-31031 March 1999 Monthly Operating Repts for Mar 1999 for Pvngs,Units 1,2 & 3.With 990412 Ltr ML17313A8501999-02-28028 February 1999 Monthly Operating Repts for Feb 1999 for Palo Verde Nuclear Generating Station.With 990311 Ltr ML17313A8061999-01-31031 January 1999 Monthly Operating Repts for Jan 1999 for Pvngs,Units 1,2 & 3.With 990218 Ltr ML17313A7381998-12-31031 December 1998 Monthly Operating Repts for Dec 1998 for Palo Verde Nuclear Generating Station,Units 1,2 & 3.With 990113 Ltr ML17313A7031998-11-30030 November 1998 Monthly Operating Repts for Nov 1998 for Pvngs,Unit 1,2 & 3. with 981209 Ltr ML17313A6741998-10-31031 October 1998 Monthly Operating Repts for Oct 1998 for Pvngs,Units 1,2 & 3.With 981109 Ltr ML17313A6561998-09-30030 September 1998 Monthly Operating Rept for Sept 1998 for PVNGS Units 1,2 & 3.With 981007 Ltr ML17313A5301998-07-31031 July 1998 Monthly Operating Repts for July 1998 for Pvgns,Units 1,2 & 3.W/980812 Ltr ML17313A5001998-06-30030 June 1998 Monthly Operating Repts for June 1998 for Palo Verde Nuclear Generating Station,Units 1,2 & 3.W/980710 Ltr ML17313A4211998-05-31031 May 1998 Monthly Operating Repts for May 1998 for Pvngs,Units 1,2 & 3.W/980609 Ltr ML17313A3691998-04-30030 April 1998 Monthly Operating Repts for Apr 1998 for PVNGS.W/980412 Ltr ML17313A3461998-03-31031 March 1998 Monthly Operating Repts for Mar 1998 for PVNGS Units 1,2 & 3.W/980408 Ltr ML17313A2521998-02-28028 February 1998 Monthly Operating Repts for Feb 1998 for Palo Verde Nuclear Generating Station,Units 1,2 & 3.W/980311 Ltr ML17313A2061998-01-31031 January 1998 Monthly Operating Repts for Jan 1998 for Palo Verde Nuclear Generating Station,Unit 1,2 & 3.W/980210 Ltr ML17313A1811997-12-31031 December 1997 Monthly Operating Repts for Dec 1997 for Palo Verde Nuclear Generating Station,Units 1,2 & 3 ML17313A1351997-11-30030 November 1997 Monthly Operating Repts for Nov 1997 for Palo Verde Nuclear Generating Station,Units 1,2 & 3.W/971208 Ltr ML17313A1821997-11-30030 November 1997 Revised Monthly Operating Rept for Nov 1997 for Palo Verde Nuclear Generating Station,Unit 3 ML17312B7521997-10-31031 October 1997 Monthly Operating Repts for Oct 1997 for Palo Verde Nuclear Generating Station,Units 1,2 & 3.W/971112 Ltr ML17312B6641997-08-31031 August 1997 Monthly Operating Repts for Aug 1997 for Pvngs,Units 1,2 & 3.W/970909 Ltr ML17313B0621997-07-31031 July 1997 Monthly Operating Repts for July 1997 for Pvngs,Units 1,2 & 3.With 970812 Ltr ML17312B1741996-12-31031 December 1996 Monthly Operating Repts for Dec 1996 for Pvngs,Units 1,2 & 3.W/970109 Ltr ML17312A9981996-09-30030 September 1996 Monthly Operating Repts for Sept 1996 for PVNGS Unit 1,2 & 3 ML17312A9681996-08-31031 August 1996 Monthly Operating Repts for Aug 1996 for Palo Verde Nuclear Generating Station Units 1,2 & 3.W/960911 Ltr ML17312A9181996-07-31031 July 1996 Monthly Operating Repts for July 1996 for Pvngs,Units 1,2 & 3 ML17312A9191996-04-30030 April 1996 Rev to MOR for Apr 1996 for PVNGS Unit 1 ML17312A6881996-03-31031 March 1996 Monthly Operating Repts for Mar 1996 for PVNGS.W/960411 Ltr ML17312B0001996-03-31031 March 1996 Revised Monthly Operating Rept for Mar 1996 for Palo Verde Nuclear Generating Station,Unit 2 ML17312A5371996-01-31031 January 1996 Monthly Operating Rept for Jan 1996 for PVNGS Units 1,2 & 3. W/960213 Ltr ML17311B3121995-11-30030 November 1995 Monthly Operating Repts for Nov 1995 for PVNGS Units 1,2 & 3.W/951213 Ltr ML17311B2681995-10-31031 October 1995 Monthly Operating Repts for Oct 1995 for Palo Verde Nuclear Generating Station.W/951108 Ltr ML17311B2221995-09-30030 September 1995 Monthly Operating Repts for Sept 1995 for Palo Verde Nuclear Generating Station.W/951011 Ltr ML17311B1821995-08-31031 August 1995 Monthly Operating Repts for Aug 1995 for Palo Verde Nuclear Generating Station.W/950913 Ltr ML17311B0441995-06-30030 June 1995 Monthly Operating Repts for June 1995 for PVNGS Unit 1,2 & 3 ML17311B0451995-05-31031 May 1995 Revised Page 6 to Monthly Operating Rept for May 1995 for PVNGS Unit 2 ML17311A9471995-04-30030 April 1995 Revised Monthly Operating Rept for Apr 1995 for PVNGS ML17311A8721995-04-30030 April 1995 Monthly Operating Repts for Apr 1995 for PVNGS Units 1-3. W/950509 Ltr ML17311A8061995-03-31031 March 1995 Monthly Operating Repts for Mar 1995 for Palo Verde Nuclear Generating Station.W/950412 Ltr ML17311A7101995-02-28028 February 1995 Monthly Operating Repts for Feb 1995 for Palo Verde Nuclear Generating Station ML17311A6601995-01-31031 January 1995 Monthly Operating Repts for Jan 1995 for Palo Verde Nuclear Generating Station.W/950210 Ltr ML17311A7121994-11-30030 November 1994 Revised Monthly Operating Rept for Nov 1994 for Palo Verde Nuclear Plant Unit 3 ML17311A2691994-08-31031 August 1994 Monthly Operating Repts for Aug 1994 for Palo Verde Nuclear Generating Station.W/940913 Ltr ML17310B2811994-04-30030 April 1994 Monthly Operating Repts for Apr 1993 for Palo Verde Nuclear Generating Station.W/940513 Ltr ML17310B2161994-03-31031 March 1994 Monthly Operating Repts for Mar 1994 for PVNGS Units 1,2 & 3 ML17310B1001994-02-28028 February 1994 Monthly Operating Repts for Feb 1994 for Palo Verde Nuclear Generating Station Units 1,2 & 3.W/940314 Ltr 1999-09-30
[Table view] Category:TEXT-SAFETY REPORT
MONTHYEARML17300B3811999-09-30030 September 1999 Monthly Operating Repts for Sept 1999 for Pvngs,Units 1,2 & 3.With 991007 Ltr ML17300B3271999-08-31031 August 1999 Monthly Operating Rept for Aug 1999 for Pvngs,Units 1,2 & 3 ML17313B0751999-08-27027 August 1999 LER 99-002-00:on 990730,test Mode Trip Bypass for EDG Output Breakers Not Surveilled.Cause Under Investigation.Operations Personnel Conservatively Invoked SR 3.0.3 for SR 3.8.1.13. with 990827 Ltr ML17313B0611999-07-31031 July 1999 Monthly Operating Repts for July 1999 for Pvngs,Units 1,2 & 3.With 990810 Ltr ML17313B0191999-07-16016 July 1999 LER 99-005-00:on 990618,RT on Low DNBR Was Noted.Caused by Hardware Induced Calculation Error.Cr Operator Was Taken to Place Reactor in Stable Condition IAW Appropriate Operating Procedure ML17300B3151999-06-30030 June 1999 Monthly Operating Repts for June 1999 for Pvngs,Units 1,2 & 3.With 990714 Ltr ML17313A9921999-06-21021 June 1999 Special Rept:On 990525,RMS mini-computer Was Removed from Service to Implement Yr 2000 Mod & Was OOS Longer than 72 H Allowed.Caused by Planned Y2K Mods.Preplanned Alternate Sampling Program Was Initiated ML17313A9911999-06-18018 June 1999 Special Rept:On 990510,loose-part Detection Sys Channel 2 Was Declared Inoperable.Caused by Malfunction of Mineral Cable Connector to Accelerometer.Licensee Will Implement Modifications Which Will Enhance loose-part Detection Sys ML17313A9731999-05-31031 May 1999 Monthly Operating Repts for May 1999 for Pvngs,Units 1,2 & 3.With 990608 Ltr ML17313A9281999-05-0707 May 1999 LER 99-004-00:on 990408,PSV Lift Pressures Were Outside of TS Limits.Caused by Lift Pressure Setpoint Drift.Psvs Have Been Tested,Disassembled,Inspected,Reassembled & Certified at Wyle Labs ML17313A9201999-04-30030 April 1999 Monthly Operating Repts for Apr 1999 for Pvngs,Units 1,2 & 3.With 990512 Ltr ML17313A8951999-04-14014 April 1999 LER 99-003-00:on 990317,required Surveillance Requirement Not Completed Due to Deficient Procedure,Was Determined. Caused by Cognitive Personnel Error.St Procedures Revised to Require Chiller to Be Operating & Oil Temperature Checked ML17313A8921999-04-13013 April 1999 LER 98-003-01:on 980902,discovered That MSSV as-found Lift Pressures Were Outside TS Limits.Caused by Bonding of Valve Disc to Nozzle Seat.Affected Valves Were Adjusted,Retested & Returned to Svc ML17313A8891999-04-0909 April 1999 LER 99-001-00:on 990310,RT on High Pressurizer Pressure Was Noted.Caused by Loss of Heat Removal.Cr Supervisor Was Removed from Shift Duties for Diagnostics Skills Training. with 990409 Ltr ML17300B3071999-03-31031 March 1999 Seismic Portion of Submittal-Only Screening Review of Palo Verde Nuclear Generating Station Units Ipeee. ML17313A8801999-03-31031 March 1999 Monthly Operating Repts for Mar 1999 for Pvngs,Units 1,2 & 3.With 990412 Ltr ML20207M9231999-03-12012 March 1999 Amended Part 21 Rept Re Cooper-Bessemer Ksv EDG Power Piston Failure.Total of 198 or More Pistons Have Been Measured at Seven Different Sites.All Potentially Defective Pistons Have Been Removed from Svc Based on Encl Results ML20207H7471999-03-10010 March 1999 1999 Emergency Preparedness Exercise 99-E-AEV-03003 ML17313A8361999-03-0101 March 1999 LER 99-001-00:on 990103,TS Violation for Power Dependent Insertion Limit Alarm Being Inoperable.Caused by Personnel Error.Revised Procedure to Clarify How Computer Point Is to Be Returned to Scan Mode.With 990302 Ltr ML17313A8501999-02-28028 February 1999 Monthly Operating Repts for Feb 1999 for Palo Verde Nuclear Generating Station.With 990311 Ltr ML17313A7791999-02-0505 February 1999 Safety Evaluation Accepting Licensee Rev to Emergency Plan That Would Result in Two Less Radiation Protection Positions Immediatelu Available During Emergencies ML17313A8061999-01-31031 January 1999 Monthly Operating Repts for Jan 1999 for Pvngs,Units 1,2 & 3.With 990218 Ltr ML17313A7701999-01-15015 January 1999 LER 96-008-00:on 960507,inadequate Procedure Results in Nuclear Power Channels Not Calibrated During Power Ascension Tests Occurred.Caused by Deficient Procedure.Procedure Revised ML17313A7381998-12-31031 December 1998 Monthly Operating Repts for Dec 1998 for Palo Verde Nuclear Generating Station,Units 1,2 & 3.With 990113 Ltr ML20206H2101998-12-31031 December 1998 SCE 1998 Annual Rept ML17313A7031998-11-30030 November 1998 Monthly Operating Repts for Nov 1998 for Pvngs,Unit 1,2 & 3. with 981209 Ltr ML17313A6701998-11-0404 November 1998 Rev 2 to PVNGS Unit 2 Colr. ML17313A6741998-10-31031 October 1998 Monthly Operating Repts for Oct 1998 for Pvngs,Units 1,2 & 3.With 981109 Ltr ML17313A6611998-10-24024 October 1998 LER 98-008-00:on 980729,EQ of Electrical Connectors Were Not Adequately Demonstrated.Caused Because Test Was Conducted with Only Single Lv Connector & Without Fully Ranged Inputs. Revised EQ Requirements ML17313A6561998-09-30030 September 1998 Monthly Operating Rept for Sept 1998 for PVNGS Units 1,2 & 3.With 981007 Ltr ML17313A5961998-09-14014 September 1998 LER 98-002-00:on 980814,B Train H Recombiner Was Noted Inoperable Due to cross-wired Power Receptacle.Cause of Event Is Under investigation.Cross-wired Power Supply Receptacle for B Train H Recombiner Was re-wired ML17313A5761998-09-0808 September 1998 LER 98-003-01:on 980113,discovered That One Channel of RWT Level Sys Had Failed High.Caused by Water Intrusion Into Electrical Termination Pull Box.Weep Holes Were Drilled Into Bottoms of Pull Boxes Nearest Level Transmitters ML17313A5591998-08-28028 August 1998 LER 98-001-00:on 980730,entered TS 3.0.3 Due to Safety Injection Flow Instruments Being Removed from Svc.Caused by Personnel Error.Transmitters Were Unisolated & Returned to svc.W/980828 Ltr ML20151S0941998-08-21021 August 1998 Rev 6 to COLR for PVNGS Unit 3 ML20151S0861998-08-21021 August 1998 Rev 4 to COLR for PVNGS Unit 1 ML20151S0901998-08-21021 August 1998 Rev 1 to COLR for PVNGS Unit 2 ML18066A2771998-08-13013 August 1998 Part 21 Rept Re Deficiency in CE Current Screening Methodology for Determining Limiting Fuel Assembly for Detailed PWR thermal-hydraulic Sa.Evaluations Were Performed for Affected Plants to Determine Effect of Deficiency ML17313A5401998-08-13013 August 1998 Special Rept:On 980715,declared PASS Inoperable.Caused by Failure of Offgas Flush/Purge Control Handswitch HS0101. Handswitch Replaced & Post Maintenance Retesting Was Initiated ML17313A5301998-07-31031 July 1998 Monthly Operating Repts for July 1998 for Pvgns,Units 1,2 & 3.W/980812 Ltr ML17313A5201998-07-30030 July 1998 LER 98-004-00:on 980630,personnel Discovered That Pressure Safety Valve Had Not Received Periodic Set Pressure Test for ASME Class 1 Pressure Safety Valve.Caused by Personnel Error.Pressure Safety Valve reviewed.W/980730 Ltr ML17313A5791998-07-0707 July 1998 to PVNGS SG Tube ISI Results for Seventh Refueling Outage Mar & Apr 1998. ML17313A5001998-06-30030 June 1998 Monthly Operating Repts for June 1998 for Palo Verde Nuclear Generating Station,Units 1,2 & 3.W/980710 Ltr ML17313A4671998-06-19019 June 1998 LER 98-007-00:on 980520,CR Personnel Observed Flow & Pressure Perturbations on Chemical & Vol Control Sys Letdown Sys.Caused by Cyclic Fatigue Due to Dynamic Pressure Transients.Unit Letdown Piping Replaced ML17313A4521998-06-19019 June 1998 Rev 5 to COLR for Pvngs,Unit 3. ML17313A4501998-06-19019 June 1998 Rev 4 to COLR for Pvngs,Unit 3. ML17313A4131998-06-0505 June 1998 LER 98-006-00:on 980507,determined That Plant Was Outside Design Basis Due to SI Discharge Check Valve Reverse Flow. Check Valve Was Disassembled,Examined & Reassembled, Whereupon Valve Met Acceptance Criteria ML17313A4211998-05-31031 May 1998 Monthly Operating Repts for May 1998 for Pvngs,Units 1,2 & 3.W/980609 Ltr ML17313A3951998-05-26026 May 1998 LER 98-005-00:on 980428,noted That Required Response Time Testing Had Not Been Performed.Caused by Personnel Error. Coached I&C Personnel Responsible for Reviewing Work Authorization Documentation ML17313A3691998-04-30030 April 1998 Monthly Operating Repts for Apr 1998 for PVNGS.W/980412 Ltr ML17313A3251998-04-0101 April 1998 LER 98-004-00:on 980304,safety Valves as-found Pressures Out of Tolerance.Cause of Event Is Under Investigation.Three Mssv'S & Psv Will Be Replaced W/Refurbished & Recertified Valves During Refueling Outage U1R7 1999-09-30
[Table view] |
Text
ENCLOSURE 1 MONTHLYOPERATING REPORTS FOR JUNE 1995 9507190336 950713 PDR ADDCK 05000528 R PDR
J NRC MONTHLYOPERATING REPORT DOCKET NO.
UNIT NAME 22HG&i DATE QZL12LK COMPLETED BY dJX~Qll 1 Unit Name: Palo Verde Nuclear Generating Station, Unit 1 2 Reporting Period: June 1995 3 Licensed Thermal Power (MWt): 3800 4 Nameplate Rating (Gross MWe): 1403 5 Design Electrical Rating (Net MWe): 1270 6 Maximum Dependable Capacity (Gross MWe): 1303 7 Maximum Dependable Capacity (Net MWe): 1221 8 If Changes Occur In Capacity Ratings (Item Numbers 3 Through 7)
Since Last Report, Give Reasons: N/A 9 Power Level to Which Restricted, If Any (Net MWe): None 10 Reasons For Restrictions, If Any: N/A
'::,:::;:::::,Cu<<Nttfitive,'::l':;::!:
'4j~ c: ': ' Ki 'x x'.",i';.,"g':"w
- jHo'i'i@fif:,Rep'oitiiig:'Pe'rjod'j;-:i;::.:'::::::;:>!P5!)<$
.::l.:.;.:",:, i'! 4,344 82,584 12.:::',Ha'i'irs'iRea'ctor wis.:',Crltlcaf.".:::::::.4'4NNNNN!N~3(.':l':%:"'::::.:::::J.:,':::::::::;:::::N 720.0 3,010.3 53,643.1
- 13. fRe'iktOr.;.Bee<<errve':8hiitdOW'iiHOiire5NI~4(,:,.'.::;,: .':';.:.'::.:,;:;.;:,,:::,':;::, 0.0 0.0 0.0 14.::.,Ho'urs:.'Be'nba<<tor'".w'as',::.Oii';-:Uri'e,;::,.'"..":.;::::Ii::::;:::.:.:.:flair, jg',mill'3:,:.,::::.':;.',:,",':, 711.7 2,950.2 52,606.8 15.::::::Unit:::Reserve@bNdowii';Ho'ii'rs'.'.:;:l':':::::::'::."'!::I::':':':"::l i':,"F~kw""::4 0.0 0.0 0.0
- 16. ',::8i'oss',Tti4rNil:,.'Eii'e'rg""~ceiii'iate8."IIIIIII/O):'".:.";,';:::,::::! 2,522,346 10,646,782 189,728,800
- 17. ':;:.:,Gross',Efiict'rIi'i!~6ri$rjj'.,Gene@ted', MNH PXg;',";:l!:;,::::':!'::.:.':!:,,:.',,: 859,400 3,660,800 65,707,300
- 18. ',::Ni..t.::.:6ti! 808,327 3,432,736 61,663,642 CtriC%il;:.Eni.'r",:',Geiterated::(!%/t4!H)'::,~"..:":.:':,";::::;::.':l:..':".::,::::::::I:;::;.,'9.:::;,:Uj1t::,:S'ervti:4:.Pictor:,(ok);:,:::,.:;;~~":"'l""':i":::"'I)%N""":i::
98.8% 67 9% 63 7%
':IFacto'r,lo 63 7%
'.':-:"::::.'0.:.:;Viilt::,'A'vallabill
'.::::..:::.::.:.:,.':,':,.:.'r',,::::>.:,::!W;",'A4;::':::":;.:,::;::,;:'::::::,:'.'.: 98.8% 67 9 91.9% 64 7% 61 2%
- 22. I:Uiilt,,Capi'clfy'.:::,Facto<<r';::,(UsiiIQ.':.DER::.::Net):',:.::<'M',,':"-:::::::::,,':;:;,!:,;,,-RM! 88 4% 62.2% 58.8%
':'.:;.::.:,:.::.,':';:/ding!::::.:::.'.:.,:::::,::;:::;,,'::::::i":i.'20
- 23. NUii'it'Fgi'c'ed:.'..:Outige':;,Rate: :<<j~::;::,::.::I".:;:;.:!:.! 1 '2<<io 1.1% 12.9%
t 24 Shutdowns Scheduled Over Next 6 Months (Type, Date and Duration of Each): N/A A
25 If Shutdown At End of Report Period, Estimated Date of Start-up: N/A
, Forecast Achieved 95lK Q525LK QEK 1185
AVERAGE DAILYUNIT POWER LEVEL DOCKET NO. $ 4526 UNIT NAME PVVll~
DATE QZL12LK COMPLETED BY ~MI~
ERLBIJHZ MONTH: June 1995 DAY AVERAGE DAILYPOWER LEVEL DAY AVERAGE DAILYPOWER LEVEL 84 17 1232 638 18 1232 824 19 1235 832 20 1225 853 21 1231 1157 22 1225 1227 23 1233 1231 24 1225 1227 25 1231 10 1221 26 1225 1230 27 1224 12 1230 28 1230 13 1219 29 1229 14 1227 30 1227 15 1229 31 16 1242
1 REFUELING INFORMATION DOCKET NO. ~gQ UNIT NAME DATE QZl12LK COMPLETED BY JJ2&UHQQ HIUHJH71 Scheduled date for next refueling shutdown.
The 6th refueling outage is scheduled to begin on 09/07/96.
Scheduled date for restart following refueling.
11/01/96.
Will refueling or resumption of operation thereafter require a Technical Specification change or other license amendments No Scheduled date for submitting proposed licensing action and supporting information.
5/20/96 Important Licensing considerations associated with refueling, e.g., new or different fuel design'or supplier, unreviewed design or performance analysis methods, significant changes in fuel design, and new operating procedures.
None.
The number of fuel assemblies.
b) In the spent fuel storage pool.
Licensed spent fuel storage capacity.
Intended change in spent fuel storage capacity. ~c Projected date of last refueling that can be discharged to spent fuel storage pool assuming preserit capacity.
2005 (18 Month reloads and full core discharge capability).
I
SUMMARY
OF OPERATING EXPERIENCE FOR THE MONTH DATE 'ZL DOCKET NO.
UNIT NAME COMPLETED BY SLGZG EEKi&1 1285
~UDQQ HRIMJllu 0601 0000 Unit began the month in Mode 1. Rx power at 13%. Performing Rx start-up.,
0601 0817 Synchronized the generator to the grid.
0601 1855 Completed swap over, Rx power at 18%.
0601 2330 Commenced Rx power increase to 70%.
0602 1412 Rx power stabilized at 69%.
0604 0400 Testing completed at 70% Rx power, commenced Rx power increase to 100%.
0606 0423 Holding Rx power at 90% due to increasing sulfates indication in SG¹1 L SG¹2.
0606 1220 Commenced Rx power increase to 100%.
0606 1600 Rx power stabilized at 100%.
0630 2230 Rx power decreased to 99% due to MMIS pre-trip during Main start of stop valve testing, Tcold was at 555.5 deg. F, Rx power at 100%.
0630 2400 Unit ended the month in Mode 1 with Rx power at 99%, increasing to 100%.
4-
SHUTDOWNS AND POWER REDUCTIONS June 1995 DOCKET NO SL525 UNIT NAME ~PVN -1 DATE Q77/12/ 5 COMPLETED BY ~J. D. Pul on Outage Method of Duration Shutting Down System Component Cause and Corrective Action No. Date Type" Hours Reason2 Reactor3 LER No. Code4 Code5 to Prevent Occurrence 95-02 05/30/95 8.3 N/A N/A N/A Continuation of automatic reactor trip on SG ¹2 low level due to FWIV fast closing.
1F-Forced Reason: 3Method: 4Exhibit F - Instructions for Preparation S-Scheduled A-Equipment Failure(Explain) 1-Manual of the Data Entry Sheets for Licensee B-Maintenance or Test 2-Manual Scram Event Report (LER) File (NUREG 0161)
C-Refueling 3-Automatic Scram
,D-Regulatory Restriction 4-Continuation from Previous Month E-Operator Training & License 5-Reduction of 20% or Greater in the Exhibit H-Same Source Examination Past 24 Hours F-Administrative 9-Other-(Explain)
G-Operational Error H-Other (Explain)
'l I
f AVERAGE DAILYUNIT POWER LEVEL DOCKET NO. ~29 UNIT NAME ~5K~
DATE QZl1ZK COMPLETED BY JJ;)~go MONTH: June 1995 DAY AVERAGE DAILYPOWER LEVEL DAY AVERAGE DAILYPOWER LEVEL 1253 17 1256 1252 18 1258 1246 19 1256 1254 20 1255 1252 21 1256 1255 22 1256 1254 23 1254 1257 24 1250 1256 25 1251 10 1253 26 1250 1253 27 1249 12 1251 28 1248 13'251 29 1249 14 1252 30 1251 15 1253 31 16 1255
'C REFUELING INFORMATION DOCKET NO.
NAME MbQR2
/~2'NIT DATE QZL12LK COMPLETED BY ~UltQQ ernreltko Scheduled date for next refueling shutdown.
The 6th refueling outage is scheduled for 03/16/96 Scheduled date for restart following refueling.
05/10/96.
Will refueling or resumption of operation thereafter require a Technical Specification change or other license amendment?
Technical Specification change to Note 5 of Table 4.3-1 for the proposed installation of a cycle independent shape annealing matrix.
Scheduled date for submitting proposed licensing action and supporting information.
12/08/95.
Important Licensing considerations associated with refueling, e.g., new or different fuel design or supplier, unreviewed design or performance analysis methods, significant changes in fuel design, and new operating procedures.
Stretch Power to 102%.
e) tn the core. ~
The number of fuel assemblies.
b) In the spent fuel storage pool. ~
Licensed spent fuel storage capacity. ~29 Intended change in spent fuel storage capacity. ~~
Projected date of last refueling that can be discharged to spent fuel storage pool assuming present capacity.
2005 (18 Month reloads and full core discharge capability).
0 0 t
I
t t
SUMMARY
OF OPERATING EXPERIENCE FOR THE MONTH DOCKET NO. ~29 UNIT NAME DATE QZL12LK COMPLETED BY ~~fan LIHJtlll 0601 0000 Unit began the month in Mode 1 at 100% Rx power 0630 2400 Unit ended the month in Mode 1 at 100% Rx power.
SHUTDOWNS AND POWER REDUCTIONS June 1995
~29 DOCKET NO UNIT NAME DATE
~PV i~
Q7/12/I COMPLETED BY J- D F~l Outage Method of Duration Shutting Down System Component Cause and Corrective Action No. Date Type" Hours Reason2 Reactor3 LER No. Code4 Code5 . to Prevent Occurrence No reactor shutdowns or significant power reductions occurred during the month of June, 1995.
"F-Forced 2R 3Method: 4Exhibit F - Instructions for Preparation S-Scheduled A-Equipment Failure(Explain) 1-Manual of the Data Entry Sheets for Licensee B-Maintenance or Test 2-Manual Scram Event Report (LER) File (NUREG 0161)
C-Refueling 3-Automatic Scram D-Regulatory Restriction 4-Continuation from Previous Month E-Operator Training 8 License 5-Reduction of 20% or Greater in the Exhibit H-Same Source Examination Past 24 Hours F-Administrative 9-Other-(Explain)
G-Operational Error H-Other (Explain)
V
'll
F'
't
'I I
AVERAGE DAILYUNIT POWER LEVEL DOCKET NO. 59-'QQ UNIT NAME '@VV'~
DATE QZL12LK COMPLETED BY JJ2~fgO MONTH: June 1995 DAY AVERAGE DAILYPOWER LEVEL DAY AVERAGE DAILYPOWER LEVEL 1249 17 1256 1248 18 1254 1250 19 1253
'4 1248 20 1253 1078 21 1255 1065 22 1252 1135 23 1253 1259 1251 1259 25 1249 10 1255 26 1249 1251 27 1248 12 1251 28 1247 13 1251 29 1243 14 1251 30 1247 15 1251 31 16 1252
REFUELING INFORMATION DOCKET NO., QL53Q UNIT NAME 22HGR2 DATE QZL12LK COMPLETED BY J D~QQ Scheduled date for next refueling shutdown.
The 5th refueling outage is scheduled to begin 10/14/95.
Scheduled date for restart following refueling.
12/23/95.
Will refueling or resumption of operation thereafter require a Technical Specification change or other license amendment?
Technical Specification change to Note 5 of Table 4.3-1 for the proposed installation of a cycle independent shape annealing matrix. (submitted 12/7/94 to NRC).
- b. Technical Specification change to revise list of analytical methods in 6.9.1.10.
Technical Specification changes to Section 5, Design Features.
Exemption to 10CFR50.44, 10CFR50.46, 10CFR50 App. K to allow use of one lead fuel assembly with fuel rods clad with advanced zirconium based alloy.
Scheduled date for submitting proposed licensing action and supporting information.
Submittal is planned for July 21, 1995 to revise the list of analytical methods in Technical Specification 6.9.1.10.
Submittal is planned for August 18, 1995 to revise Technical Specification Section 5.
Submittal is planned for September 15, 1995 to request 10CFR50 exemptions.
Important Licensing considerations associated with refueling, e.g., new or different fuel design or supplier, unreviewed design or performance analysis methods, significant changes in fuel design, and new operating procedures.
~
None.
The number of fuel assemblies.
b) In the spent fuel storage pool.
ly.
Intended change in spent fuel storage capacity.
Projected date of last refueling that can be discharged to spent fuel storage pool assuming present capacity.
C 2005 (18 Month reloads and full core discharge capability).
~ 0
SUMMARY
OF OPERATING EXPERIENCE FOR THE MONTH DOCKET NO. K=HO UNIT NAME /VVI~
DATE QZLQLK COMPLETED BY JJ2M6tcn Junc.~
0601 0000 Unit began the month in Mode 1 at 100/a power.
0604 2230 Commenced Rx power decrease to 85/o for removal LP FWH Train A due to a tube leak in 1A.
0605 0430 Rx power stabilized at 100'lo.
l 0607, 1350 Commenced Rx power increase to 100'/0.
0607 1600 Rx returned to 100/0 power.
0630 2400 Unit ended the month in Mode 1, Rx power at 100 /0.
SHUTDOWNS AND POWER REDUCTIONS June 1995 DOCKET NO 50-530 UNIT NAME ~JUGS-3 DATE Q~)/95 COMPLETED BY ~D~uo -
Outage Method of Duration Shutting Down System Component Cause and Corrective Action Date Type" Hours Reason2 Reactor3 LER No. Code4 Code5 to Prevent Occurrence No reactor shutdowns or significant power reductions occurred during the month of June, 1995.
1F Forced 2Reason. 3Method: 4Exhibit F - Instructions for Preparation S-Scheduled A-Equipment Failure(Explain) 1-Manual of the Data Entry Sheets for Licensee B-Maintenance or Test 2-Manual Scram Event Report (LER) File (NUREG 0161)
C-Refueling 3-Automatic Scram D-Regulatory Restriction 4-Continuation from Previous Month E-Operator Training & License 5-Reduction of 20% or Greater in the Exhibit H-Same Source Examination Past 24 Hours F-Administrative 9-Other-(Explain)
G-Operational Error H-Other (Explain) j