,~cczr.za.hr~a Orsra.~am rOW ozivro~, a.~now SvSIZrvr REGULBTZ ZNFORMBTZON DZSTRZBUTZON ZSTEM (RZDS)
ACCES~IOP /BR:9210280283 DOC.DATE: 92/10/22 NOTARIZED: NO DOCKET FACIL:50-400 Shearon Harris Nuclear Power Plant, Unit 1, Carolina 05000400 AUTH. NAME AUTHOR AFFILIATION MCCARTHY,D.C. Carolina Power a Light Co.
RECIP.NAME RECIPIENT AFFILIATION Document Control Branch (Document Control Desk)
SUBJECT:
Forwards summary of ECCS outage times covering 5-yr period commencing w/issuance of low power OL on 861024 & ending on 911023 to address NUREG-0737,Item II.K.3.17, "Rept on Outages of ECCS Sys."
D DISTRIBUTION CODE: A003D COPIES RECEIVED:LTR I ENCL ( SIZE: t TITLE: OR/Licensing Submittal: Suppl 1 to NUREG-0737(Generic Ltr 82-33)
NOTES:Application for permit renewal filed. 05000400 i RECIPIENT COPIES RECIPIENT COPIES ID CODE/NAME LTTR ENCL ID CODE/NAME LTTR ENCL PD2-1 LA 1 1 PD2-1 PD 1 1 LE,N 2 2 INTERNAL: NRR/DLPQ/LHFB11 1 1 OC/LFMB 1 0 PE 01 1 1 RES/DSIR/EIB 1 1 EXTERNAL: NRC PDR 1 1 NSIC 1 1 NOTE TO ALL "RIDS" RECIPIENTS:
PLEASE HELP US TO REDUCE WASTE! CONTACT THE DOCUMENT CONTROL DESK.
ROOM Pl-37 (EXT. 504-2065) TO ELIMINATEYOUR NAME FROM DISTRIBUTION S
LISTS FOR DOCUMENTS YOU DON'T NEED!
TOTAL NUMBER OF COPIES REQUIRED: LTTR 10 ENCL 9
I Ii p
@ME Carolina Power 8 Light Company OCT 32 1992 SERIAL: NLS 288 United States Nuclear Regulatory Commission ATTENTION: Document Control Desk Washington, DC 20555 SHEARON HARRIS NUCLEAR POWER PLANT DOCKET NO. 50-400/LICENSE NO. NPF-63 NUREG-0737, Item II.K.3.17; REPORT ON OUTAGES OF ECCS SYSTEMS Gentlemen:
NUREG-0737, "Post TMI-Requirements," Item II.K.3.17 "Report on Outages of Emergency Core-Cooling Systems Licensee Report and Proposed Technical Specification Changes" dated October 31, 1980, requires licensees and applicants to submit an Emergency Core Cooling System (ECCS) outage history for a five year period.
The attached data represents a summary of the Shearon Harris Nuclear Power Plant (SHNPP) ECCS outage times (component and system). The data covers the five year period commencing with the issuance of the low power operating license on October 24, 1986 and ending October 23, 1991. It includes required maintenance and surveillance testing and was obtained from Equipment Inoperable Records and the Surveillance Test Scheduling System (STSS). The data obtained from STSS for duration is estimated based on average performance time.
Attachment 1 provides the: a) Outage dates and durations (in hours) b) Cause of each outage c) ECC System or components involved d) Corrective actions, as applicable Attachment 2 is a glossary of terms and abbreviations used in Attachment l.
Safety system availability is tracked and reported monthly to the Institute of Nuclear Power Operations (INPO) in accordance with the guidance provided by INPO. Improvements have been accomplished in recent years by scheduling testing and maintenance outages concurrently. Carolina Power & Light Company (CP&L) is committed to ensure the highest safety system availability and performance possible, given the necessary preventive maintenance, corrective maintenance, and required surveillance test:s.
Carolina Power & Light Company has reviewed the availability of ECCS systems and components and concludes that no Technical Specification changes are warranted.
28062g
'-ayettevilte Street ~ P. O. 8ox 1551 o Raleigh, N. C. 27602
'7210280283 921022 PDR ADOCK 05000400 P PDR
4
$ W
Document Control Desi~
'~ ~VLS-92-288 / Page 2 This report fulfills CPGL's commitment as documented in the SHNPP Final Safety Analysis Report for NUREG-0737, Item II.K.3.17.
Questions regarding this matter may be referred to Mr. R. W. Prunty at (919) 546-7318.
Yours very truly, D. C. McCarthy Manager Nuclear Licensing Section SDC/sdc cc: Mr. S. D. Ebneter Mr. N. B. Le Mr. J. E. Tedrow
~ ~ I Page 1 ATTACHMENT 1 DATE DURATION CAUSE SYSTEH/COHPONENT CORRECTIVE ACTION 10/24/86 'I ~ 50 OST-'1073 1B-SB EDG OPERABILITY MONTHLY INTERVAL EDG B EDG PERFORH 3 AIR ROLLS - 1 PRE-TEST & 2 POST-TEST 10/24/86 1.50 OST-1086 18-SB EDG OPERABILITY SEHIANNUALLY EDG 8 EDG PERFORH 3 AIR ROLLS - 1 PRE-TEST & 2 POST-TEST 10/27/86 1.50 OST-1823 1A-SA EDG OPERABILITY 18 MONTH EDG A EDG PERFORH 3 AIR ROLLS - 1 PRE-TEST & 2 POST-TEST 10/27/86 1.50 OST-1823 1A-SA EDG OPERABILITY 18 MONTH EDG A EDG PERFORM 3 AIR ROLLS - 1 PRE-TEST & 2 POST-TEST 10/27/86 1.50 OST-1085 1A-SA EDG OPERABILITY SEMIANNUALLY EDG A EDG PERFORM 3 AIR ROLLS - 1 PRE-TEST & 2 POST-TEST 11/07/86 1 ~ 50 OST-1085 1A-SA EDG OPERABILITY SEHIANHUALLY EDG A EDG PERFORH 3 AIR ROLLS - 1 PRE-TEST & 2 POST-TEST 11/07/86 1.50 OST-1013 1A-SA EDG OPERABILITY MONTHLY INTERVAL EDG A EDG PERFORH 3 AIR ROLLS - 1 PRE-TEST & 2 POST-TEST 1.50 OST.1824 1B-SB EDG OPERABILITY 18 HONTH EDG B EDG PERFORM 3 AIR ROLLS - 1 PRE-TEST & 2 POST-TEST 11/11/86
'I1/11/86 1.50 OST-1824 1B-SB EDG OPERABILITY 18 HONTH EDG B EDG PERFORH 3 AIR ROLLS - 1 PRE-TEST & 2 POST-TEST 1.50 OST-1086 1B-SB EDG OPERABILITY SEHIANNUALLY EDG 8 EDG 'PERFORH 3 AIR ROLLS - 1 PRE-TEST & 2 POST-TEST 11/11/86 11/13/86 1.50 OST-1823 1A-SA EDG OPERABILITY 18 HONTH EDG A EDG PERFORM 3 AIR ROLLS - 1 PRE-TEST & 2 POST-TEST 11/13/86 1.50 OST-1823 1A-SA EDG OPERABILITY 18 MONTH EDG A EDG PERFORH 3 AIR ROLLS - 1 PRE-TEST & 2 POST-TEST 11/18/86 0.97 A CSIP INOP FOR MAINTENAHCE ECCS A CSIP COMPLETE MAINTENANCE AND TEST 11/19/86 1.50 OST-1073 1B-SB EDG OPERABILITY MONTHLY INTERVAL EDG 8 EDG PERFORM 3 AIR ROLLS - 1 PRE-TEST & 2 POST-TEST 12/01/86 1.50 OST-1085 1A-SA EDG OPERABILITY SEMIANNUALLY EDG A EDG PERFORH 3 AIR ROLLS - 1 PRE-TEST & 2 POST-TEST 12/10/86 1.50 OST-1013 1A-SA EDG OPERABILITY MONTHLY INTERVAL EDG A EDG PERFORH 3 AIR ROLLS - 1 PRE-TEST & 2 POST-TEST 12/21/86 1 ~ 50 OST-1073 18-SB EDG OPERABILITY HONTHLY INTERVAL EDG B EDG PERFORM 3 AIR ROLLS - 1 PRE-TEST & 2 POST-TEST 12/25/86 0.50 OST-'1008 RHR PUHP OPERABILITY QUARTERLY INTERVAL ECCS 8 RHR COMPLETE SCHEDULED TEST 12/25/86 0.50 OST-1008 RHR PUHP OPERABILITY QUARTERLY INTERVAL ~ ECCS A RHR COMPLETE SCHEDULED TEST 01/04/87 0.50 OST-1008 RHR PUMP OPERABILITY QUARTERLY INTERVAL ECCS A RHR COHPLETE SCHEDULED TEST 01/04/87 0.50 OST-1008 RHR PUHP OPERABILITY QUARTERLY INTERVAL ECCS 8 RHR COHPLETE SCHEDULED TEST 01/08/87 1.50 OST-1013 1A-SA EDG OPERABILITY MONTHLY INTERVAL EDG A EDG PERFORM 3 AIR ROLLS - 1 PRE-TEST & 2 POST-TEST 01/20/87 1.50 OST-1073 1B-SB EDG OPERABILITY MONTHLY INTERVAL EDG 8 EDG PERFORH 3 AIR ROLLS - 1 PRE-TEST & 2 POST-TEST 01/21/87 5.92 PLACED IN MAIN'IENANCE TO SUPPORT S/U TESTING EDG A EDG COHPLETE S/U TESTING 01/22/87 8.58 AH-10A UNIT WAS INOPERABLE ECCS C CSIP/AH-10A COHPLETE CORRECTIVE MAINTENANCE 01/23/87 0.92 8 CHILLER FAILED TO START ECCS 8 CSIP/ESCWC REFERENCE LER 87-006 FOR CORRECTIVE ACTION 01/25/87 5.25 RWST USED FOR EPT-039T, LEVEL BELOW T ~ S. LIMIT ECCS RWST RESTORE LEVEL ABOVE TS LIMIT 02/09/87 1.50 OST-1013 1A-SA EDG OPERABILITY MONTHLY INTERVAL EDG A EDG PERFORH 3 AIR ROLLS - 1 PRE-TEST & 2 POST-TEST 02/10/87 5.33 8 CHILLER INOP DUE TO LOW LUBE OIL WITH A CHILLER INOP ECCS 8 CSIP/ESCWC REFERENCE LER 87-007 FOR CORRECTIVE ACTION 02/20/87 8.75 INOPERABLE TO INSPECT GE TYPE HFA RELAYS EDG A EDG COHPLETE INSPECTION AND TEST 02/21/87 1.50 OST-1086 1B-SB EDG OPERABILITY SEHIANHUALLY EDG 8 EDG PERFORH 3 AIR ROLLS - 1 PRE-TEST & 2 POST-TEST 02/21/87 1.50 OST-1073 1B-SB EDG OPERABILITY MONTHLY INTERVAL EDG B EDG PERFORH 3 AIR ROLLS - 1 PRE-TEST & 2 POST-TEST 03/09/87 1.50 OST-1013 1A-SA EDG OPERABILITY MONTHLY INTERVAL EDG A EDG PERFORM 3 AIR ROLLS - 1 PRE-TEST & 2 POST-TEST 03/22/87 1.50 OST-1073 1B-SB EDG OPERABILITY MONTHLY INTERVAL EDG 8 EDG PERFORH 3 AIR ROLLS - 1 PRE-TEST & 2 POST-TEST 03/23/87 1 '0 OST-1013 1A-SA EDG OPERABILITY MONTHLY INTERVAL EDG A EDG PERFORH 3 AIR ROLLS - 1 PRE-TEST & 2 POST-TEST 03/29/87 0.50 OST-1008 RHR PUHP OPERABILITY QUARTERLY INTERVAL ECCS A RHR COMPLETE SCHEDULED TEST 03/29/87 0.50 OST-1008 RHR PUHP OPERABILITY QUAR'IERLY INTERVAL ECCS B RNR COHPLETE SCHEDULED TEST 04/06/87 1.50 OST-1013 1A-SA EDG OPERABILITY MONTHLY INTERVAL EDG A EDG PERFORH 3 AIR ROLLS - 1 PRE-TEST & 2 POST-TEST
g ~
Page 2 ATTACHMENT 1 DATE DURATION CAUSE SYSTEM/COMPONENT CORRECTIVE ACTION 04/20/87 'I.25 C CSIP INOP DUE TO HISPOSITIONED ALT. MINI FLOW VALVES ECCS C CSIP REFERENCE LER 87-023 FOR CORRECTIVE ACTION 04/23/87 1.50 OST-1073 1B-SB EDG OPERABILITY MONTHLY INTERVAL EDG B EDG PERFORH 3 AIR ROLLS - 1 PRE-TEST 8 2 POST-TEST 05/07/87 8.23 FAILURE OST-1085 DUE TO TIHE ARB FOR FREQ TO REACH REQUIRED BAND EDG A EDG COMPLETE RETEST 05/07/87 1.50 OST-1013 1A-SA EDG OPERABILITY MONTHLY INTERVAL EDG A EDG PERFORH 3 AIR ROLLS - 1 PRE-TEST 8 2 POST-TEST 1.50 OST 1085 1A-SA EDG OPERABILITY SEMIANNUALLY EDG A EDG PERFORH 3 AIR ROLLS - 1 PRE-TEST 8 2 POST-TEST 05/07/87 05/18/87 4.83 CHANGE OIL IN PUHP ECCS A CSIP COMPLETE MAINTENANCE ACTIVITY 6 50 CHANGE LUBE OIL~ INSPECT ~ TIGHTEN FITTINGS OIL LINES ECCS C CSIP COMPLETE MAINTENANCE ACTIVITY 05/19/87 ON 05/20/87 1 ~ 07 VALVED OOS TO ALLOW TESl'ING OF CSIP 8 ECCS 8 CSIP COMPLETE TEST 0.08 EDG A EDG COMPLETE INSTALLATION OF BARRING DEVICE 05/22/87 BARRING DEVICE INSTALLED 1.50 OST-1073 18-SB EDG OPERABILITY MOHTHLY IHTERVAL EDG B EDG PERFORH 3 AIR ROLLS - 1 PRE-TEST 8 2 POST-TEST 05/22/87 9.09 EDG 8 EOG REFERENCE LER 87-033 FOR CORRECTIVE ACTION 06/07/87 MISSED AIR ROLL 06/07/87 1.50 OST-1013 1A-SA EDG OPERABILITY MONTHLY INTERVAL EDG A EDG PERFORH 3 AIR ROLLS - 1 PRE-TEST 8 2 POST-TEST 06/12/87 0.50 OST-1008 RHR PUHP OPERABILITY QUARTERLY INTERVAL ECCS A RHR COMPLETE SCHEDULED TEST 0.50 OST-1008 RNR PUMP OPERABILITY QUARTERLY INTERVAL ECCS 8 RKR COMPLETE SCHEDULED TEST 06/12/87 06/21/87 1.50 OST-1013 1A-SA EDG OPERABILITY HONTHLY INTERVAL EDG A EDG PERFORH 3 AIR ROLLS - 1 PRE-TEST 8 2 POST-TEST 06/23/87 1 ~ 50 OST-1073 1B-SB EDG OPERABILITY MON'INLY INTERVAL EDG 8 EDG PERFORH 3 AIR ROLLS - 1 PRE-TEST 8 2 POST-TEST 07/02/87 0.95 INADVERTANTLY DRAINED RWST LEVEL BELOW T.S. LIMIT ECCS RWST COMPLETE FILL OF R'WST BACK INTO T.S. LIMIT 07/08/87 1 50 OST-1073 18-SB EDG OPERABILITY MONTHLY INTERVAL EDG B EDG PERFORH 3 AIR ROLLS - 1 PRE-TEST 8 2 POST-TEST PERFORH 3 AIR ROLLS - 1 PRE-TEST 8 2 POST-TEST
~
07/08/87 1.50 OST-1013 1A-SA EDG OPERABILITY MOHTHLY INTERVAL EDG A EDG 07/?3/87 1.50 OST-1073 1B-SB EDG OPERABILITY MONTHLY INTERVAL EDG 8 EOG PERFORH 3 AIR ROLLS - 1 PRE-TEST 8 2 POST-TEST 1.50 OST-1086 1B-SB EDG OPERABILITY SEHIAHNUALLY EDG 8 EDG PERFORM 3 AIR ROLLS - 1 PRE-TEST 8 2 POST-TEST 07/23/87 08/06/87 0.50 OST-1008 RHR PUHP OPERABILITY QUARTERLY INTERVAL ECCS B RHR COMPLETE SCHEDULED TEST 08/06/87 F 50 PERFORMANCE OF EPT-072 AND MPT-10032 ECCS 8 RHR/1RH-63 COMPLETE PERIODIC TESTS 08/06/87 0.50 OST-1008 RHR PUMP OPERABILITY QUARTERLY INTERVAL ECCS A RHR COMPLETE SCHEDULED TEST 08/08/87 6.42 BKR 106 WOULD HOT CLOSE FROM CONTROL PANEL EDG A EDG COMPLETE REPAIR OF BKR 106 1.50 OST-1073 1B-SB EDG OPERABILITY MONTHLY INTERVAL EDG B EDG PERFORM 3 AIR ROLLS - 1 PRE-TEST 8 2 POST-TEST 08/09/87 08/09/87 1.50 OST-1013 1A-SA EDG OPERABILITY MONTHLY INTERVAL EDG A EDG PERFORH 3 AIR ROLLS - 1 PRE-TEST 8 2 POST-TEST 08/23/87 F 50 OST-1073 18-SB EDG OPERABILITY MONTHLY INTERVAL EDG 8 EDG PERFORH 3 AIR ROLLS - 1 PRE-TEST 8 2 POST-TEST 09/08/87 1.50 OST-1013 1A-SA EDG OPERABILITY MONTHLY INTERVAL EDG A EDG PERFORH 3 AIR ROLLS - 1 PRE-TEST 8 2 POST-TEST 09/10/87 0.32 INOPERABLE TO PERFORM OST-1008 ECCS 8 RHR PUMP' COHPLETE SURVEILLANCE TEST OST-1008 09/11/87 0.50 OST-1008 RHR PUHP OPERABILITY QUARTERLY IHTERVAL ECCS RHR COMPLETE SCHEDULED TEST 09/11/87 0.50 OST-1008 RNR PUMP OPERABILITY QUARTERLY INTERVAL ECCS 8 RHR COMPLETE SCHEDULED TEST 09/20/87 21.70 A DG TRIPPED ON HIGH VIBRATION DURING OST-1823 EDG A EDG RECALIBRATE A DG VIBRATION SWITCH 09/22/87 1.50 OST-1823 1A-SA EDG OPERABILITY 18 MONTH EDG A EDG PERFORH 3 AIR ROLLS - 1 PRE-TEST 8 2 POST-TEST 09/22/87 1.50 OST-1823 1A-SA EDG OPERABILITY 18 MONTH EDG A EDG PERFORM 3 AIR ROLLS - 1 PRE-TEST 8 2 POST-TEST 09/23/87 1.50 OST-1073 1B-SB EDG OPERABILITY MONTHLY INTERVAL EDG 8 EDG PERFORH 3 AIR ROLLS - 1 PRE-TESj' 2 POST-TEST 10/09/87 1.50 OST-1013 1A-SA EDG OPERABILITY MONTHLY INTERVAL EDG A EDG PERFORH 3 AIR ROLLS - 1 PRE-TEST 8 2 POST-TEST 10/09/87 1.50 OST-1085 1A-SA EDG OPERABILITY SEHIANHUALLY EDG A EDG PERFORH 3 AIR ROLLS - 1 PRE-TEST 8 2 POST-TEST
~ t Page 3 ATTACHMENT 1 DATE DURATION CAUSE SYSTEH/COMPONENT CORRECTIVE ACTION 10/15/87 0.33 LOSS OF ALL RKR DURIKG VALVE TESTING ECCS A RHR- REFEREKCE LER 87-060 FOR CORRECTIVE ACTION 10/16/87 1.50 OST-1824 18-SB EDG OPERABILITY 18 HOHTH EDG 8 EDG PERFORM 3 AIR ROLLS - 1 PRE-TEST 8 2 POST-TEST 10/22/87 1.50 OST-1013 1A-SA EDG OPERABILITY MONTHLY INTERVAL EDG A EDG PERFORM 3 AIR ROLLS - 1 PRE-TEST F 2 POST-TEST 10/31/87 1.50 OST-1073 18-SB EDG OPERABILIT'Y MONTHLY INTERVAL EDG 8 EDG PERFORH 3 AIR ROLLS - 1 PRE-TEST F 2 POST-TEST 11/08/87 2.75 IKOP 1 EXHST FAN TO PROVIDE VENT FOR FUEL OIL TRNS PMP EDG B EDG RECALIBRATE FLOW SWITCH AKD RESTORED EXKST FAH 11/09/87 1.50 OST-1013 1A-SA EDG OPERABILITY MONTHLY INTERVAL EDG A EDG PERFORM 3 AIR ROLLS - 1 PRE-TEST 8 2 POST-TEST 11/10/87 11.67 1CS-746 FAILED CLOSED DUE TO LIMIT SMITCH FAILURE ECCS A CSIP/1CS-746 COMPLETE HAIHTENANCE ON SWITCH 20.50 ECCS 8 CSIP RAN CHILLER MANUALLY STROKED VALVE 11/16/87 WC-28 CHILLER INOP 0.20 KCR-87-'132 ON CSIP MIKIFLOW WIRING 1CS-196 ECCS 8 CSIP COMPLETE MODIFICATION 11/16/87 51.50 ES'W TRAIN 8 INOP FAILED PART OF OST-1215 EDG B EDG COMPLETE CORRECTIVE MAINTENANCE 11/17/87 1.50 OST-1013 1A-SA EDG OPERABILITY MONTHLY INTERVAL EDG A EDG PERFORH 3 AIR ROLLS - 1 PRE-TEST 8 2 POST-TEST 11/18/87 11/24/87 1.50 OST-1073 18-SB EDG OPERABILITY MONTHLY INTERVAL EDG 8 EDG PERFORM 3 AIR ROLLS - 1 PRE-TEST 8 2 POST-TEST 19.00 1CC-167 WILL NOT STROKE FULLY OPEH FROM MCB ECCS 8 RKR COMPLETE CORRECTIVE MAINTENANCE 11/24/87 12/02/87 24.50 1SW-270 MOV TRIPPED ON START OF A ESW PUMP EDG A EDG COMPLETE CORRECTIVE MAINTENANCE 12/10/87 1 ~ 50 OST-1013 1A-SA EDG OPERABILITY MONTHLY INTERVAL EDG A EDG PERFORM 3 AIR ROLLS - 1 PRE-TEST 8 2 POST-TEST 12/16/87 0.50 OST 1008 RKR PUMP OPERABILITY QUARTERLY INTERVAL ECCS A RKR COMPLETE SCHEDULED TEST 12/16/87 0.50 OST-1008 RHR PUMP OPERABILITY QUARTERLY INTERVAL ECCS 8 RHR COMPLETE SCKEDULED TEST 12/22/87 1.50 OST-1073 1B-SB EDG OPERABILITY MOHTKLY INTERVAL EDG B EDG PERFORM 3 AIR ROLLS - 1 PRE-TEST EE 2 POST-TEST 12/23/87 8.25 INSPECT BEARIHGS ON AH-5-SB ECCS B RHR/AH-5B COMPLETE INSPECTIONS 12/28/87 2.50 SUMP COVER REMOVED TO PUMP DOWN SUMP ECCS 8 RKR COMPLETE PUMP DOWN 01/04/88 1.87 PUHP SUMP COVER REMOVED ECCS 8 RKR REINSTALL SUMP COVER 01/10/88 1.50 OST-1013 1A-SA EDG OPERABILITY MONTHLY INTERVAL EDG A EDG PERFORM 3 AIR ROLLS - 1 PRE-TEST 8 2 POST-TEST 01/11/88 1.50 PUMP DOWH 8 CONTAINHEHT RECIRC SUMP ECCS 8 RHR COMPLETE PUHP DOWN 01/13/88 8.20 CHANGE OIL IN MOTOR BEARINGS ECCS 8 CSIP COMPLETE MAINTEHANCE 01/14/88 18.50 REMOVE PLUG FROM FLANGE AND STOP LEAK ON HEAT EXCHANGER ECCS A RKR HX COMPLETE CORRECTIVE MAINTENANCE 01/14/88 0.50 OST-1008 RHR PUMP OPERABILITY QUARTERLY INTERVAL ECCS 8 RHR COMPLETE SCHEDULED TEST 01/14/88 0.50 OST-1008 RKR PUMP OPERABILITY QUARTERLY INTERVAL ECCS A RKR COMPLETE SCHEDULED TEST 01/15/88 3.75 CLEAN STRAINER 8 FILTER ON PUMP B SPEED INCREASER ECCS A CSIP COMPLETE CORRECTIVE MAINTENAHCE 01/18/88 1.50 PUMP DOWN THE RECIRCULATION SUMP
- ECCS 8 RKR PUMP COMPLETE PUMP DOWN 01/20/88 1.50 OST-1086 18-SB EDG OPERABILITY SEHIANNUALLY EDG 8 EDG PERFORM 3 AIR ROLLS - 1 PRE-TEST B 2 POST-TEST 01/20/88 1.50 OST-1073 1B-SB EDG OPERABILITY MOHTHLY INTERVAL EDG 8 EDG PERFORM 3 AIR ROLLS - 1 PRE-TEST 8 2 POST-TEST 01/22/88 1.08 REMOVAL OF INDICATOR TO INSPECT STEM NUT PER MPT-M0082 ECCS A CSIP/1CS-746 COMPLETE INSPECTION PER MPT-0082 COMPLETE PUMP DOWN 02/01/88 3.75 1.50 PUMP DOWH THE RECIRCULATION SUMP OST-1013 1A-SA EDG OPERABILITY MONTHLY INTERVAL ECCS EDG B RKR A EDG PERFORM 3 AIR ROLLS
-' PRE-TEST 8 2 POST-TEST 02/06/88 02/08/88 21.47 PLACED UNDER SF CLEARANCE AS A RESULT OF ESW PUMP BEING INOP EDG 8 EDG/ES'W REFERENCE LER 88-006 FOR CORRECTIVE ACTION 02/15/88 1.43 PUHP DOWH THE RECIRCULATION SUHP ECCS 8 RKR COMPLETE PUMP DOWN 02/15/88 0.92 CHANGE DIFFERENTIAL RELAY EDG A EDG COMPLETE CORRECTIVE MAINTENAHCE 02/17/88 38.42 ESW PUMP FAILED TO START DURING INADVERTENT ACTUATION 0 F SEQUENCER EDG 8 EDG/ESW REFERENCE LER 88-008 FOR CORRECTIVE ACTION
Page 4 ATTACHHENI' DURATIOH CAUSE SYSTEH/COHPONENT CORRECTIVE ACTION DATE 02/'l7/88 38.42 CALIBRATION OF AGASTAT RELAY P1A2/1183 EDG B EDG COHPLETE CALIBRATION 1.50 OST-1073 18-SB EDG OPERABILITY MONTHLY INTERVAL EDG B EDG PERFORH 3 AIR ROLLS - 1 PRE-TEST 2 POST-TEST 02/19/88 02/20/88 8.42 EQ INSPECTION OF MOVES 1CS-292, 278, 169, 171 ECCS 8 CSIP COHPLETE INSPECTIONS 8.08 EQ INSP. OF HOV'S 1CS-168, 170, 291 ECCS A CSIP COHPLETE INSPECTIONS 02/21/88 02/26/88 4.33 INSPECTION OF HEAT SHRINK ON l}IRING, CLEARANCE REQ'D ECCS 8 CSIP/1CS-291 PERFORM Qc INSPECTION 03/04/88 0.58 ADJUST PACKING ECCS A CSIP/1CS-168 COHPLETE CORRECTIVE HAINTENANCE 2.40 PUHP DOWN THE RECIRCULATION SUMP ECCS B RHR COHPLETE PUHP DOWN 03/07/88 14.67 MST'S AND HAINTENANCE EDG A EDG COHPLETE TEST AND MAINTENANCE 03/07/88 1.50 OST-1013 1A-SA EDG OPERABILITY HONTHLY INTERVAL EDG A EDG PERFORH 3 AIR ROLLS - 1 PRE-TEST B 2 POST-TEST 03/08/88 1.00 RHR INOP.FOR HAINTENANCE ON AH-SA ECCS A RHR COHPLETE MAINTENANCE 03/09/88 12.20 PUHP DOWN THE RECIRCULATION SUMP ECCS 8 RHR COMPLETE PUHP DOWN 03/14/88 7.37 18-SB ESW UNDER CLEARANCE FOR EPT-101T EOG B EDG/ESW COMPLETE PERIODIC TEST 03/14/88 15.33 CHANGE OIL IN PUHP HOTOR ECCS A RHR COHPLETE HAINTENANCE 03/15/88 3.38 'IA-SA ESW INOP. FOR EPT-101T ECCS A EDG COHPLETE SCHEDULED TEST 03/16/88 15.87 CHANGE OIL ECCS B RHR PUHP COHPLETE MAINTENANCE 03/17/88 0.50 OST-1008 RHR PUMP OPERABILITY QUARTERLY INTERVAL ECCS A RHR COMPLETE SCHEDULED TEST 03/18/88 03/18/88 0.50 OST-1008 RHR PUHP OPERABILITY QUARTERLY INTERVAL ECCS B RHR COHPLETE SCHEDULED TEST 03/21/88 19.00 PERFORM PHS ON LOCAL HETERS, RELAYS AND 6.9 BKR. EDG B EDG COMPLETE MAINTENANCE 2.00 PUHP DOWN THE RECIRCULATION SUMP ECCS 8 RHR COMPLETE PUHP DOWN 03/21/88 1.50 OST-1073 1B-SB EDG OPERABILITY HONTHLY INTERVAL EDG B EDG PERFORH 3 AIR ROLLS - 1 PRE-TEST }I 2 POST-TEST 03/22/88 9.70 A ESW HEADER REPAIR LEAK ON WELD AT 1SW 69 EDG A EDG COMPLETE CORRECTIVE HAINTENANCE 03/25/88 03/28/88 5.08 PUHP DOWN THE RECIRCULATIOH SUHP ECCS 8 RHR' COHPLETE PUHP DOWN 0.58 PERFORM HST-l0098 ON P-925 ECCS ACCUH COHPLETE SURVEILLANCE TEST 03/29/88 0.43 PERFORH HST-10098 ON P-927 ECCS B ACCUH COHPLETE SURVEILLANCE TEST 03/29/88 04/04/88 3.25 PUMP DOWN THE RECIRCULATION SUHP ECCS B RHR PUMP COHPLETE PUMP DOWN 7.92 WORK ON 1A-SA SEQUENCER To ADJUST AGASTAT SETPOINTS PCR-2867 EOG A EDG COHPLETE HOD IF I CAT ION 04/06/88 04/07/88 1.33 WORK ON 18-SB SEQUENCER TO ADJUST AGASTAT SETPOINTS EDG B EDG COMPLETE EPT-033 1.50 OST-1085 1A-SA EDG OPERABILITY SEHIANHUALLY EDG A EDG PERFORH 3 AIR ROLLS - 1 PRE-TEST 8 2 POST-TEST 04/09/88 04/09/88 1.50 OST-1013 1A-SA EDG OPERABILITY HONTHLY INTERVAL EDG A EDG PERFORH 3 AIR ROLLS - 1 PRE-TEST I} 2 POST-TEST 04/11/88 0.63 ACCUM C PRESSURE LOOP CAL (P-0931) HST-I0101 ECCS C ACCUH HST-I0101 COMPLETE 04/11/88 3.17 PUHP DOWN THE RECIRCULATION SUHP ECCS B RHR COHPLETE PUHP DOWN 04/14/88 6.82 PIC-l032 INSPECT 4 ADJUST FLOW INDICATING SWITCH ECCS B RHR PIC-1032 COMPLETE 04/15/88 5.88 CALIBRATION OF FS-602A ECCS A RHR COHPLETE CALIBRATION 04/22/88 14.55 STOP FUEL OIL LEAK EDG B EDG COMPLETE CORRECTIVE HAINTENANCE 1.50 OST-1073 1B-SB EDG OPERABILITY HONTHLY INTERVAL EDG B EDG PERFORM 3 AIR ROLLS - 1 5 2 POST-TEST 04/22/88 PRE-TESI'OHPLETE 04/25/88 2.00 PUHP DOWN THE RECIRCULATION SUHP ECCS B RHR PUHP DOWN 04/29/88 0.77 PERFORH LEVEL SECTIONS (7.2-7.10) OF MST-10110 ECCS C ACCUH COMPLETE SURVEILLANCE TEST 05/02/88 3.25 PUHP DOWN THE RECIRCULATION SUHP ECCS 8 RHR COHPLETE PUHP DOWN
~ ~
P
Page 5 ATTACHMENT 1 DURATION CAUSE SYSTEH/COMPONENT CORRECTIVE ACTION DATE 1.50 OST-1013 1A-SA EDG OPERABILITY MONTHLY INTERVAL EDG 'A EDG PERFORH 3 AIR ROLLS - 1 PRE-TEST 8 2 POST-TEST 05/07/88 2.08 PUMP DOWN THE RECIRCULATION SUHP ECCS 8 RHR COMPLETE PUMP DOWN 05/09/88 0.17 1SW-1329 & 1SW-1326 FAILED TO OPEN EDG A EDG/A ESW REFERENCE LER 88-012 FOR'CORRECTIVE ACTION 05/13/88 6.67 ESW PUMP FAILED TO START DUE TO DEFECTIVE RELAY IH THE SEQUENCER EDG 8 EDG/ESW REFERENCE LER 88-029 FOR CORRECTIVE ACTION 05/15/88 6.17 ECCS 8 RHR COHPLETE PUMP DOWN 05/16/88 PUMP DOWN THE RECIRCULATION SUHP 4.08 ROTATE CONTROL POWER TOGGLE SWITCH TO PROPER POSITION ECCS A RHR PMP ROTATION COHLETE 05/19/88 1.87 ECCS B RHR COMPLETE PUMP DOWN 05/23/88 PUHP DOWN THE RECIRCULATION SUMP 21.83 REPAIR JACKET WATER COOLER LEAKS REPAIR BEARING OIL EDG B EDG COMPLETE CORRECTIVE MAINTEHANCE 05/23/88 0.83 PERFORH EPT-033 EDG 8 EDG/B SEQ COHPLETE EPT-033 05/23/88 1.50 OST-1073 1B-SB EDG OPERABILITY HONTHLY INTERVAL EDG 8 EDG PERFORH 3 AIR ROLLS - 1 PRE-TEST & 2 POST-TEST 05/24/88 05/30/88 2.33 PUMP DOWN THE RECIRCULATION SUMP ECCS 8 RHR COMPLETE PUMP DOWN 8.00 LUBRICATE PUMP ECCS 8 CSIP COHPLETE MAINTENANCE 05/31/88 1.50 OST-1073 18-SB EDG OPERABILITY MONTHLY INTERVAL EDG 8 EDG PERFORH 3 AIR ROLLS - 1 PRE-TEST &t 2 POST-TEST 06/03/88 12.68 PHP FAILED TO START ON LOOP SEQUENCER WHEN BUS 1ASA WAS DE-EHERGIZEDEDG A EDG/ES'W PHP REFERENCE LER 88-013 FOR CORRECTIVE ACTION 06/03/88 1.42 PUMP DOWN THE RECIRCULATION SUHP ECCS 8 RHR COHPLETE PUMP DOWN 06/06/88 17.15 PERFORM MAINTENANCE PRIOR TO SCHEDULED OST-1013 PERFORHANCE EDG A EDG COMPLETE SURVEILLANCE TEST 06/08/88 1.50 OST-1013 1A-SA EDG OPERABILITY HONTHLY INTERVAL EDG A EDG PERFORM 3 AIR ROLLS - 1 PRE-TEST B 2 POST-TEST 06/09/88 18.75 PERFORMANCE OF EPT-072 AND MPT-10032 ECCS B RHR/1RH-69 COMPLETE PERIODIC TESTS 06/13/88 18.75 PERFORM PH-EOO'l2 ON PUMP BREAKER ECCS B RHR PUHP COMPLETE PERIODIC MAINTENANCE 06/13/88 2.50 PUMP DOWN OF CONT SPRAY/RNR RECIR SUMP 8 ECCS B RHR SATISFACTORY COHPLETION OF OST-1803 & 1081 06/13/88 20;75 PERFORHANCE OF EPT-072 AHD HPT-l0032 ECCS 8 RHR/1S1-311 COMPLETE PERIODIC TESTS 06/13/88 06/13/88 20.75 PERFORH EPT-072 AND MPT-10032 ECCS 8 RHR/1SI -327 COMPLETE PERIODIC TESTS 06/13/88 18.75 PERFORH EPT-072 AND HPT-10032 ECCS B RHR/1SI-323 COHPLETE PERIODIC TESTS 20.75 PERFORHANCE OF EPT-072 AND MPT-I0032 ECCS B RHR/1RH-63 COHPLETE PERIODIC TESTS 06/13/88 20.75 PROVIDE ISOLATION FOR TESTING OF 181-311 ECCS B RHR/1SI-301 COMPLETE APPLICABLE PORTIONS OF OST-1008 06/13/88 18.92 PERFORH EPT-072 (EQ INSP) 4 MPT-I0032 ECCS A RHR/1RH-31 COHPLETE PERIODIC TESTS 06/14/88 17.58 EPT-072 (EQ INSPECTION) OF LIHITORQUES ECCS A RHR/1RH-25 COMPLETE PERIODIC TESTS 06/14/88 17.08 PERFORH EPT-072 (EQ INSP) a HPT-10032 ECCS A RHR/1SI-310 COHPLETE PERIODIC TESTS 06/14/88 06/14/88 19.37 PERFORH EPT-072 (EQ INSP) & HPT-l0032 ECCS A RHR/1SI-326 COHPLETE PERIODIC TESTS 06/14/88 9.25 PERFORH EPT-072 & MPT-10037 ECCS A CSIP/1SI-322 COMPLETE PERIODIC TESTS ECCS A COMPLETE SCHEDULED TEST 06/15/88 0.50 OST-1008 RHR PUHP OPERABILITY QUARTERLY INTERVAL RHR ECCS B RHR COHPLETE SCHEDULED TEST 06/15/88 0.50 OST-1008 RHR PUMP OPERABILITY QUARTERLY IHTERVAL 34.48 PERFORM EPT-072, MPT-I0032 FOUND BAD GREASE IN OPERATOR ECCS 8 CSIP/1CS-752 COMPLETE CORRECTIVE HAINTENANCE 06/16/88 06/16/88 31.32 PERFORM EPT-072 II MPT-I0032 ECCS B CSIP/1SI-2 COHPLETE PERIODIC TESTS 39.90 PERFORH MPT-E0008 ECCS 8 CSIP COHPLETE PERIODIC TESTS 06/16/88 40.15 PERFORM EPT-072 AND HPT-I0032 ECCS 8 CSIP/1CS-196 COHPLETE PERIODIC TESTS 06/16/88 06/20/88 3.83 1CS-753 B CSIP ALT HINIFLOW ISOLATION ECCS B CSIP COMPLETE EPT-072 3.45 PERFORM PIC-I009 ON 1CH-616 AH-98-SB TCV ECCS 8 CSIP COMPLETE CALIBRATIONS 06/20/88
Page 6 ATTACHMENT 1 DATE DURATION CAUSE SYSTEH/COMPONENT CORRECTIVE ACTION 06/20/88 3.17 PUHP DOWN THE RECIRCULATION SUHP ECCS 8 RNR COMPLETE PUHP DOWN 06/22/88 13.62 PERFORH MPT-I0032 & EPT-072 ECCS A CSIP/1SI-1 . COHPLETE PERIODIC TESTS 11.82 PERFORH EPT-072 AND MPT-10032 ECCS A CSIP/1CS.745 COMPLETE EPT-072 AND MPT-'I0032 06/22/88 13.92 PERFORM MPT-E0008 ECCS A CSIP COHPLETE MPT-E008 06/22/88 11.75 PERFORH EPT-072 AND MPT-10032 ECCS A CSIP/1CS-746 COHPLETE EPT-072 AND MPT-10032 06/22/88 1.50 OST-1073 18-SB EDG OPERABILITY MONTHLY INTERVAL EDG 8 EDG PERFORH 3 AIR ROLLS - 1 PRE-TEST & 2 POST-TEST 06/24/88 18-SB EDG 8 EDG PERFORH 3 AIR ROLLS - 1 PRE-TEST & 2 POST-TESI' 06/24/88 F 50 OST-1086 EDG OPERABILITY SEHIANNUALLY 2.25 PUMP DOWN THE RECIRCULATION SUHP ECCS 8 RHR COMPLETE PUMP DOWN 06/27/88 06/29/88 1.40 SCREENS ON A ESW BAY 8 FAIL TO MOVE WHILE PUMP IS RUNNING EDG EDG/TRAV SCREEN COHPLETE CORRECTIVE HAIHTENANCE 06/30/88 8.33 REPAIR LEAK ON A CCW NEAT EXCHANGER ECCS A RMR PHP REPAIR LEAK 2.07 PERFORH PIC-1009 ON 1CH-199 ECCS A RHR/AH-SA COMPLETE CALIBRATION 06/30/88 0.75 PERFORH PIC-1009 ON 1CH 251 ECCS A RHR/1CH-251 COHPLETE PIC-I009 07/04/88 07/05/88 2.50 PUHP THE SUMP DOWN DUE TO LEAKAGE PAST 1CT-102 SEAT ECCS 8 RHR COHPLETE PUMP DOWN 0.45 TESTING OF OVERSPEED OF EDG & BARRING EDG 8 EDG ~ COMPLETE TEST AND BARRING OF "B" EDG 07/06/88 18.67 A ESW TRAIN IS INOP DUE TO TRAVELING SCREEH SHEAR PIN BROKEN EDG A EDG COHPLETE CORRECTIVE MAINTENANCE 07/06/88 6.23 ADJUST OR REPLACE FAN BELTS EDG A EDG/AH-86A COMPLETE CORRECTIVE MAINTENANCE 07/08/88 07/08/88 5.38 PERFORM EPT-033 EDG A EDG/A SEQ COHPLETE PERIODIC TEST 4.97 CALIBRATE RELAY 2-32A/1116 EDG A EDG/A SEQ COMPLETE MAINTENANCE 07/08/88 5.88 PERFORH PIC l0666 ON TE.6903 A-SA HVAC EDG 8 EDG COHPLETE CALIBRATION PROCEDURE 07/08/88 1.50 OST-1013 1A-SA EDG OPERABILITY MONTHLY INTERVAL EDG A EDG PERFORM 3 AIR ROLLS - 1 PRE-TEST & 2 POST-TEST 07/09/88 1.42 PUMP OUT THE SUHP ECCS B RHR COHPLETE PUHP DOWN 07/11/88 2.92 PUHP DOWN THE RECIRC SUHP 8 ECCS 8 RHR COMPLETE PUMP DOWN 07/18/88 07/21/88 2.55 REPACK VALVES 1RH-20, 1RH26, 1S1-324, 1SI-325 ECCS A RNR COMPLETE MAIHTENAHCE 0.78 PERFORM EPT-033 EDG 8 EDG COMPLETE EPT-033 07/22/88 0.88 1CC-167 FAILED TO OPEN & CLOSE PROPERLY ECCS 8 RHR COHPLETE MAINTENANCE 07/22/88 07/23/88 1.50 OST-1073 18-SB EDG OPERABILITY MONTHLY INTERVAL EDG 8 EDG PERFORH 3 AIR ROLLS - 1 PRE-TEST & 2 POST-TEST 6.50 PUMP WTR THAT HAS LEAKED FROH RWST ISO VLVS INTO CT 8 SUHP ECCS 8 RHR COHPLETE HAINTENANCE 07/26/88 0.56 ESW PUMP DECLARED INOP DUE TO FAILED TRAVELING SCREEHS EDG A EDG/ESW REFERENCE LER 88-017 FOR CORRECT IVE ACTION 07/26/88 07/27/88 F 50 OST-1073 18-SB EDG OPERABILITY MONTHLY INTERVAL EDG 8 EDG PERFORH 3 AIR ROLLS - 1 PRE-TEST & 2 POST-TEST 07/27/88 3.42 REPLACE JUMPER WIRE WITH A QUALIFIED WIRE ECCS 8 CSIP/181-2 COMPLETE HAIHTENANCE 07/27/88 5.72 TIGHTEN & REPLACE BELTS ON AH-5A IN 190'AB ECCS A RHR COMPLETE MAINTENANCE 07/27/88 3.42 REPLACE JUHPER WITH QUALIFIED WIRE ECCS 8 CSIP/1SI-2 COHPLETE CORRECTIVE MAINTENANCE 08/06/88 1.50 OST-1823 1A-SA EDG OPERABILITY 18 MONTH EDG A EDG PERFORM 3 AIR ROLLS - 1 PRE-TEST & 2 POST-TEST 08/06/88 1.50 OST-1823 1A-SA EDG OPERABILITY 18 MONTH EDG A EDG PERFORH 3 AIR ROLLS - 1 PRE-TEST & 2 POST-TEST 08/08/88 1.50 OST-1824 1B-SB EDG OPERABILITY 18 HONTH EDG 8 EDG PERFORH 3 AIR ROLLS - 1 PRE-TEST & 2 POST-TEST 08/08/88 7.15 PERFORH HODIFICATIOH PCR-875 AND 924 EDG A EDG COHPLETE HODIFICATIONS 08/08/88 1.50 OST-1824 1B-SB EDG OPERABILITY 18 MONTH EDG 8 EDG PERFORH 3 AIR ROLLS - 1 PRE-TEST & 2 POST-TEST 08/15/88 1.50 OST-1013 1A-SA EDG OPERABILITY MONTHLY INTERVAL EDG A EDG PERFORM 3 AIR ROLLS - 1 PRE-TEST & 2 POST-TEST
0 Page 7 ATTACHMENT 1 DATE DURATION CAUSE SYSTEH/COMPONENT CORRECTIVE ACTION 08/22/88 15.20 LEAKING OIL AND LEAK OH SEAL WATER EQUALIZING LINE ECCS 8 CSIP COMPLETE CORRECTIVE HAINTENANCE 08/25/88 1.50 OST-1073 18-SB EDG OPERABILITY MONTHLY INTERVAL EDG B EDG PERFORH 3 AIR ROLLS - 1 PRE-TEST 8 2 POST-TEST 08/29/88 1.50 OST-1073 18-SB EDG OPERABILITY MONTHLY INTERVAL EDG B EDG PERFORM 3 AIR ROLLS - 1 PRE-TEST II 2 POST-TEST 09/05/88 1.50 OST-1013 1A-SA EDG OPERABILITY MONTHLY INTERVAL EDG A EDG PERFORH 3 AIR ROLLS - 1 PRE-TEST K 2 POST-TEST 09/16/88 0.08 EST-317.PERFORM SEQUENCER TEST ECCS 8 RHR COMPLETE EST-317 09/16/88 0.08 EST-317 PERFORM SEQUENCER TEST ECCS B RHR COMPLETE EST-3'17 09/20/88 1.50 OST-1073 1B-SB EDG OPERABILITY MONTHLY INTERVAL EDG 8 EDG PERFORH 3 AIR ROLLS - 1 PRE-TEST 8I 2 POST-TEST 09/27/88 1.50 OST-1013 1A-SA EDG OPERABILITY MONTHLY INTERVAL EDG A EDG PERFORM 3 AIR ROLLS - 1 PRE-TEST 8 2 POST-TEST 10/09/88 1.50 OST-1085 1A-SA EDG OPERABILITY SEMIANNUALLY EDG A EDG PERFORH 3 AIR ROLLS - I PRE-TEST 4 2 POST-TEST 10/09/88 F 50 OST-1013 1A-SA EDG OPERABILITY HONTHLY IHTERVAL EDG A EDG PERFORM 3 AIR ROLLS - 1 PRE-TEST B 2 POST-TEST 10/10/88 4.42 INSTALLATION OF INSULATION ON EXHAUST STACK EDG A EDG COMPLETE MAIHTENANCE 10/13/88 2.75 FAN E-86 D-SB IS INOPERABLE EDG B EDG REPAIR FAN 10/21/88 9.50 PROBLEHS WITH SPEED CONTROL DURING OST-1073 EDG B EDG ADJUST SPEED CONTROLLER 10/22/88 1.50 OST-1073 1B-SB EDG OPERABILITY MONTHLY INTERVAL EDG B EDG PERFORM 3 AIR ROLLS - 1 PRE-TEST Bt 2 POST-TEST 11/06/88 1.50 OST-1013 1A-SA EDG OPERABILITY MONTHLY INTERVAL EDG A EDG PERFORH 3 AIR ROLLS - 1 PRE-TEST B 2 POST-TEST 11/08/88 31.32 CALIBRATE DIFFERENTIAL PRESSURE INDICATOR ECCS A CSIP/AH-9A COMPLETE CALIBRATION 11/10/88 8.23 CALIBRATE PRESSURE DIFFERENTIAL INDICATOR FOR AH-9B ECCS B CSIP COMPLETE CALIBRATION 11/11/88 32.33'REPAIR SEAT LEAKS ON CASING DRAIN VALVES 1CS-175 8 1CS -176 ECCS A CSIP COMPLETE MAINTENANCE 11/18/88 5.33 FANS E-85 1ASA B 1BSA WILL NOT RUN, DIESEL INOPERABLE EDG A EDG COMPLETE MAINTENANCE 11/19/88 1.50 OST-1073 1B-SB EDG OPERABILITY MONTHLY INTERVAL EDG 8 EDG PERFORM 3 AIR ROLLS - 1 PRE-TEST 8 2 POST-TEST 11/21/88 12.12 COMPLETE PCR-1446 F PERFORH MOO-204 ACCEPTANCE TEST AN0 EPT-33 EDG 8 EDG COMPLETE TEST AND MAIHTENANCE 11/22/88 1.50 OST-1073 1B-SB EDG OPERABILITY MONTHLY INTERVAL EDG B EDG PERFORM 3 AIR ROLLS - 1 PRE-TEST B 2 POST-TEST 11/23/88 21.27 DISASSEHBLE F INSP SEATING SURFACES ALT MINIFLOW VLV ECCS A CSIP COMPLETE MAINTENANCE 11/25/88 33.92 PUMP UNDER CLEARANCE TO REPAIR WELD ON SEAL LINE ECCS 8 CSIP COMPLETE MAINTENANCE 11/29/88 3.67 CALIBRATE FS-69078 (E-85 ASB 4 BSB) EDG B EDG COMPLETE CALIBRATION 12/02/88 25.50 INCOMPLETE ECCS TIME RESPONSE TESTING ECCS C CSIP REFERENCE LER 88-035 FOR CORRECTIVE ACTIOH 12/02/88 21.42 CSIP DECLEARED INOP DUE TO MISSED SURVEILLANCE TESTS ECCS C CSIP REFERENCE LER 88-033 FOR CORRECTIVE ACTION 12/07/88 1.50 OST-1013 1A-SA EDG OPERABILITY MONTHLY INTERVAL EDG A EDG PERFORM 3 AIR ROLLS -- 1 PRE-TEST 8 2 POST-TEST 12/14/88 0.50 OST-1008 RNR PUMP OPERABILITY QUARTERLY INTERVAL ECCS 8 RHR COMPLETE SCHEDULED TEST 12/14/88 0.50 OST-1008 RNR PUMP OPERABILITY QUARTERLY INTERVAL ECCS A RHR COMPLETE SCHEDULED TEST 12/22/88 8.12 REMOVAL AND INSPECTION OF FUEL CONTROL BEARING BRACKET EDG 8 EDG COMPLETE CORRECTIVE MAINTENANCE 12/22/88 1.50 OST-1073 1B-SB EDG OPERABILITY MONTHLY INTERVAL EDG B EDG PERFORM 3 AIR ROLLS - 1 PRE-TEST B 2 POST-TEST 12/22/88 1.50 OST-1086 1B-SB EDG OPERABILITY SEHIANNUALLY EDG B EDG PERFORH 3 AIR ROLLS - 1 PRE-TEST 8 2 POST-TEST 12/29/88 1.08 LOSS OF BUS DURING PERFORH OF UNDER VOLTAGE TEST EDG A EDG BUS RESTORE OFFSITE POWER TO 1ASA BUS 01/03/89 5.92 TEST AH-9A COOLING COlL FOR LEAKAGE ECCS A CSIP/AH-9A CHECK FAN FOR LEAKAGE 01/03/89 5.90 OIL CHANGE ECCS A CSIP COMPLETE MAINTENANCE 01/05/89 23 F 08 REPAIR OIL LEAKS MPT-M0001 ON STARTING AIR DRYERS EDG A EDG COMPLETE TEST AND MAINTENANCE 01/06/89 1.50 OST-1013 1A-SA EDG OPERABILITY MONTHLY INTERVAL EDG A EDG PERFORM 3 AIR ROLLS - 1 PRE-TEST 8 2 POST-TEST
\ J Page 8 ATTACHMENT 1 DATE DURATION CAUSE SYSTEH/COMPONENT CORRECTIVE ACTION 01/06/89 7.17 REPAIR MECH SEAL JACKET-MATER KEEP I!ARM PNIP EDG 8 EDG COMPLETE CORRECTIVE MAINTENANCE 01/07/89 2.45 REPAIR MECH SEAL JACKET IIATER KEEP 'WARM PUMP EDG 8 EDG COMPLETE CORRECTIVE MAIN'IENANCE 01/09/89 4.77 PERFORM MPT-10084 OIL CHANGE ECCS A CSIP COMPLETE MAINTENANCE 01/12/89 12.18 REPAIR OIL LEAKS AND CHANGE OIL ECCS 8 CSIP COMPLETE MAINTENANCE 6.50 OIL ECCS B RKR COMPLETE OIL CNAHGE 01/23/89 CHANGE 11 F 07 CLEAN F.O. STRAINERS, REMORK LEAKING INTAKE ELBOII, CHANGE GREASE EDG 8 EDG COMPLETE MAINTENANCE 01/23/89 01/24/89 1.50 OST-1073 1B-SB EDG OPERABILITY HONTHLY INTERVAL EDG B EDG PERFORM 3 AIR ROLLS - 1 PRE-TEST 8 2 POST-TEST 01/25/89 14.75 DISASSEMBLE VALVE, INSPECT, LAP SEAT ECCS B CSIP/1CS-754 COMPLETE CORRECTIVE MAINTEHANCE 01/25/89 5.60 MEGGAR AND BRIDGE MOTOR EDG 8 EDG/DFO XFER PMP COMPLETE TESTS 6.00 PERFORM MPT-MOO&4 (MOTOR LUBE) ECCS A RHR PHP COMPLETE MAINTENANCE 01/26/89 01/26/89 20.67 REPLACE BONNET GASKET ECCS A CSIP/1CS-745 REPLACE GASKET 1.50 OST-1013 1A-SA EDG OPERABILITY MONTHLY INTERVAL EDG A EDG PERFORM 3 AIR ROLLS - 1 PRE-TEST 8 2 POST-TEST 02/10/89 02/10/89 41.10 CALIBRATE RELAY, PIC-E037, REPLACE VARMETER PER P CR-845 EDG A EDG COMPLETE CALIBRATION AND MODIFICATION 02/21/89 0.88 VERIFY REMOVAL OF TEMP. MOO. PCR-768 ECCS 8 RHR/1CC-167 COMPLETE REMOVAL
'IB-SB OPERABILITY MONTHLY INTERVAL EDG 8 EDG PERFORM 3 AIR-ROLLS - 1 PRE-TEST 8 2 POST-TEST 02/21/89 F 50 OST-1073 EDG 03/02/89 3.42 A TRAIN E-85 FANS MILL MOT CONTINUE RUNNING EDG A EDG COHPLETE CORRECTIVE MAINTENANCE 03/04/89 0.50 OST-1008 RHR PUMP OPERABILITY QUARTERLY INTERVAL ECCS A RHR COMPLETE SCHEDULED TEST 03/OC/89 0 ~ 50 oST-1008 RHR PUMP OPERABILITY QUARTERLY INTERVAL ECCS 8 RHR COMPLETE SCHEDULED TEST 03/09/89 2C.65 VALVE 1CS-214 FAILED To STROKE SHUT ECCS A CSIP COMPLETE CORRECTIVE MAINTENANCE 03/09/89 1.50 OST-1013 1A-SA EDG OPERABILITY MONTHLY INTERVAL EDG A EDG PERFORH 3 AIR ROLLS - 1 PRE-TEST 8 2 POST-TEST 03/09/89 1.50 OST-1085 1A-SA EDG OPERABILITY SEMIANNUALL'Y EDG A EDG PERFORM 3 AIR ROLLS - 1 PRE-TEST 8 2 POST-TEST 03/09/89 15.83 REPAIR LEAKS ON PUHPS, FITTINGS AMD JACKET SAMPLE VALVES EDG A EDG COMPLETE CORRECTIVE MAINTENANCE 03/22/89 14.07 INSTALL PCR-845 EDG B EDG/ESII COMPLETE MODIFICATION 03/23/89 0.25 TROUBLESHOOT PROBLEH 'NITH Fl-605A AND REPAIR ECCS A RHR COMPLETE CORRECTIVE MAINTENANCE 1.50 OST-1073 1B-SB EDG OPERABILITY MONTHLY INTERVAL EDG 8 EDG PERFORM 3 AIR ROLLS - 1 PRE-TEST 8 2 POST-TEST 03/23/89 04/06/89 4.42 REMOVE TERMINAL COVER AMD CHECK PER PCR-3425 ECCS A CSIP/1$ 1-4 COMPLETE MODIFICATION 04/06/89 F 00 REMOVE TERMINAL COVER AND CHECK PER PCR-3425 ECCS 8 CSIP/1RH-63 COMPLETE MODIFICATION 04/10/89 12.53 MPT-10032 LIMITORQUE INSPECTION ECCS C CSIP/1CS-'169 COMPLETE MAINTENANCE TEST AND INSPECTION 04/10/89 12.53 MPT-10032 LIMITORQUE INSPECTION ECCS B CSIP COMPLETE MAINTENANCE TESI'MD INSPECTION 04/12/89 11.05 MPT-10032 LIMITORQUE INSPECTION ECCS C CSIP/1CS-168 COMPLETE MAINTEHANCE TEST AHD INSPECTION 04/12/89 0.30 INSPECT 1DFO-164 'NSP ~ SEQUENCER, HST-10493 EDG A EDG COMPLETE CORRECTIVE MAINTENANCE AND TEST 04/12/89 11.05 MpT-10032 LIHIToRQUE IMspECTloN ECCS A CSIP/1CS-170 COMPLETE MAINTENANCE TEST AND INSPECTION 04/13/89 0 '8 REPAIR BARRING DEVICE EDG A EDG A EDG REPAIR BARRING DEVICE REPLACE AFTER ATTEMPTED REPAIR 04/13/89 0.35 REPLACE BARRING DEVICE EDG 04/13/89 1.50 OST-1013 1A-SA EDG OPERABILITY MONTHLY INTERVAL EDG A EDG PERFORM 3 AIR ROLLS - 1 PRE-TEST 8 2 POST-TEST 04/20/89 1.50 OST-1073 1B-SB EDG OPERABILITY MONTHLY INTERVAL EDG 8 EDG PERFORM 3 AIR ROLLS - 1 PRE-TEST 8 2 POST-TEST 04/26/89 4.42 CLEAN GEAR DRIVE OIL STRAINER ECCS A CSIP COMPLETE MAINTENANCE 04/26/89 4.47 CLEAN GEAR DRIVE OIL STRAINER ECCS 8 CSIP COMPLETE MAINTENANCE
Page 9 ATTACHHENT 1 DATE DURATION CAUSE SYSTEM/COMPONENT CORRECTIVE ACTION 04/27/89 3.92 REPLACE PLUGS IN OIL COOLER HEAT EXCHANGER ECCS 8 CSIP COMPLETE CORRECTIVE MAINTENANCE 05/08/89 16.50 INSPECTION FOR LEAKS AND PERFORM EST-211 EDG A EDG COMPLETE CORRECTIVE MAINTENANCE AND TEST 05/09/89 1.50 OST-1013 1A-SA EDG OPERABILITY MOHTHLY INTERVAL EDG A EDG PERFORM 3 AIR ROLLS - 1 PRE-TEST 8 2 POST-TEST 05/16/89 4.72 FUEL OIL TRANSFER PUHP FAILED OST-1073 EDG B EDG/1DFO.E003 COHPLETE CORRECTIVE MAINTENANCE 05/16/89 13.33 REPLACE TORQUE SWTCH ECCS A RHR/1CC-147 COHPLETE CORRECTIVE MAINTENANCE 8 EDG PERFORH 3 AIR ROLLS 1 PRE-TEST 8 2 POST-TEST 05/17/89 1.50 OST-1073 1B-SB EDG OPERABILITY MONTHLY INTERVAL EDG 05/17/89 2.12 BREAKER REPLACEMENT PCR-4007 EDG B EDG COMPLETE MODIFICATION 05/17/89 6.65 REPLACE TORQUE SWITCH ECCS B RHR/1CC-167 COMPLETE CORRECTIVE MAINTENANCE 05/19/89 6.83 E-86A FAN TRIPPED B BKR WILL NOT RESET EDG A EDG COMPLETE CORRECTIVE MAINTENANCE 05/26/89 4.72 REPLACE TORQUE SWITCH ECCS 8 RHR/1CC-167 COHPLETE CORRECTIVE MAINTENANCE 05/27/89 5.92 REHOVED FROH SERVICE TO PLACE 8 CSIP IN SERVICE ECCS C CSIP COMPLETE TRANSFER 05/31/89 1.42 TAKEN OOS TO TEST B-CSIP ECCS C CSIP COMPLETE TEST RETURN TO SERVICE 06/02/89 3.00 BKR RACKED OUT TO ALLOW 8 CSIP PMP TEST ECCS C CSIP COHPLETE TEST RETURH TO. SERVICE 06/02/89 1.32 AIR START SOLENOID TROUBLESHOOTING EDG 8 EDG COMPLETE CORRECTIVE MAINTENANCE 06/04/89 27.62 FAN BKR TRIPS ON THERHALS EDG A EDG/1DG-E017 COHPLETE CORRECTIVE HAINTEHANCE 06/04/89 23.28 DISASSEHBLE AND INSPECT IDFO-205 EDG A EDG/1DG-E017 COMPLETE CORRECTIVE MAINTENANCE PERFORH 3 AIR ROLLS - 1 PRE-TEST & 2 POST-TEST 06/05/89 1.50 OST-1013 1A-SA EDG OPERABILITY MONTHLY IHTERVAL EDG A EDG 06/07/89 2 '0 MPT-I0068 WHICH INOPS AH-85 EDG 8 EDG/1DG E015 A RHR COHPLETE PERIODIC TEST COMPLETE SCHEDULED TEST 06/07/89 0.50 OST-1008 RHR PUMP OPERABILITY QUARTERLY INTERVAL ECCS 06/07/89 0.50,0ST-1008 RHR PUMP OPERABILITY QUARTERLY INTERVAL ECCS B RHR COHPLETE SCHEDULED TEST 06/16/89 7.48 CHANGE OIL ECCS 8 RHR INSPECT FOR PROPER OIL LEVEL 06/16/89 14.08 DG INOP WITH ESW INOP 8 DUE TO MST-10490 EDG 8 EDG/ESW COMPLETE SURVEILLANCE TEST 06/16/89 14.03 REPACK VALVE 1-S'WB EDG B EDG/1SW-8 COMPLETE MAINTENANCE 1.50 OST-1086 1B-SB EDG OPERABILITY SEHIANHUALLY EDG 8 EDG PERFORM 3 AIR ROLLS - 1 PRE-TEST 8 2 POST-TEST 06/17/89 06/17/89 1.50 OST-1073 1B-SB EDG OPERABILITY MONTHLY INTERVAL EDG B EDG PERFORM 3 AIR ROLLS - 1 PRE-TEST 8 2 POST-TEST 06/18/89 3.25 CALIBRATE FLOW SWITCH 6905B EDG B EDG/AH-85 COMPLETE CALIBRATION 06/20/89 13.18 ADJUST % CYLINDER EDG B EDG COHPLETE CORRECTIVE MAINTENANCE 06/22/89 3.03 INSPECT VALVE SPRINGS EDG A EDG/1DG-E002 COMPLETE INSPECI'ION 07/05/89 1.38 REPAIR 1EA-14, 1EA29 8 SOLENOID VALVE EDG A EDG COMPLETE CORRECTIVE MAINTENANCE 07/05/89 15.58 CHANGE OIL IH PUMP ECCS A CSIP COMPLETE MAINTENANCE 07/05/89 12.72 UNDER CLEARANCE FOR COIL LEAK CHECK ECCS A CSIP/AH-9A COHPLETE MAINTEHANCE 07/05/89 10.48 CHANGE OIL IN PUHP ECCS A RHR COMPLETE OIL CHANGE 07/06/89 1.50 OST-1013 1A-SA EDG OPERABILITY MONTHLY INTERVAL EDG A EDG PERFORM 3 AIR ROLLS - 1 PRE-TEST Bt 2 POST-TEST 07/07/89 2.13 REMOVE SUMP COVER TO FIX LEVEL INDICATOR ECCS 8 RHR COMPLETE CORRECTIVE MAINTENANCE 07/11/89 5.67 MAINTENANCE ON 1SW-E006 EDG 8 EDG COHPLETE MAINTENANCE 07/17/89 12.50 REPLACE EXHAUST GASKET, PLANNED PM EDG 8 EDG COHPLETE CORRECTIVE MAINTENANCE 07/17/89 1.50 OST-1073 1B-SB EDG OPERABILITY HOHTHLY INTERVAL EDG 8 EDG PERFORM 3 AIR ROLLS - 1 PRE-TEST 8 2 POST-TEST 07/24/89 7.57 PERFORM MAINTENANCE OH 1SW-270 EDG 8 EDG/1SW-E005 COMPLETE CORRECTIVE MAINTENANCE
Page 'IO ATTACHMENT 1 DATE DURATION CAUSE SYSTEH/COMPONENT CORRECTIVE ACTION 07/26/89 9.52 LIMITORQUE INSPECTION ECCS 8 CSIP/1CS-196 COMPLETE INSPECTION 07/26/89 9.27 LIMITORQUE INSPECTION ECCS C CSIP/1CS-752 COMPLETE INSPECTION 07/26/89 8.58 LIMITORQUE INSPECTION ECCS 8 CSIP/181-2 COMPLETE INSPECTION 07/31/89 6.80 DISASSENBLE AND CLEAN VALVE REGULATOR EDG A EDG/1S'W-20 COMPLETE CORRECTIVE MAINTENANCE 07/31/89 F 50 OST-1013 1A-SA EDG OPERABILITY MONTHLY INTERVAL EDG A EDG PERFORH 3 AIR ROLLS - 1 PRE-TEST & 2 POST-TEST 07/31/89 7.00 INSTALL PCR-4'662 AND PERFORM EPT-33 EDG A EDG/A SEQ COMPLETE MODIFICATION AND TEST 07/31/89 5.72 PERFORN LP-T-6589A EDG A EDG/AH-86A COMPLETE LOOP CALIBRATION 08/14/89 7.67 TRAHSPOSE lIIRES To AGREE ll/ DESIGN IAM PCR-4663 EDG B EDG/B SEQ COMPLETE MODIFICATION AND TEST 08/14/89 7.00 INSPECT COUPLING GUARD ECCS 8 CSIP COMPLETE INSPECTION 08/15/89 1.50 OST-1073 18-SB EDG OPERABILITY MONTHLY INTERVAL EDG B EDG PERFORN 3 AIR ROLLS - 1 PRE-TEST &, 2 POST-TEST 08/21/89 5.67 RHR VALVES NOT BEING TESTED AS REQUIRED ECCS RHR REFERENCE LER 89-014 FOR CORRECTI VE ACTION 08/22/89 11 '8 REPLACE FILTERS ON BOTH FANS EDG A EDG/AH-85 A EDG/ESll PUMP COMPLETE MAINTENANCE COMPLETE MAINTEHANCE 08/22/89 14.50 PERFORM CM-ME0018, CLEAN CORROSION FROM PMP COUPL ING & SHAFT EDG 08/22/89 14.50 MAINTENANCE INSPECTION AND LUBRICATIOH EDG A EDG/AUX RES S CRN VERIFY PROPER SCREEH OPERATIOH 08/28/89 6.92 MAINTENAHCE ON EDG EDG A EDG COMPLETE MAINTENANCE 08/29/89 1.50 OST-1013 1A-SA EDG OPERABILITY MONTHLY IHTERVAL EDG A EDG PERFORM 3 AIR ROLLS - 1 PRE-TEST & 2 POST-TEST 09/06/89 8.75 PERFORM MPT-10032 LIMITORQUE INSPECTION ECCS B CSIP/1SI-323 COMPLETE INSPECTIONS AND TEST 09/07/89 0.50 OST-1008 RHR PUMP OPERABILITY QUARTERLY INTERVAL ECCS B RHR COMPLETE SCHEDULED TEST 09/07/89 0.50 OST-1008 RHR PUMP OPERABILITY QUARTERLY INTERVAL ECCS A RHR COMPLETE SCHEDULED TEST 09/11/89 12.18 MAINTEHAHCE OH DG RELAYS EDG 8 EDG COMPLETE MAINTENANCE 09/11/89 1.50 OST-1073 18 SB EDG OPERABILITY MONTHLY INTERVAL EDG 8 EDG PERFORH 3 AIR ROLLS - 1 PRE-TEST & 2 POST-TEST o9/11/e9 3.80 SERVICE HATER LEAK ON SPEED CHANGER COOLER ECCS 8 CSIP COMPLETE CORRECTIVE MAINTENANCE 09/25/89 7.12 PERFORN MST-E0059 AND NST-E0061 EDG A EDG COMPLETE SURVEILLANCE TEST 09/25/89 1.00 CALIBRATE FLOI SlIITCHES FS-6905B-SB EDG 8 EDG/AH.85 COMPLETE CALIBRATION 09/25/89 1.50 PERFORN LP-T-6502A ECCS A RHR/AH-SA COMPLETE LOOP CALIBRATIOH 09/26/89 4.83 INSPECT PUMP CLEARANCES EDG A EDG/EslI SCRH 'MASHCOMPLETE IHSPECTIONS 09/26/89 2.67 CHANGE FILTER AIR HANDLER AH-86 EDG A EDG COMPLETE CORRECTIVE MAINTENANCE 09/27/89 1.50 OST-1085 1A-SA EDG OPERABILITY SEMIANNUALLY EDG A EDG PERFORM 3 AIR ROLLS - 1 PRE-TEST & 2 POST-TEST 09/27/89 1.50 OST-1013 1A-SA EDG OPERABILITY MONTHLY INTERVAL EDG A EDG PERFORM 3 AIR ROLLS - 1 PRE-TEST 8 2 POST-TEST 10/09/89 5.00 IHSPECT & REPLACE A]R FILTERS EDG 8 EDG/AH-85 COMPLETE CORRECTIVE MAINTENANCE 10/09/89 4.50 FUEL OIL XFER PUMP STRAINER LEAK EDG 8 EDG/XFER PMP COMPLETE CORRECTIVE MAIHTENANCE 10/09/89 1.50 OST-1073 1B-SB EDG OPERABILITY MOHTHLY INTERVAL EDG 8 EDG PERFORM 3 AIR ROLLS - 1 PRE-TEST & 2 POST-TEST 10/16/89 F 50 OST-1823 1A-SA EDG OPERABILITY 18 MONTH EDG A EDG PERFORM 3 AIR ROLLS - 1 PRE-TEST 8 2 POST-TEST 10/16/89 1.50 OST-1823 1A-SA EDG OPERABILITY 18 MONTH EDG A EDG PERFORM 3 AIR ROLLS - 1 PRE-TEST & 2 POST-TEST 10/23/89 1.50 OST-1013 1A-SA EDG OPERABILITY NONTHLY INTERVAL EDG A EDG PERFORM 3 AIR ROLLS - 1 PRE-TEST & 2 POST-TEST 11/07/89 1.92 2 HANGERS REMOVED FOR ISI INSPECTION ECCS A RHR REINSTALL HANGERS 11/08/e9 1.50 OST-1073 1B-SB EDG OPERABILITY MONTHLY INTERVAL EDG 8 EDG PERFORH 3 AIR ROLLS - 1 PRE-TEST & 2 POST-TEST 11/22/89 1.50 OST-1073 18-SB EDG OPERABILITY MONTHLY INTERVAL EDG 8 EDG PERFORM 3 AIR ROLLS - 1 PRE-TEST & 2 POST-TEST
\ Page 11 ATTACHMENT 1 CAUSE SYSTEM/COMPOHENT CORRECTIVE ACTION DATE DURATION OST-1092 18-SB RHR PUMP OPERABILITY QUARTERLY INTERVAL ECCS B RHR COMPLETE SCHEDULED TEST 11/23/89 0.50 OST-1008 RKR PUMP OPERABILITY QUARTERLY INTERVAL ECCS A RHR COMPLETE SCHEDULED TEST 11/23/89 0.50 OST-1013 1A-SA EDG OPERABILITY MONTHLY INTERVAL EDG A EDG PERFORM 3 AIR ROLLS - 1 PRE-TEST 8 2 POST-TEST 11/27/89 1.50 t 1.50 OST-1013 1A-SA EDG OPERABILITY MONTHLY INTERVAL EDG A EDG PERFORH 3 AIR ROLLS - 1 PRE-TEST 2 POST-TEST 12/04/89 ECCS RHR REFERENCE LER 89-022 FOR CORRECTIVE ACTI ON 12/10/89 0.28 LOSS OF ALL RHR DURING VALVE TESTING EDG B EDG PERFORM 3 AIR ROLLS - 1 PRE-TEST 8 2 POST-TEST 12/12/89 1 ~ 50 OST-1824 1B-SB EDG OPERABILITY 18 MONTH 8 EDG PERFORM 3 AIR ROLLS - 1 PRE-TEST 8 2 POST-TEST 12/12/89 1.50 OST-1824 1B-SB EDG OPERABILITY 18 MONTH EDG 2.77 PERFORM MAIHTEHANCE ON iSI-3 ECCS B CSIP/1SI-3 REPLACE TORQUE SNITCH 12/14/89 COMPLETE CORRECTIVE MAINTENANCE 32.08 JACKET HATER KEEPMARM PMP LEAK EDG B EDG 12/15/89 12/15/89 3.30 REPLACE TORQUE SNITCH ECCS A CSIP/181-4 REPLACE TORQUE SMITCH A EDG PERFORH 3 AIR ROLLS - 1 PRE-TEST 8 2 POST-TEST 12/17/89 1.50 OST-'I013 1A-SA EDG OPERABILITY MONTHLY INTERVAL EDG EDG 8 EDG PERFORM 3 AIR ROLLS - 1 PRE.TEST 8 2 POST-TEST 12/22/89 1.50 OST-1086 1B-SB EDG OPERABILITY SEMIANNUALLY 8 EDG PERFORM 3 AIR ROLLS - 1 PRE-TEST 8 2 POST-TEST 12/22/89 1.50 OST-'1073 1B-SB EDG OPERABILITY MONTHLY INTERVAL EDG
'1.50 OST-1013 1A-SA EDG OPERABILITY MONTHLY INTERVAL EDG A EDG PERFORM 3 AIR ROLLS - 1 PRE-TEST 8 2 POST-TEST 12/28/89 FREQUENCY DID NOT STABILIZE EDG B EDG COMPLETE RETEST 12/31/89 46.00 OST-1073 1B-SB EDG OPERABILITY MONTHLY IN'IERVAL EDG 8 EDG PERFORM 3 AIR ROLLS - 1 PRE-TEST 8 2 POST-TEST 01/01/90 1.50 IHD. LIGHTS FOR 8 DG FUEL OIL XFER PMP S DAY TNK IHLT NOT OPER EDG 8 EDG REPLACE RELAY IN THE CONTROL PANEL 01/01/90 0.58 ~
HAINTENAHCE ON RELAY 43T-DG1SB/1085 EDG 8 EDG COMPLETE CORRECTIVE MAINTENANCE 01/03/90 12.20 REPAIR 1DJO-10 AND 1PH.45 EOG A EDG COMPLETE CORRECTIVE MAINTEHANCE 01/15/90 14.87 OST-1013 1A-SA EDG OPERABILITY HONTHLY INTERVAL EDG A EDG PERFORM 3 AIR ROLLS - 1 PRE-TEST 8 2 POST-TEST 01/16/90 1.50 01/23/90 0.67 ADJUST PACKIHG ECCS 8 CSIP/1SI-2 COMPLETE CORRECTIVE MAINTENANCE 01/29/90 13.32 SET LIMIT SNITCHES ECCS B CSIP/1 s I -311 COHPLETE CORRECTIVE MAINTEHANCE EDG B EDG/1DLO-E006 COMPLETE CORRECTIVE MAINTENANCE 01/29/90 21.82 LUBRICATE DRIVE COUPLING EDG B EDG COMPLETE CORRECTIVE MAINTENANCE 01/29/90 21.82 REPLACE EXHAUST GASKET OST-1073 1B-SB OPERABILITY MONTHLY INTERVAL EDG 8 EDG PERFORM 3 AIR ROLLS - 1 PRE-TEST 8 2 POST-TEST 01/29/90 1.50 EDG EDG 8 EDG/1B23-SB-3A REPLACE FILTER 01/29/90 13.07 CHANGE FILTER ECCS B RHR/1RH-66 COMPLETE CORRECTIVE MAINTENANCE 01/29/90 8.53 REBUILD AIR REGULATOR EDG A EDG COMPLETE MAINTENANCE 02/12/90 36.78 PREPLANNED MAINTENANCE 1.50 OST-1013 1A-SA EDG OPERABILITY MONTHLY INTERVAL EDG A EDG PERFORH 3 AIR ROLLS - 1 PRE-TEST 8 2 POST-TEST 02/13/90 0.50 OST-1008 1A-SA RHR PUMP OPERABILITY QUARTERLY INTERVAL ECCS A RHR COMPLETE SCHEDULED TEST 02/13/90 13.03 TORQUE BLADE PITCH LOCKNUT OH EXHAUST FAH EDG A EDG/EBBA COMPLETE CORRECTIVE MAINTENANCE 02/20/90 IHSPECT MOTOR HIHDING EDG A EDG/ESH PUMP COMPLETE INSPECTIOHS 02/20/90 12.80 13.07 8 CHILLER FAILED TO DEVELOP REQUIRED FLOW ECCS CSIP/ESCIIC REFERENCE LER 90-003 FOR CORRECTIVE ACT ION 02/20/90 A EDG COMPLETE CALIBRATION 02/22/90 3.03 A ESM OOS FOR CALIBRATION OF PT-9101A1 EDG 1.50 OST-1073 18-SB EDG OPERABILITY MONTHLY INTERVAL EDG B EDG PERFORH 3 AIR ROLLS - 1 PRE-TEST 8 2 POST-TEST 02/26/90 EDG 8 EDG COMPLETE HAINTENANCE 02/26/90 19.20 VARIOUS MAINTENANCE JOBS 02/28/90 6.40 PERFORM PM-I0020 OH 1SI-341 ECCS B RHR/1SI-341 COHPLETE MAIHTENAHCE 0.50 OST-1092 1B-SB RHR PUMP OPERABILITY QUARTERLY INTERVAL ECCS B RHR COMPLETE SCHEDULED TEST 03/01/90
Page 12 ATTACHHENT 1 DURATION CAUSE SYSTEH/COHPONENT CORRECTIVE ACTION DATE 12.42 PERFORH PM-E0012 OH BREAKER ECCS A RHR COMPLETE MAINTENANCE 03/06/90 20.18 REPLACE MOTOR PINION KEY ECCS A RHR/1RH-25 COMPLETE CORRECTIVE MAINTENANCE 03/06/90 20.42 PREPLANNED HAINTENANCE EDG A EDG COMPLETE MAINTENANCE 03/12/90 1.50 OST-1013 1A-SA EDG OPERABILITY HONTHLY INTERVAL EDG A EDG PERFORH 3 AIR ROLLS - 1 PRE-TEST & 2 POST-TEST 03/13/90 1.50 OST-1085 1A-SA EDG OPERABILITY SEHIANNUALLY EDG A EDG PERFORH 3 AIR ROLLS - 1 PRE-TEST & 2 POST-TEST 03/13/90 0.18 1SW-271 FAILED IN OPEN POSITION EDG 8 EDG/1SW-271 COMPLETE CORRECTIVE HAINTENANCE 03/19/90 0.18 PREPLANNED MAINTENANCE EDG A EOG COMPLETE MAINTENANCE 03/22/90 03/23/90 0.70 ADJUST PACKING ECCS 8 CSIP/1SI-2 COMPLETE CORRECTIVE MAINTENANCE 8 EDG COMPLETE CORRECTIVE HAINTENANCE 03/26/90 20.92 CHANGE VARIOUS AIR AND FUEL OIL FILTERS EDG EDG 8 EDG PERFORH 3 AIR ROLLS - 1 PRE-TEST & 2 POST-TEST 03/27/90 1.50 OST-1073 18-SB EDG OPERABILITY MONTHLY INTERVAL 11.33 SAMPLE AND CHANGE OIL ARE REQiD IAW MPT-M0084 ECCS 8 CSIP CHECK XORHAL OIL LEVELS 03/28/90 03/29/90 0 '5 8 ESW SCREENWASH PUMP TRIPPED ON OVER LOAD EDG 8 EDG/1SC-BAY6 8 EDG/ESW COHPLETE CORRECTIVE MAINTENANCE COMPLETE CALIBRATION 03/29/90 3.75 ESW PHP 6.9KV MTR RACKED OUT FOR LP-P-91018 ON PMP DISCH PRESS INST EDG 25.95 PUMP TRIPS FREQUENTLY ON THERMALS . EDG 8 EDG/1SC-BAY6 COMPLETE CORRECTIVE MAINTENANCE 04/11/90 OST-1013 1A SA EDG OPERABILITY MONTHLY INTERVAL EDG A EDG PERFORH 3 AIR ROLLS - 1 PRE-TEST & 2 POST-TEST 04/11/90 1.50 1.50 OST-1073 18-SB EDG OPERABILITY MONTHLY INTERVAL EDG 8 EDG PERFORM 3 AIR ROLLS - 1 PRE-TEST & 2 POST-TEST 04/24/90 6.70 CHANGE OIL ECCS A RHR COMPLETE MAINTENANCE 05/01/90 0.50 OST-1008 1A-SA RNR PUMP OPERABILITY QUARTERLY INTERVAL ECCS A RHR COMPLETE SCHEDULED TEST 05/03/90 8.83 EDG A EDG/1DG-E002 COHPLETE MAINTENANCE 05/07/90 PERFORH PREPLANNED EDG HAINTENANCE OST-1013 1A.SA EDG OPERABILITY MONTHLY INTERVAL EDG A EDG PERFORM 3 AIR ROLLS - 1 PRE-TEST & 2 POST-TEST 05/07/90 1.50 0.20 PERFORM EPT-153 ECCS C CSIP COMPLETE TEST 05/17/90 RUNNING 05/20/90 8.30 SCREEH NOT ROTATING EDG A EDG VERIFY SCREEH ROTATION WITH ESW PUMP OST-1073 1B SB EDG OPERABILITY MONTHLY INTERVAL EDG 8 EDG PERFORM 3 AIR ROLLS - 1 PRE-TEST & 2 POST-TEST 05/21/90 1.50 7.83 PERFORH LOOP CALIBRATRION LP-9101A EDG A EDG/1SW-E005 COMPLETE LP-9101A 06/04/90 16.23 MAINTENAHCE EDG A EDG/1DG-E002 COMPLETE MAINTEHANCE 06/04/90 1.50 OST-1013 1A-SA OPERABILITY MONTHLY INTERVAL EDG A EDG PERFORM 3 AIR ROLLS - 1 PRE-TEST & 2 POST-TEST 06/04/90 EOG 6.52 ADJUST/REPLACE BELTS OH AH-9A ECCS A CSIP/AH-9A RESTORE AH-9A 06/06/90 06/13/90 12.75 PREPLANNED MAIHTEHANCE REPLACE MOTOR OIL ECCS 8 RHR VERIFY OIL LEVEL 0.50 OST-1092 1B-SB RHR PUHP OPERABILITY QUARTERLY INTERVAL ECCS 8 RHR COMPLETE SCHEDULED TEST 06/14/90 1.50 OST-1073 18-SB EDG OPERABILITY MONTHLY IHTERVAL EDG 8 EDG PERFORM 3 AIR ROLLS - 1 PRE-TEST & 2 POST-TEST 06/19/90 1.50 OST-1086 18-SB EDG OPERABILITY SEMIANNUALLY EDG B EDG PERFORH 3 AIR ROLLS - 1 PRE-TEST & 2 POST-TEST 06/19/90 6.50 B CHILLER INOP DUE TO A MISPOSITIONED VALVE ECCS 8 CSIP/ESCWC REFERENCE LER 90-017 FOR CORRECTIVE ACTION 06/20/90 7.37 FAH TRIPPED UPON STARTIHG EDG B EOG/1DG-E019 COMPLETE CORRECTIVE MAINTENANCE 06/22/90 1.85 INSTALL TEST EQUIP TO VERIFY DIESEL START TIMES EDG A EDG/1DG-E002 COHPLETE TEST 06/26/90 14.33 PERFORH OIL LEAK REPAIRS AND MPT-0001 EDG A EDG/1DG.E002 COMPLETE CORRECTIVE MAINTENANCE 07/02/90 1.50 OST-1013 1A.SA EDG OPERABILITY MONTHLY INTERVAL. EDG A EDG PERFORH 3 AIR ROLLS - 1 PRE-TEST & 2 POST-TEST 07/02/90
'1.50 OST-1073 18-SB OPERABILITY MONTHLY IHTERVAL EDG 8 EDG PERFORM 3 AIR ROLLS - 1 PRE-TEST & 2 POST-TEST 07/16/90 EDG 13.40 EDG A EDG COHPLETE MAINTENANCE 07/16/90 PREPLANNED HAINTENANCE
Page 13 ATTACNHENT 'I DATE DURATION CAUSE SYSTEH/COMPONENT CORRECTIVE ACTION 07/26/90 7.67 OIL CHANGE AND SAHPLE ECCS A CSIP COHPLETE MAINTENANCE AND VERIFY OIL LEVEL 07/31/90 1.50 OST-1013 1A-SA EDG OPERABILITY MONTHLY INTERVAL EDG A EDG PERFORH 3 AIR ROLLS - 1 PRE-TEST & 2 POST-TEST 0.90 BREAKER MOO PCR-3510 FR01 ECCS A RHR/1A2-SA-5A RUN A RHR PUHP CHECK BREAKER OPERATION 08/02/90 08/02/90 0.58 IMPLEHENT BREAKER FIELD MODIFICATION ECCS A RHR RACK IN ORIGINAL UNHODIFIED BREAKER 08/08/90 0.83 PUMP BONN THE A TRAIN SUHP INSIDE CONTAINHENT ECCS A RHR COHPLETE PUHP DOMN 08/10/90 0.67 PCR-3510 480V BKR HODIFICATIOH ECCS A RHR COHPLETE MODIFICATION 08/10/90 0.50 OST-1008 1A-SA RHR PUHP OPERABILITY QUARTERLY INTERVAL ECCS A RHR COHPLETE SCHEDULED TEST EDG B EDG PERFORM 3 AIR ROLLS - 1 PRE-TEST & 2 POST-TEST 08/13/90 1.50 OST-1073 1B-SB EDG OPERABILIT'Y MONTHLY INTERVAL 7.60 OIL CHANGE AND ROUTINE PREVENTATIVE HAINTENAHCE ECCS B CSIP COHPLETE HAINTENANCE 08/14/90 0.17 REPLACE SPARE BREAKER MITH MODIFIED ORIGINAL PER PCR-3510 ECCS A RHR CYCLE BKR OBSERVE NORHAL PHP OPERATION 08/20/90 08/21/90 3.02 REMOVE ORIGINAL BKR AND INSTALL MODIFIED BKR PER PCR-35'IO ECCS B RHR CYCLE BKR OBSERVE NORHAL PMP OPERATION 35.37 REPLACE CAHSHAFT COVER GASKET AND CRANKCASE RELIEF VALVES EDG A EDG COHPLETE MAINTENANCE 08/27/90 1.50 OST-1013 1A-SA EDG OPERABILITY MONTHLY INTERVAL EDG A EDG PERFORH 3 AIR ROLLS - 1 PRE-TEST & 2 POST-TEST 08/28/90 0.37 IHSTALL PCR-3510 ECCS B RHR COHPLETE HDOIFICATION 08/30/90 09/04/90 19.28 TRANSHITTER FAILED HST-10078 ECCS A RHR/FT-605A REPLACE TRANSHITTER 6.72 EPT-150 EDG 8 EDG/1QI-E006 RESTORE EQI PER EPT-150 09/05/90 PERFORM 1.50 OST-1073 1B-SB EDG OPERABILITY MONTHLY INTERVAL EDG B EDG PERFORH 3 AIR ROLLS - 1 PRE-TEST & 2 POST-TEST 09/10/90 0.25 VALVE FAILED TO STROKE SHUT DURING OST-1215 EDG A EDG/1SN-276 CLOSE 1Sll-276 09/12/90 09/14/90 0.50 OST-1092 1B-SB RHR PUHP OPERABILITY QUARTERLY INTERVAL ECCS 8 RHR COHPLETE SCHEDULED TEST 1.50 OST-1013 1A-SA EDG OPERABILITY MOHTHLY INTERVAL EDG A EDG PERFORH 3 AIR ROLLS - 1 PRE-TEST & 2 POST-TEST 09/24/90 1.50 EDG A EDG PERFORM 3 AIR ROLLS - 1 PRE-TEST & 2 POST-TEST 09/25/90 OST-1085 1A-SA EDG OPERABILITY SEHIANNUALLY 3.92 EDG 8 EDG COHPLETE MAINTENANCE 10/07/90 PERFORH MPT-H0011 VALVE COVER GASKET REPLACEMENT 9.80 TROUBLESNOOTIHG PROBLEH IIITH COHTROL AIR LEAK EDG 8 EDG COHPLETE CORRECTIVE HAINTENANCE 10/11/90 1.50 OST-1073 1B-SB EDG OPERABILITY MOHTHLY INTERVAL EDG 8 EDG PERFORM 3 AIR ROLLS - 1 PRE-TEST & 2 POST-TEST 10/12/90 10/22/90 1.50 OST-1013 1A-SA EDG OPERABILITY MONTHLY INTERVAL EDG A EDG PERFORH 3 AIR ROLLS - 1 PRE-TEST & 2 POST-TEST -'IO/24/90 3.50 CHANGE OIL ECCS A RHR COHPLETE HAINTENANCE 10/25/90 0.50 OST-1008 1A-SA RHR PUHP OPERABILITY QUARTERLY INTERVAL ECCS A RHR COMPLETE SCHEDULED TEST 11/03/90 28.75 REPAIR LEAK ON EQUALIZIHG LINE ECCS B CSIP COHPLETE CORRECTIVE MAIN'IENANCE 1.50 OST-1073 1B-SB EDG OPERABILITY MONTHLY INTERVAL EDG 8 EDG PERFORM 3 AIR ROLLS - 1 PRE-TEST & 2 POST-TEST 11/04/90 11/07/90 2.33 PERFORH LOOP CALIBRATIOH OH T-6522A ECCS A CSIP/AH-9A COHPLETE LOOP CALIBRATION 51.28 ECCS A CSIP COMPLETE EPT-097 11/07/90 DECHROHATING SKID ATTACHED ACROSS A CCM PUMP 11/12/90 1.33 LINKAGE ON VALVE ACTUATOR IS BROKEN ECCS A CSIP/1SM-1055 COHPLETE CORRECTIVE MAINTEHANCE 1.50 OST-1013 1A-SA EDG OPERABILITY MONTHLY INTERVAL EDG A EDG PERFORH 3 AIR ROLLS - 1 PRE-TEST & 2 POST-TEST 11/19/90 12/03/90 1 ~ 50 OST-1086 1B-SB EDG OPERABILITY SEHIANNUALLY EDG B EDG PERFORH 3 AIR ROLLS - 1 PRE-TEST & 2 POST-TEST 12/03/90 1.50 OST-1073 18-SB EDG OPERABILITY MONTHLY INTERVAL EDG 8 EDG PERFORH 3 AIR ROLLS - 1 PRE-TEST &I 2 POST-TEST 12/06/90 5.08 CHANGE LUBE OIL EDG A EDG COHPLETE MAINTENANCE 12/11/90 3.85 PERFORH HPT-H0084 AND PM-M0074 OIL CHANGE ECCS B RHR COHPLETE HAINTENANCE 12/12/90 0.50 OST-1092 1B-SB RHR PUMP OPERABILITY QUARTERLY INTERVAL ECCS B RHR COMPLETE SCHEDULED TEST
Page 14 ATTACHMENT 1 DATE DURATION CAUSE SYSTEM/COMPONENT CORRECTIVE ACTION 12/17/90 37.68 INSPECT CYLINDER HEADS 8 REPLACE LEAK GASKET EDG A EDG COMPLETE MAINTENANCE 1.50 OST-1013 1A-SA EDG OPERABILITY MONTHLY IHTERVAL EDG A EDG PERFORM 3 AIR ROLLS - 1 PRE-TEST F 2 POST-TEST 12/18/90 12/27/90 37.92 TROUBLESHOOT MHY VALVE HILL NOT OPEN ECCS A CSIP/1SI-1 COMPLETE CORRECTIVE MAINTEHANCE 1.50 OST-1073 18-SB EDG OPERABILI'TY MONTHLY INTERVAL EDG B EDG PERFORM 3 AIR ROLLS - 1 PRE-TEST 8 2 POST. TEST 12/31/90 12/31/90 4.17 AN-9A U/C TO REPLACE BELTS THIS INOPS A CSIP ECCS A CSIP/AH-9A COMPLETE CORRECTIVE MAINTENANCE 01/02/91 10.15 REPLACE PRESSURE SNITCH FOR 86 LO RELAY EDG 8 EDG COMPLETE CORRECTIVE MAINTENANCE 4.35 PERFORM LP-T-6502B LOOP CALIBRATIOH ECCS B RHR/AH-58 COMPLETE LP-T-65028 01/08/91 0.47 RETEST AUX RESERVOIR SCREENS ON Ml SPEED AFTER COIL REPLACEMENT EDG 8 EDG COMPLETE MAINTENANCE AND TEST 01/12/91 1.50 OST-1013 1A-SA EDG OPERABILITY MONTHLY INTERVAL EDG A EDG PERFORH 3 AIR ROLLS - 1 PRE-TEST 8 2 POST-TEST 01/14/91 8.67 PERFORM EPT-300 ON CS-210( C CSIP MINIFLN ISOLATION ECCS 8 CSIP COMPLETE PERIODIC TEST 01/22/91 4.52 PERFORH LOOP CALIBRATIOH LP-T-65228 ECCS B CSIP/AH-9B COMPLETE LOOP CALIBRATION 01/22/91 01/22/91 30.33 PCR-5435 AND LIHITORQUE INSPECTION ECCS 8 RHR/1RH-69 COMPLETE MODIFICATION AND INSPECTION 01/22/91 30.33 PCR-5435 AND LIMITORQUE INSPECTION ECCS 8 CSIP/1SI-2 COMPLETE MODIFICATION AHD INSPECTION 01/24/91 9.72 ADJUST SEAL TAKE LO SAMPLES CHG OIL 8 GREASE IN COUPLING ECCS A CSIP VERIFY PROPER OIL LEVEL 8 NO OIL LEAKS 1.50 OST-1073 18-SB EDG OPERABILITY MONTHLY INTERVAL EDG 8 EDG PERFORM 3 AIR ROLLS - 1 PRE-TEST 8 2 POST-TEST 01/28/91 01/28/91 8.08 PLANNED MAINTENANCE EDG 8 EDG COMPLETE MAIHTEHANCE 02/11/91 1.02 PERFORM LP-T-6589A LOOP CALIBRATIOH EDG A EDG/1EV-A86A COMPLETE LOOP CALIBRATION 02/11/91 14.38 INSTALL HEN SHUTTLE VALVE EDG A EDG COMPLETE VALVE REPLACEMEHT 1.50 OST-1013 1A-SA EDG OPERABILITY MONTHLY INTERVAL EDG A EDG PERFORM 3 AIR ROLLS - 1 PRE-TEST 8 2 POST-TEST 02/11/91 02/12/91 1.18 REPLACE BREAKER OH 1CS-946 ECCS A CS IP/1CS-946 VERIFY VALVE STROKES 02/12/91 57.28 INSTALL VOTES OH VARIOUS RHR VALVES PCR-5435 ECCS A RMR COMPLETE TEST AND MAIHTEHANCE 02/14/91 0.50 OST-1008 1A-SA RNR PUMP OPERABILITY QUARTERLY INTERVAL ECCS A RHR COMPLETE SCHEDULED TEST 02/25/91 1.50 OST-1073 1B-SB EDG OPERABILITY MONTHLY INTERVAL EDG 8 EDG PERFORM 3 AIR ROLLS - 1 PRE-TEST 8 2 POST-TEST 02/26/91 1 ~ 57 PERFORM LOOP CALIBRATIOH ON TEMPERATURE LOOP EDG A EDG/EBBA COMPLETE LOOP CALIBRATION 02/27/91 42.58 B LOOP OUTAGE VARIOUS JOBS IN MODE 5-6 ECCS 8 RHR COMPLETE MAINTENANCE 03/02/91 0.50 OST-1092 1B-SB RHR PUMP OPERABILI'TY QUARTERLY INTERVAL ECCS B RHR COMPLETE SCHEDULED TEST 03/06/91 7.37 REPLACE QUICK VENT SHUTTLE VALVE EDG 8 EDG COMPLETE VALVE REPLACEMENT A EDG PERFORM 3 AIR ROLLS - 1 PRE-TEST 8 2 POST-TEST 03/11/91 1.50 OST-1085 1A-SA EDG OPERABILITY SEMIANNUALLY EDG 03/11/91 1.50 OST-1013 1A-SA EDG OPERABILITY MONTHLY INTERVAL EDG A EDG PERFORM 3 AIR ROLLS - 'I PRE-TEST 8 2 POST-TEST 03/13/91 5.50 BOTH CSIPS IHOP DUE TO 8 SEQUENCER RELAYS FAILIHG ECCS 8 CSIP/B SEQ REFERENCE LER 91-005 FOR CORRECTIVE ACTIOH 03/13/91 0.95 VOTES TESTING ON 1CS-182 ECCS A CSIP/1CS-182 COMPLETE TESTING 03/14/91 0.13 8 CHILLER INOP DUE FAILED PERFORMANCE TESTS ECCS B CSIP/ESCIIC REFERENCE LER 91-004 FOR CORRECTIVE ACTION 03/14/91 1.50 OST-1823 1A.SA EDG OPERABILITY 18 MONTH EDG A EDG PERFORM 3 AIR ROLLS - 1 PRE-TEST 8 2 POST-TEST 03/14/91 8.72 VOTES TESTING 8 TORQUE SNITCH SETTING ECCS A CSIP/1CS-182 COMPLETE TESTING 03/20/91 3.00 VALVE TNERHALS OUT DURIHG OPERATION EDG A EDG/1'-270 COMPLETE CORRECTIVE MAINTENANCE 03/25/91 1.86 BOTH TRAINS OF ESll MERE REMOVED FROM SERVICE ECCS RHR/ESM/CCll REFERENCE LER 91-007 FOR CORRECTIVE ACTION 03/29/91 1.50 OST-1013 1A-SA EDG OPERABILITY MONTHLY INTERVAL EDG A EDG PERFORM 3 AIR ROLLS - 1 PRE-TEST 8 2 POST-TEST 03/31/91 1.50 OST-1073 1B-SB EDG OPERABILITY MOHTHLY INTERVAL EDG 8 EDG PERFORM 3 AIR ROLLS'- 1 PRE-TEST 8 2 POST-TEST
0 Page 15 ATTACHMENT 1 DATE DURATION CAUSE SYSTEH/COMPONENT CORRECTIVE ACTION 1.50 OST-1013 1A-SA EDG OPERABILITY MONTHLY INTERVAL EDG A EDG PERFORH 3 AIR ROLLS - 1 PRE-TEST 8 2 POST-TEST 04/16/91
'0 OST.1823 1A-SA EDG OPERABILITY 18 MONTH EDG A EDG PERFORM 3 AIR ROLLS - 1 PRE-TEST 8 2 POST-TEST 04/16/91 1 1.50 OST-1013 1A-SA EDG OPERABILITY MONTHLY INTERVAL EDG A EDG PERFORM 3 AIR ROLLS - 1 PRE-TEST 8 2 POST-TEST 04/18/91 1.50 OST-1823 1A-SA EDG OPERABILITY 18 MOHI'H EDG A EDG PERFORH 3 AIR ROLLS - 1 PRE-TEST 8 2 POST-TEST 04/18/91 0.50 OST-1092 1B-SB RHR PUHP OPERABILITY QUARTERLY INTERVAL ECCS 8 RHR COMPLETE SCHEDULED TEST 04/24/91 0.50 OST-1008 1A-SA RHR PUMP OPERABILITY QUARTERLY IHTERVAL ECCS A RKR COMPLETE SCHEDULED TEST 04/24/91 1.50 OST 1073 18-SB EDG OPERABILITY MONTHLY INTERVAL EDG 8 EDG PERFORH 3 AIR ROLLS - 1 PRE-TEST 8 2 POST-TEST 04/25/91 05/01/9'I 1.50 OST-1824 1B-SB EDG OPERABILITY 18 MONTH EDG B EDG PERFORM 3 AIR ROLLS - 1 PRE-TEST 8 2 POST-TEST 1.50 OST-1073 1B-SB EDG OPERABILITY MOHTHLY IHTERVAL EDG 8 EDG PERFORM 3 AIR ROLLS - 1 PRE-TEST 8 2 POST-TEST 05/04/91 1.50 OST-1824 1B-SB EDG OPERABILITY 18 MONTH EDG 8 EDG PERFORH 3 AIR ROLLS - 1 PRE-TEST 8 2 POST-TEST 05/04/91 1.50 OST-1824 18-SB EDG OPERABILITY 18 MONTH EDG B EDG PERFORH 3 AIR ROLLS - 1 PRE-TEST 8 2 POST-TEST 05/07/91 OST-1824 18-SB EDG OPERABILITY 18 MONTH EDG 8 EDG PERFORH 3 AIR ROLLS - 1 PRE-TEST 8 2 POST-TEST 05/07/91 '.50 0.38 DISCHARGE VALVE SHUT FOR STROKING SI VALVES ECCS A CSIP COMPLETE TESTING 05/08/91 0.08 DISCHARGE VALVE SHUT TO STROKE 1SI-107 ECCS A CSIP COMPLETE TESTING 05/08/91 05/08/91 0.88 DISCHARGE VALVE SHUT TO STROKE 'IS1-107 ECCS A CSIP COMPLETE TESTING 144.00 ECCS RUST REFERENCE LER 91-011 FOR CORRECTIVE ACT ION 05/12/91 RUST BOROH HIGHER THAN ALLOMED 5.53 REPLACE GENERATOR BEARING TEMPERATURE SNITCH EDG A EDG COMPLETE CORRECI'IVE MAINTENANCE 05/23/91 1.50 OST-1013 1A-SA EDG OPERABILITY MONTHLY INTERVAL EDG A EDG PERFORM 3 AIR ROLLS - 1 PRE-TEST 8, 2 POST-TEST 05/24/91 5.62 ECCS 8 CSIP COMPLETE CORRECTIVE MAIHTEHAHCE 05/29/91 OIL COOLER SERVICE MATER LEAK 06/02/91 1.42 SHEAR PIN BROKEN OH AUX TRAV SCREEN EDG 8 EDG REPAIR, VERIFY PROPER OPERATION '0 OST-1073 1B-SB EDG OPERABILITY MONTHLY INTERVAL EDG 8 EDG PERFORM 3 AIR ROLLS - 1 PRE-TEST 8 2 POST-TEST 06/05/91 1 12.92 REPAIR/REPLACE 1DFO-213 VALVE EDG 8 EDG REPLACE LEAKING VALVE
- 06/05/91 1.50 OST-1086 18-SB EDG OPERABILITY SEMIANNUALLY EDG 8 EDG PERFORH 3 AIR ROLLS - 1 PRE-TEST 8 2 POST-TEST 06/05/91 0.25 PACKING ADJUSTMENT RESULTS IN LOSS OF ECCS ECCS 8 CSIP/A RHR/CQI REFERENCE LER 91-014 FOR CORRECTIVE ACT ION 06/12/91 06/12/91 0 '0 CCll FLSI TO A RHR PUMP llAS LOST ECCS ECCS A RHR B RHR RESTORE CCLI FLml COMPLETE SCHEDULED TEST 06/17/91 0.50 OST-1092 18-SB RHR PUMP OPERABILITY QUARTERLY INTERVAL 06/19/91 3.17 BELT INSPECTIOH ECCS 8 CSIP/AH-98 INSTALL NEM BELTS 9.25 ECCS A CSIP/AH-9A COMPLETE BELT ADJUSTMEHTS 06/20/91 TIGHTEN BELTS 25.67 EDG A EDG/1SII-E041 COMPLETE CORRECTIVE MAINTENANCE 06/20/91 REPLACE STRAINER 22.42 STRAIGHTEN UPPER STEH ON VALVE 1CC-142 ECCS A RHR/1CC-147 COMPLETE CORRECTIVE MAIHTEHAHCE 06/20/91 06/20/91 1.63 COMPLETE LP-T-6502A LOOP CALIBRATIOH ECCS A RKR/AH-SA COMPLETE LOOP CALIBRATIOH 9.25 CHANGE OIL IH PUHP ECCS A CSIP COMPLETE MAINTENANCE 06/20/91 06/20/91 27.82 INSP ~ ST AIR CAM, REPAIR OIL LEAK ON HUMPHREY VALVE EDG A EDG COMPLETE INSPECTIONS AND MAINTENAHCE 06/20/91 2.97 PERFORH CALIBRATION PIC-l 032 ECCS A RHR/RH-602ASll COMPLETE CALIBRATION 25.67 EDG A EDG/1SH-E005 REPLACE MOTOR BEARINGS 06/20/91 IHSPECT/REPLACE UPPER MOTOR BEARING 06/20/91 27.82 INSPECT SUCTION STRAINER .EDG A EDG/1DFO-E002 COHPLETE INSPECTIONS EDG A EDG PERFORM 3 AIR ROLLS - 1 PRE-TEST 8 2 POST-TEST-06/21/91 1.50 OST-1013 1A-SA EDG OPERABILITY MONTHLY INTERVAL 07/01/91 1.50 OST-1073 18-SB EDG OPERABILITY MONTHLY INTERVAL EDG 8 EDG PERFORM 3 AIR ROLLS - 1 PRE-TEST 8 2 POST-TEST
k fJ
Page 16 ATTACHMENT 1 DATE 'DURATIOH CAUSE SYSTEH/COHPONENT- CORRECTIVE ACTION 07/03/91 10.30 INSPECT/PUMP AND CHANGE OIL ECCS 8 CSIP COMPLETE OIL CHANGE 3.13 REPLACE DIRTY LUBE OIL FILTER EDG 8 EDG COHPLElE CORRECTIVE MAINTEHANCE 07/06/91 1.50 OST-1013 1A-SA EDG OPERABILITY MONTHLY INTERVAL EDG A EDG PERFORM 3 AIR ROLLS - 1 PRE-TEST 8 2 POST-TEST 07/16/91 07/16/91 3.68 REPAIR MELD LEAK ON EQUALIZING LINE ECCS 8 CSIP LEAK CHECK EQUALIZING LINE 0.50 OST-1008 1A-SA RHR PUMP OPERABILITY QUARTERLY INTERVAL ECCS A RHR COHPLETE SCHEDULED TEST 07/17/91 07/26/91 2.67 SMAPPIHG TO 1B-SB CSIP ECCS C CSIP COHPLETE SMAP 10.22 1RH-31 lIILL HOT AUTO OPEN ON LOM FLOM ECCS A RHR COMPLETE CORRECTIVE MAINlENANCE AND CALIBRATION 07/28/91
'0 OST-1073 18-SB EDG OPERABILITT HONTHLY INTERVAL EDG 8 EDG PERFORM 3 AIR ROLLS - 1 PRE-TEST 8 2 POST-TEST 07/29/91 1 RHR PINP OPERABILITT QUARTERLY INTERVAL ECCS 8 RHR COHPLETE SCHEDULED TEST 07/30/91 0.50 OST-1092 18-SB 0 F 50 OST-1092 18-SB RHR PUMP OPERABILITY QUARTERLY INTERVAL ECCS B RHR COHPLETE SCHEDULED TEST 07/30/91 0.73 INSTALL TEST EQUIPHENT FOR EPT-184 ECCS 8 CSIP/1CS-755 COMPLETE TESTING REMOVE TEST EQUIPMENT 08/01/91 1.62 CALIBRATE FS-69058-SB EDG A EDG/AH-85 COHPLETE CALIBRATIONS 08/07/91 08/11/91 22.18 DISASSEMBLE, BEHCH TEST & REPLACE RELIEF VALVE 'CCS 8 RHR/1CC-165 COHPLETE TEST 1.50 OST-1013 1A-SA EDG OPERABILITY MONTHLY IHTERVAL EDG A EDG PERFORH 3 AIR ROLLS - 1 PRE-TEST 8 2 POST-TEST 08/13/91 1.23 INSTALL TEST EQUIPMENT FOR EPT-183 ECCS A CSIP/1CS-744 COHPLETE TESTING REHOVE TEST EQUIPMENT 08/16/91 15.00 RUNNING 2 PUMPS CAUSES 1CC-145 To LIFT ECCS A RHR/1CC-145 COMPLETE CORRECTIVE MAINlENANCE 08/16/91 5.78 PERFORMANCE OF LP-T-6904B EDG 8 EDG COHPLETE CALIBRATIONS 08/29/91 1.50 OST-1073 18-SB EDG OPERABILITY HOHTHLT IHTERVAL EDG 8 EDG PERFORM 3 AIR ROLLS - 1 PRE-TEST & 2 POST-TEST 08/30/91 10.68 PRESS. QIITCH MOULD NOT RESET DURIHG OST-1215 EDG B EDG/8752BSB COHPLETE CORRECTIVE MAINTENANCE 08/31/91 5.18 MOULD NOT DEVELOP REQ'D FLOM IAM OST-1215 EDG 8 EDG/1SC-BAY6 COHPLETE CORRECTIVE MAINTENANCE 08/31/91 4.43 PERFORM LOOP CALIBRATIONS ON LP-T-6904A EDG A EDG COMPLETE LOOP CALIBRATIOHS 09/04/91 0.58 FAILED EPT-033 EDG A EDG/A SEQ COMPLETE PERIODIC TEST 09/09/91 1.50 OST-1085 1A-SA EDG OPERABILITY SEMIANNUALLY EDG A EDG PERFORH 3 AIR ROLLS - 1 PRE-TEST & 2 POST-TEST 09/09/91 EDG A EDG PERFORH 3 AIR ROLLS - 1 PRE-TEST 8 2 POST-TEST 09/09/91 F 50 OST-1013 1A-SA EDG OPERABILITY MONTHLY INTERVAL 0.50 OST-1092 1B-SB RHR PUMP OPERABILITY QUARTERLY INTERVAL ECCS 8 RHR COHPLETE SCHEDULED TEST 09/16/91 09/20/9'I 1.50 LOOP CALIBRATIONS EDG A EDG COHPLETE LOOP CALIBRATIONS 1.50 OST-1073 1B-SB EDG OPERABILITY MONTHLY INTERVAL EDG 8 EDG PERFORH 3 AIR ROLLS - 1 PRE-TEST & 2 POST-TEST 09/24/91 EDG 8 EDG/1DG-E019 COMPLETE CORRECTIVE HAIHlENANCE 10/02/91 2.57 MORK ON DG-045B 1 MOTOR OPERATED DAMPER '0 OST-1013 1A-SA EDG OPERABILITY MONTHLY INTERVAL EDG A EDG PERFORH 3 AIR ROLLS - 1 PRE-TEST & 2 POST-TEST 10/07/91 1 0.50 OST-1008 1A-SA RHR PUMP OPERABILITT QUARTERLY INTERVAL ECCS A RHR COHPLETE SCHEDULED TEST 10/08/91 10/17/91 0.90 PACKING ADJUSTMENT ECCS A CSIP/1CS-182 COHPLETE CORRECTIVE MAINTENANCE 1.50 OST-1073 18-SB EDG OPERABILITY MONTHLY INTERVAL EDG 8 EDG PERFORH 3 AIR ROLLS - 1 PRE-TEST 8 2 POST-TEST 10/21/91 0.50 OST-1092 1B-SB RHR PUMP OPERABILITY QUARTERLY INTERVAL ECCS 8 RHR COMPLETE SCHEDULED TEST 10/22/91 59.00 INOPERABLE To CLEAN EQI SCREEN IIASH PUHP EDG A EDG/ESM COMPLETE CORRECTIVE MAINlENANCE 10/23/91
ATTACHMENT 2 GLOSSARY OF TERMS/ABBREVIATIONS USED ON ATTACHMENT ACCUM Accumulator for low head injection AH Air handler ALT Alternate BKR Circuit breaker CCW Component cooling water CM Corrective maintenance CSIP Charging .safety injection pump for high h ead safety injection EDG Emergency diesel generator ESCWC Essential service chilled water chiller ESW Emergency service water EPT Engineering periodic test EQ Equipment qualification (environmental) FO Fuel oil FR Field revision FREQ Frequency FS Flow switch HFA A type of "General Electric" relay HVAC Heating ventilation air conditionxng IND Indicator INOP Inoperable INSP Inspection ISI Inservice inspection LER Licensee event report LO Lock out LVL Level MOD Modification MOV Motor operated valve MST Maintenance surveillance test OOS Out of service OST Operations surveillance test PCR Plant change request. PMP Pump RECIR Reczrculating RHR Residual heat removal system for low head safety injection RWST Reactor water storage tank SAT Satisfactory SEQ Sequencer TS Technical specification VLCO Voluntary lzmited condition of operation XFER Transfer