ML19256F159
ML19256F159 | |
Person / Time | |
---|---|
Site: | 05000516, 05000517 |
Issue date: | 10/29/1979 |
From: | Plaskon R LONG ISLAND LIGHTING CO. |
To: | Grier B NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I) |
References | |
IEB-79-23, NUDOCS 7911210554 | |
Download: ML19256F159 (1) | |
Category:CORRESPONDENCE-LETTERS
MONTHYEARML17329A1471991-08-30030 August 1991
[Table view]Forwards Semiannual Radioactive Effluent Release Rept for Jan-June 1991.W/o Encl ML20055C6081990-05-16016 May 1990 Responds to Outlining Concerns Re Info Notice 88-056, Potential Problems W/Silicone Foam Fire Barrier Penetration Seals. Silicone Foam Acceptable Matl Provided Certain Installation Parameters Controlled ML18037A3791982-05-27027 May 1982 Forwards Annual Financial Repts 1981 for Niagara Mohawk Power Corp,Ny State Electric & Gas Corp,Lilco,Rochester Gas & Electric Corp & Central Hudson Gas & Electric Corp ML20003H2821981-04-30030 April 1981 Forwards Resolutions of SER Issues 10,11,12,40,41,42,49 & 56.Also Forwards Annual Financial Repts 1979 & 1980 ML19338F4861980-10-10010 October 1980 Notifies That Future NRC Correspondence Re Facilities Should Be Addressed to Cj Davis ML19347C0541980-10-0808 October 1980 Forwards Petition for Rehearing in Case 80003 Re Application for Certificate of Environ Compatibility & Public Need. Certificate of Svc Encl ML19338E5731980-09-30030 September 1980 Informs That Correspondence for Nuclear Responsibilities Should Be Addressed to Ms Pollock ML19338F6191980-09-16016 September 1980 Responds to IE Bulletin 80-20, Failure of Westinghouse Type W-2 Spring Return to Neutral Control Switches. Westinghouse Has Not Fabricated Any Control Cabinets for safety-related Equipment Using Specified Switches ML19351D6041980-09-10010 September 1980 Comments on Proposed Rules 10CFR50 & 51 Re Statement of Interim Policy on Nuclear Power Plant Accident Considerations Under Nepa.Supports Commission Approach as Interim Guidance ML19338E6701980-08-20020 August 1980 Responds to IE Bulletin 80-16.Plant Design Does Not Include Rosemount Model 1151 & 1152 Pressure Transmitters ML19330C3081980-08-0101 August 1980 Responds to D Eisenhut 800702 Ltr Re Estimates of Evacuation Time for Site.Info Will Be Developed Upon Receipt of Ny State Board on Electric Generation Siting & Environ Certification ML19320D5541980-07-0101 July 1980 Responds to IE Bulletin 80-08 Re Containment Liner Penetration Weld Examinations.Penetrations Will Be Fabricated Per Reg Guide 1.19.Butt Welds Will Be Radiographed ML19318C0131980-06-12012 June 1980 Requests Verification of Address.Related Correspondence ML19318C1271980-06-0505 June 1980 Responds to IE Bulletin 80-05, Vacuum Condition Resulting in Damage to Chemical Vol Control Sys (CVCS) Holdup Tanks. Engineering Activities Have Been Curtailed to Point Where Detail Design Data Requested Is Unavailable ML19318B0361980-05-28028 May 1980 Responds to IE Bulletin 79-03A, Longitudinal Weld Defects in ASME SA-312 Type 304 Stainless Steel. All Westinghouse- Supplied Pipe for Use on NSSS Is Either of Forged Seamless or Centrifugal Cask Const ML18037A2561980-05-19019 May 1980 Forwards Annual Financial Repts,1979 for Central Hudson Gas & Electric Corp,Long Island Lighting Co,Ny State Electric & Gas Corp & Rochester Gas & Electric ML19309E4301980-03-19019 March 1980 Responds to IE Bulletin 80-03.Charcoal Adsorber Cells Have Not Been Purchased ML19309D0781980-02-26026 February 1980 Comments on Proposed Rule 10CFR50 on Behalf of Suffolk County,Ny:Emergency Planning Must Be Viewed as Equivalent Rather than Secondary to Siting Design in Achieving Public Protection ML19296D6701980-02-0707 February 1980 Responds to IE Bulletin 79-28, Possible Malfunction of Namco Model EA180 Limit Switches at Elevated Temps. No Switches Purchased Yet.If Purchased,Suitable Controls Will Be Instituted ML19322D7141980-02-0101 February 1980 Advises of Ny State Board on Electric Generation Siting & Environ 800129 Denial of Lilco Application for Const of Facility at Jamesport,Ny ML19320C8011980-01-23023 January 1980 Requests That NRC Amend Proposed Regulation Re Formulation of Evacuation Plan to Include All Territory East of Facility.Proposed 10-mile Radius Is Unworkable for People of Long Island.Responsible Plan Should Be Developed ML19305B4501980-01-23023 January 1980 Comments on Proposed Rule 10CFR50:commends NRC for Taking Action Re Evacuation Plan as Need for Comprehensive & Uniform Policy Is Long overdue.Ten-mile Radius Would Be Unworkable in New York City & Should Be Reconsidered ML19290D0331980-01-11011 January 1980 Responds to IE Bulletin 79-02,Revision 2.Expansion Anchor Bolts Will Not Be Used in Concrete Block Walls to Attach Piping Support of Seismic Category I Sys.Steel Members Will Not Be Attached Directly to Concrete Walls ML19284A8091980-01-0707 January 1980 Responds to IE Bulletin 79-25, Failure of Westinghouse Bfd Relays in Safety-Related Sys. No Westinghouse Relays Used or Planned for Use in safety-related Sys ML19260E1341979-12-14014 December 1979 FOIA Request for Documents Re Jamesport Nuclear Power Station,Units 1 & 2 ML19254F2641979-11-0202 November 1979 Discusses Brookhaven Draft Rept on Response Combination. Mark II Owners Group Suggests Criteria Should Include Provisions for Application to Load & Response Levels ML19256F1591979-10-29029 October 1979 Responds to IE Bulletin 79-23.Purchase Order for Emergency Diesel Generators Has Not Been Placed.Will Ensure Compliance by Testing Generator During Preoperational Test Program ML19250C3951979-10-29029 October 1979 Responds to IE Bulletin 79-14, Seismic Analyses for As-Built Safety-Related Piping Sys. Safety-related Sys Not Seismically Analyzed Because of Const to Start in 1982.Insp Will Be Done According to Util QA Program ML19276G9001979-08-18018 August 1979 Informs That No Security Training & Qualification Program Is Presently Being Developed.Due to Current Project Schedule, Program Would Be Premature ML19274G1351979-07-20020 July 1979 Responds to IE Bulletin 79-11.Purchase Orders for Circuit Breakers in safety-related Sys Not Placed. Particular Circuit Breakers to Be Used Are Unknown ML19242B2601979-07-0606 July 1979 Submits Response to IE Bulletin 79-02,Revision 1,re Plant Design.Info Pertains to Project Design Procedure & Spec for drilled-in Anchors,Cyclic Loadings & Pipe Support Base Plate Configurations ML19247A2961979-06-12012 June 1979 Responds to IE Bulletin 79-09.Purchase Orders for Circuit Breakers in safety-related Sys Have Not Been Placed.If GE Type AK-2 Circuit Breakers Are Used,Preventive Maint Program Will Be Conducted ML19269E9111979-05-30030 May 1979 Responds to IE Bulletin 79-07.No Seismic Stress Analyses of safety-related Piping Have Been Performed.Intends to Use Nupipe Computer Program for Piping Analysis ML19224D4281979-05-28028 May 1979 Forwards Suffolk County,Ny Legislature Opposing Facility Const ML19276G6421979-05-28028 May 1979 Forwards Resolution 474,adopted by County Legislature of Suffolk County,Ny in Opposition to Plant Const ML19242B4151979-05-25025 May 1979 Responds to IE Bulletin 79-04.No Purchase Orders Issued for Swing Check Valves.Qa Program Vendors W/Acceptable Method for Determining & Verifying Correct Valve Weights Will Be Selected ML19269E9001979-05-11011 May 1979 Responds to IE Bulletin 79-03.Station Design Reviewed & Welded Pipe Is Not Used in Westinghouse NSSS ML19246C0611979-05-10010 May 1979 Notifies That Suffolk County,Ny Legislature Passed Resolution Opposing CP Sought by Util ML19289E7851979-04-13013 April 1979 Requests Inclusion of Ny Dept of Public Svc on Svc List for Ny Siting Proceeding ML19274E6201979-03-0909 March 1979 Forwards Updated 1978 & 1979 Peak Load Forecasts of Long Island Lighting Co & Ny State Electric & Gas Corp.Also Compares Applicants' 1979 Forecasts to Total Controlled Sources & Required Capability for 1988-1992 ML20062H0441979-03-0808 March 1979 Forwards IE Bulletin 79-02, Pipe Suport Base Plate Designs Using Concrete Expansion Anchor Bolts ML19296A4551979-02-14014 February 1979 Ack Receipt of 790208 Ltr Advising of Classified Document Re Issue of Sabotage of Spent Nuclear Fuel at Facility.Requests Aid in Bringing Draft Document to Attention of Local Law Enforcement Officials ML19269C9981979-01-26026 January 1979 Advises of 790122 Prehearing Conference & Sets Schedule for Upcoming Evidentiary Hearings on Reopened Issues.Siting Board'S Order Directing Remand Requires Decision by Sept 1979 ML19274D3561979-01-19019 January 1979 Forwards Final Rept on Archaeological Salvage Excavation at Hallock'S Pond Site,Nov 1978.Encl Available in Central Files ML19270F5861979-01-12012 January 1979 Ack Receipt of ASLB Initial Decision.Requests Detailed Studies Used as Basis for Decision on once-through Cooling Sys ML19259A7081979-01-0505 January 1979 in Response to NRC 781206 Ltr,Util States They Have Been Complete & Accurate in Submittals & Prompt in Correcting Errors.If NRC Disagrees,Examples Should Be Cited ML19259A6001979-01-0202 January 1979 Requests Issuance of Const License Pursuant to Initial Decision of ASLB Dtd 781226.Forwards Payment of Licensee Fee Under Protest & Payment Shall Not Be Deemed Waiver of Applicant'S Rights to Seek Refund ML19282C3131978-12-27027 December 1978 Forwards 781222 Order Directing Remand,Reopening Jamesport Record on Issues of Need,Comparative Economics & Alternatives.W/O Encl ML19305A0801978-12-0707 December 1978 Advises That Ny State Board on Electric Generation Siting & the Environ Reopened Hearing Record on 781121.Board's Decision Will Be Forwarded to Aslab ML20062G3981978-12-0606 December 1978 Emphasizes Importance of Submitting Accurate & Complete Info to NRC by Licensee & Applicants.Info Submitted Must Be Substantiated by Data & Calculations.Licensee Must Notify NRC of Any Inaccuracies or Enforcement Action Will Result 1991-08-30 Category:INCOMING CORRESPONDENCE MONTHYEARML17329A1471991-08-30030 August 1991
[Table view]Forwards Semiannual Radioactive Effluent Release Rept for Jan-June 1991.W/o Encl ML18037A3791982-05-27027 May 1982 Forwards Annual Financial Repts 1981 for Niagara Mohawk Power Corp,Ny State Electric & Gas Corp,Lilco,Rochester Gas & Electric Corp & Central Hudson Gas & Electric Corp ML20003H2821981-04-30030 April 1981 Forwards Resolutions of SER Issues 10,11,12,40,41,42,49 & 56.Also Forwards Annual Financial Repts 1979 & 1980 ML19338F4861980-10-10010 October 1980 Notifies That Future NRC Correspondence Re Facilities Should Be Addressed to Cj Davis ML19338E5731980-09-30030 September 1980 Informs That Correspondence for Nuclear Responsibilities Should Be Addressed to Ms Pollock ML19338F6191980-09-16016 September 1980 Responds to IE Bulletin 80-20, Failure of Westinghouse Type W-2 Spring Return to Neutral Control Switches. Westinghouse Has Not Fabricated Any Control Cabinets for safety-related Equipment Using Specified Switches ML19351D6041980-09-10010 September 1980 Comments on Proposed Rules 10CFR50 & 51 Re Statement of Interim Policy on Nuclear Power Plant Accident Considerations Under Nepa.Supports Commission Approach as Interim Guidance ML19338E6701980-08-20020 August 1980 Responds to IE Bulletin 80-16.Plant Design Does Not Include Rosemount Model 1151 & 1152 Pressure Transmitters ML19330C3081980-08-0101 August 1980 Responds to D Eisenhut 800702 Ltr Re Estimates of Evacuation Time for Site.Info Will Be Developed Upon Receipt of Ny State Board on Electric Generation Siting & Environ Certification ML19320D5541980-07-0101 July 1980 Responds to IE Bulletin 80-08 Re Containment Liner Penetration Weld Examinations.Penetrations Will Be Fabricated Per Reg Guide 1.19.Butt Welds Will Be Radiographed ML19318C0131980-06-12012 June 1980 Requests Verification of Address.Related Correspondence ML19318C1271980-06-0505 June 1980 Responds to IE Bulletin 80-05, Vacuum Condition Resulting in Damage to Chemical Vol Control Sys (CVCS) Holdup Tanks. Engineering Activities Have Been Curtailed to Point Where Detail Design Data Requested Is Unavailable ML19318B0361980-05-28028 May 1980 Responds to IE Bulletin 79-03A, Longitudinal Weld Defects in ASME SA-312 Type 304 Stainless Steel. All Westinghouse- Supplied Pipe for Use on NSSS Is Either of Forged Seamless or Centrifugal Cask Const ML18037A2561980-05-19019 May 1980 Forwards Annual Financial Repts,1979 for Central Hudson Gas & Electric Corp,Long Island Lighting Co,Ny State Electric & Gas Corp & Rochester Gas & Electric ML19309E4301980-03-19019 March 1980 Responds to IE Bulletin 80-03.Charcoal Adsorber Cells Have Not Been Purchased ML19309D0781980-02-26026 February 1980 Comments on Proposed Rule 10CFR50 on Behalf of Suffolk County,Ny:Emergency Planning Must Be Viewed as Equivalent Rather than Secondary to Siting Design in Achieving Public Protection ML19296D6701980-02-0707 February 1980 Responds to IE Bulletin 79-28, Possible Malfunction of Namco Model EA180 Limit Switches at Elevated Temps. No Switches Purchased Yet.If Purchased,Suitable Controls Will Be Instituted ML19322D7141980-02-0101 February 1980 Advises of Ny State Board on Electric Generation Siting & Environ 800129 Denial of Lilco Application for Const of Facility at Jamesport,Ny ML19320C8011980-01-23023 January 1980 Requests That NRC Amend Proposed Regulation Re Formulation of Evacuation Plan to Include All Territory East of Facility.Proposed 10-mile Radius Is Unworkable for People of Long Island.Responsible Plan Should Be Developed ML19305B4501980-01-23023 January 1980 Comments on Proposed Rule 10CFR50:commends NRC for Taking Action Re Evacuation Plan as Need for Comprehensive & Uniform Policy Is Long overdue.Ten-mile Radius Would Be Unworkable in New York City & Should Be Reconsidered ML19290D0331980-01-11011 January 1980 Responds to IE Bulletin 79-02,Revision 2.Expansion Anchor Bolts Will Not Be Used in Concrete Block Walls to Attach Piping Support of Seismic Category I Sys.Steel Members Will Not Be Attached Directly to Concrete Walls ML19284A8091980-01-0707 January 1980 Responds to IE Bulletin 79-25, Failure of Westinghouse Bfd Relays in Safety-Related Sys. No Westinghouse Relays Used or Planned for Use in safety-related Sys ML19260E1341979-12-14014 December 1979 FOIA Request for Documents Re Jamesport Nuclear Power Station,Units 1 & 2 ML19254F2641979-11-0202 November 1979 Discusses Brookhaven Draft Rept on Response Combination. Mark II Owners Group Suggests Criteria Should Include Provisions for Application to Load & Response Levels ML19256F1591979-10-29029 October 1979 Responds to IE Bulletin 79-23.Purchase Order for Emergency Diesel Generators Has Not Been Placed.Will Ensure Compliance by Testing Generator During Preoperational Test Program ML19250C3951979-10-29029 October 1979 Responds to IE Bulletin 79-14, Seismic Analyses for As-Built Safety-Related Piping Sys. Safety-related Sys Not Seismically Analyzed Because of Const to Start in 1982.Insp Will Be Done According to Util QA Program ML19276G9001979-08-18018 August 1979 Informs That No Security Training & Qualification Program Is Presently Being Developed.Due to Current Project Schedule, Program Would Be Premature ML19274G1351979-07-20020 July 1979 Responds to IE Bulletin 79-11.Purchase Orders for Circuit Breakers in safety-related Sys Not Placed. Particular Circuit Breakers to Be Used Are Unknown ML19242B2601979-07-0606 July 1979 Submits Response to IE Bulletin 79-02,Revision 1,re Plant Design.Info Pertains to Project Design Procedure & Spec for drilled-in Anchors,Cyclic Loadings & Pipe Support Base Plate Configurations ML19247A2961979-06-12012 June 1979 Responds to IE Bulletin 79-09.Purchase Orders for Circuit Breakers in safety-related Sys Have Not Been Placed.If GE Type AK-2 Circuit Breakers Are Used,Preventive Maint Program Will Be Conducted ML19269E9111979-05-30030 May 1979 Responds to IE Bulletin 79-07.No Seismic Stress Analyses of safety-related Piping Have Been Performed.Intends to Use Nupipe Computer Program for Piping Analysis ML19224D4281979-05-28028 May 1979 Forwards Suffolk County,Ny Legislature Opposing Facility Const ML19276G6421979-05-28028 May 1979 Forwards Resolution 474,adopted by County Legislature of Suffolk County,Ny in Opposition to Plant Const ML19242B4151979-05-25025 May 1979 Responds to IE Bulletin 79-04.No Purchase Orders Issued for Swing Check Valves.Qa Program Vendors W/Acceptable Method for Determining & Verifying Correct Valve Weights Will Be Selected ML19269E9001979-05-11011 May 1979 Responds to IE Bulletin 79-03.Station Design Reviewed & Welded Pipe Is Not Used in Westinghouse NSSS ML19246C0611979-05-10010 May 1979 Notifies That Suffolk County,Ny Legislature Passed Resolution Opposing CP Sought by Util ML19289E7851979-04-13013 April 1979 Requests Inclusion of Ny Dept of Public Svc on Svc List for Ny Siting Proceeding ML19274E6201979-03-0909 March 1979 Forwards Updated 1978 & 1979 Peak Load Forecasts of Long Island Lighting Co & Ny State Electric & Gas Corp.Also Compares Applicants' 1979 Forecasts to Total Controlled Sources & Required Capability for 1988-1992 ML19296A4551979-02-14014 February 1979 Ack Receipt of 790208 Ltr Advising of Classified Document Re Issue of Sabotage of Spent Nuclear Fuel at Facility.Requests Aid in Bringing Draft Document to Attention of Local Law Enforcement Officials ML19269C9981979-01-26026 January 1979 Advises of 790122 Prehearing Conference & Sets Schedule for Upcoming Evidentiary Hearings on Reopened Issues.Siting Board'S Order Directing Remand Requires Decision by Sept 1979 ML19274D3561979-01-19019 January 1979 Forwards Final Rept on Archaeological Salvage Excavation at Hallock'S Pond Site,Nov 1978.Encl Available in Central Files ML19270F5861979-01-12012 January 1979 Ack Receipt of ASLB Initial Decision.Requests Detailed Studies Used as Basis for Decision on once-through Cooling Sys ML19259A7081979-01-0505 January 1979 in Response to NRC 781206 Ltr,Util States They Have Been Complete & Accurate in Submittals & Prompt in Correcting Errors.If NRC Disagrees,Examples Should Be Cited ML19259A6001979-01-0202 January 1979 Requests Issuance of Const License Pursuant to Initial Decision of ASLB Dtd 781226.Forwards Payment of Licensee Fee Under Protest & Payment Shall Not Be Deemed Waiver of Applicant'S Rights to Seek Refund ML19282C3131978-12-27027 December 1978 Forwards 781222 Order Directing Remand,Reopening Jamesport Record on Issues of Need,Comparative Economics & Alternatives.W/O Encl ML19305A0801978-12-0707 December 1978 Advises That Ny State Board on Electric Generation Siting & the Environ Reopened Hearing Record on 781121.Board's Decision Will Be Forwarded to Aslab ML19256A2851978-11-17017 November 1978 Responds to 781107 NRC Request for New Lic Appl Plans.Has No New Lic Appl Plans Between Now & 811231 ML20062F1311978-11-16016 November 1978 Forwards Amer Meteorological Society Position Paper on Accuracy of Dispersion Models W/Detailed Comments on Deficiencies of NRC Analyses of Site Meteorology ML20148K8561978-10-27027 October 1978 Forwards Standard Size Copies of Display Charts Presented by County at 781019 Oral Argument W/Explanatory Notes.Believes Hearing Bd Has Deprived Itself of Chance to Consider Alternatives,Thus Invalidating Basis for Approval of Appl ML20148B7771978-10-0606 October 1978 Forwards Comments by Commissioner J Larocca During 780727 News Conference Re State of Ny Energy Policy 1991-08-30 Category:UTILITY TO NRC MONTHYEARML20003H2821981-04-30030 April 1981
[Table view]Forwards Resolutions of SER Issues 10,11,12,40,41,42,49 & 56.Also Forwards Annual Financial Repts 1979 & 1980 ML19338F4861980-10-10010 October 1980 Notifies That Future NRC Correspondence Re Facilities Should Be Addressed to Cj Davis ML19338E5731980-09-30030 September 1980 Informs That Correspondence for Nuclear Responsibilities Should Be Addressed to Ms Pollock ML19338F6191980-09-16016 September 1980 Responds to IE Bulletin 80-20, Failure of Westinghouse Type W-2 Spring Return to Neutral Control Switches. Westinghouse Has Not Fabricated Any Control Cabinets for safety-related Equipment Using Specified Switches ML19351D6041980-09-10010 September 1980 Comments on Proposed Rules 10CFR50 & 51 Re Statement of Interim Policy on Nuclear Power Plant Accident Considerations Under Nepa.Supports Commission Approach as Interim Guidance ML19338E6701980-08-20020 August 1980 Responds to IE Bulletin 80-16.Plant Design Does Not Include Rosemount Model 1151 & 1152 Pressure Transmitters ML19330C3081980-08-0101 August 1980 Responds to D Eisenhut 800702 Ltr Re Estimates of Evacuation Time for Site.Info Will Be Developed Upon Receipt of Ny State Board on Electric Generation Siting & Environ Certification ML19320D5541980-07-0101 July 1980 Responds to IE Bulletin 80-08 Re Containment Liner Penetration Weld Examinations.Penetrations Will Be Fabricated Per Reg Guide 1.19.Butt Welds Will Be Radiographed ML19318C1271980-06-0505 June 1980 Responds to IE Bulletin 80-05, Vacuum Condition Resulting in Damage to Chemical Vol Control Sys (CVCS) Holdup Tanks. Engineering Activities Have Been Curtailed to Point Where Detail Design Data Requested Is Unavailable ML19309E4301980-03-19019 March 1980 Responds to IE Bulletin 80-03.Charcoal Adsorber Cells Have Not Been Purchased ML19296D6701980-02-0707 February 1980 Responds to IE Bulletin 79-28, Possible Malfunction of Namco Model EA180 Limit Switches at Elevated Temps. No Switches Purchased Yet.If Purchased,Suitable Controls Will Be Instituted ML19290D0331980-01-11011 January 1980 Responds to IE Bulletin 79-02,Revision 2.Expansion Anchor Bolts Will Not Be Used in Concrete Block Walls to Attach Piping Support of Seismic Category I Sys.Steel Members Will Not Be Attached Directly to Concrete Walls ML19284A8091980-01-0707 January 1980 Responds to IE Bulletin 79-25, Failure of Westinghouse Bfd Relays in Safety-Related Sys. No Westinghouse Relays Used or Planned for Use in safety-related Sys ML19254F2641979-11-0202 November 1979 Discusses Brookhaven Draft Rept on Response Combination. Mark II Owners Group Suggests Criteria Should Include Provisions for Application to Load & Response Levels ML19250C3951979-10-29029 October 1979 Responds to IE Bulletin 79-14, Seismic Analyses for As-Built Safety-Related Piping Sys. Safety-related Sys Not Seismically Analyzed Because of Const to Start in 1982.Insp Will Be Done According to Util QA Program ML19256F1591979-10-29029 October 1979 Responds to IE Bulletin 79-23.Purchase Order for Emergency Diesel Generators Has Not Been Placed.Will Ensure Compliance by Testing Generator During Preoperational Test Program ML19276G9001979-08-18018 August 1979 Informs That No Security Training & Qualification Program Is Presently Being Developed.Due to Current Project Schedule, Program Would Be Premature ML19274G1351979-07-20020 July 1979 Responds to IE Bulletin 79-11.Purchase Orders for Circuit Breakers in safety-related Sys Not Placed. Particular Circuit Breakers to Be Used Are Unknown ML19242B2601979-07-0606 July 1979 Submits Response to IE Bulletin 79-02,Revision 1,re Plant Design.Info Pertains to Project Design Procedure & Spec for drilled-in Anchors,Cyclic Loadings & Pipe Support Base Plate Configurations ML19247A2961979-06-12012 June 1979 Responds to IE Bulletin 79-09.Purchase Orders for Circuit Breakers in safety-related Sys Have Not Been Placed.If GE Type AK-2 Circuit Breakers Are Used,Preventive Maint Program Will Be Conducted ML19269E9111979-05-30030 May 1979 Responds to IE Bulletin 79-07.No Seismic Stress Analyses of safety-related Piping Have Been Performed.Intends to Use Nupipe Computer Program for Piping Analysis ML19242B4151979-05-25025 May 1979 Responds to IE Bulletin 79-04.No Purchase Orders Issued for Swing Check Valves.Qa Program Vendors W/Acceptable Method for Determining & Verifying Correct Valve Weights Will Be Selected ML19269E9001979-05-11011 May 1979 Responds to IE Bulletin 79-03.Station Design Reviewed & Welded Pipe Is Not Used in Westinghouse NSSS ML19274D3561979-01-19019 January 1979 Forwards Final Rept on Archaeological Salvage Excavation at Hallock'S Pond Site,Nov 1978.Encl Available in Central Files ML19259A7081979-01-0505 January 1979 in Response to NRC 781206 Ltr,Util States They Have Been Complete & Accurate in Submittals & Prompt in Correcting Errors.If NRC Disagrees,Examples Should Be Cited ML19259A6001979-01-0202 January 1979 Requests Issuance of Const License Pursuant to Initial Decision of ASLB Dtd 781226.Forwards Payment of Licensee Fee Under Protest & Payment Shall Not Be Deemed Waiver of Applicant'S Rights to Seek Refund ML19256A2851978-11-17017 November 1978 Responds to 781107 NRC Request for New Lic Appl Plans.Has No New Lic Appl Plans Between Now & 811231 1981-04-30 |
Text
- --
a
/Eg'O LONG ISLAND LIGHTING COM PANY
.awaunaw 175 EAST OLO COUNTRY ROAD H tCKSVI LLE. NEW YORK 11801 October 29, 1979 JNRC-240 Mr. Boyce Grier, Director Office of Inspection & Enforcement, Region 1 U.S. Nuclear Regulatory Commission 631 Park Avenue King of Prussia, PA 19406 Jamesport Nuclear Power Station - Units 1 & 2 Inspection & Enforcement Bulletin No. 79-23 Docket Nos. 50-516 50-517
Dear Mr. Grier:
In reply to Inspection & Enforcement (IE) Bulletin No. 79-23, Potential Failure of Emergency Diesel Generator Field Exciter Transformer, we have reviewed the Jamesport Nuclear Power Station (JNPS) design and submit the following response.
The Purchase Order for the JNPS Emergency Diesel Generators has not been placed. Accordingly, the Emergency Diesel Generator vendor is not known at this time.
Nevertheless, prior to issuing a Purchase Order, we will ensure that the concern raised in Action Item 1 of IE Bulletin No. 79-23 has been investigated and adequate corrective action, if required, is implemented. In addition, the installed unit will be tested during the plant pre-operational test program in sccordance with Action Item 2 of this IE Bulletin.
Should you require further information, please do not hesitate to contact us.
Very truly yours, c fY o
R.'E. Plaskon Assistant Project Manager Jamesport Nuclear Power Station LG/dm cc: Mr. Victor Stello, Director Office of Inspection & Enforcement U.S. Nuclear Regulatory Commission Washington, D.C. 20545 } }/8 .)35 7911210 k