Comments on Proposed Rules 10CFR50 & 51 Re Statement of Interim Policy on Nuclear Power Plant Accident Considerations Under Nepa.Supports Commission Approach as Interim Guidance
ML19351D604
Person / Time
Site: 05000514, 05000516
Issue date: 09/10/1980
From: Lentsch J
PORTLAND GENERAL ELECTRIC CO.
To:
NRC OFFICE OF THE SECRETARY (SECY)
References
FRN-45FR40101, RULE-PR-50, RULE-PR-51 45FR40101-16, NUDOCS 8010140021
Download: ML19351D604 (1)


Text

_ _ _ -

M i huu22R

[0, $"l 3

$ltL%KD flULL fVf*fh2Ljfggf 3

gh

~

i

.j Portland General Electric Company p

g S

Sgp t sq

"#^%

A

[

ce j

September 10, 1980 9

C

_ P./-

Federal Register Comments _

JWL-385-80 Secretary of the Commission ATIN:

Docketing and Service Branch U. S. Nuclear Regulatory Commission Washington, D. C.

20555

Dear Sir:

Portland General Electric Company, Construction Permit applicant for the proposed Pebble Springs Nuclear Plant, offers the following comments related to the Statement of Interim Policy regarding nuclear power plant accident considerations under the National Environmental Policy Act of 1969, as promulgated in the June 13, 1980 Federal Register (Volume 45, 40101).

We generally support the approach taken by the Commission as interim guidance for the treatment of accident risk considerations in NEPA reviews.

In the longer term, however, we would expect that compliance l

with requirements flowing from rulemakings for emergency planning, siting and degraded core cooling would constitute an acceptable basis for eliminating, as an interim requirement, the need to include the kind of probablistic assessments envisioned by this policy statement in Environmental Impact Statements and Environmental Reports.

Sincerely,

l J. W. Lentsch Manager of Generation Licensing & Analysis Generation Engineering-Construction Division JWL/DRS/41m8B15

/

c:

Mr. Lynn Frank, Director

/v.xnowledged by card ~.["/5..$.h.'.."

State of Oregon Department of Energy b

80101400.2/

r"

+9m a-ou