Rev to MOR for Apr 1996 for PVNGS Unit 1
ML17312A919
Person / Time
Site: Palo Verde Arizona Public Service icon.png
Issue date: 04/30/1996
From: Fulton J
ARIZONA PUBLIC SERVICE CO. (FORMERLY ARIZONA NUCLEAR
To:
Shared Package
ML17312A917 List:
References
NUDOCS 9608200100
Download: ML17312A919 (4)


Text

Revised Page for April 1996 9b08200i00 9b08i3 PDR ADQCK 05000528 R

PDR

Ji

~ '

NRC MONTHLYOPERATING REPORT CORRECTED COPY DOCKET NO.

SL526 UNIT NAME Mba~

DATE ZLZZ COMPLETED BY ~glfQQ RLKIJtRE 1.

Unit Name:

Palo Verde Nuclear Generating Station, Unit 1 2.

Reporting Period:

April 1996 3.

LicensedThermalPower(MWt):

3800 4.

Nameplate Rating (Gross MWe):

1403 5.

Design Electrical Rating (Net MWe):

1249 6.

Maximum Dependable Capacity(Gross MWe):

1299 7.

Maximum Dependable Capacity (Net MWe):

1227 8.

IfChanges Occur In Capacity Ratings (Item Numbers 3 Through 7)

Since Last Report, Give Reasons:

N/A 9.

Power Level to Which Restricted, IfAny (Net MWe):

None 10.

Reasons For Restrictions, IfAny:

N/A Unit 1 Generating Statistics 11.

Hours in Re orting Period 12.

Hours Reactor was Critical 13.

Reactor Reserve Shutdown Hours 14.

Hours Generator was On-Line 15.

Unit Reserve Shutdown Hours 16.

Gross Thermal Energy Generated (MWH) 17.

Gross Electrical Energy Generated (MWH) 18.

Net Electrical Energy Generated (MWH) 19.

Unit Service Factor (%)

20.

Unit AvailabilityFactor (%)

21.

Unit Capacity Factor (Using MDC Net) 22.

Unit Capacity Factor (Using DER Net) 23.

Unit Forced Outage Rate (%)

This Month 720 364.1 0.0 363.4 0.0 1,373,041 472,900 444,198 50.5%

50.5%

49.7%

48 8%

pp Yr. to Date 2,904 2,448.1 0.0 2,378.1 0.0 8,986,110 3,090,200 2,906,111 81 9%

81.9%

81.4%

80.0%

6.6%

Cumulative 89,904 60,411.1 0.0 59,281.2 0.0 214,522,314 74,200,700 69,663,832 65 9%

65 9%

63 5%

61.0%

12 0%

24.

Shutdowns Scheduled Over Next 6 Months (Type, Date and Duration of Each):

scheduled for 9/7/96 through 10/27/96 (50 days).

6th Refueling outage is 25.

IfShutdown At End of Report Period, Estimated Date of Start-up:

N/A INITIALCRITICALITY INITIALELECTRICITY COMMERCIALOPERATION Forecast 955K Q6lK Achieved 95!25LK

0 0

y

~ <