ML19320D554

From kanterella
Jump to navigation Jump to search
Responds to IE Bulletin 80-08 Re Containment Liner Penetration Weld Examinations.Penetrations Will Be Fabricated Per Reg Guide 1.19.Butt Welds Will Be Radiographed
ML19320D554
Person / Time
Site: 05000516, 05000517
Issue date: 07/01/1980
From: Plaskon R
LONG ISLAND LIGHTING CO.
To: Grier B
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
References
IEB-80-08, IEB-80-8, JNRC-252, NUDOCS 8007210515
Download: ML19320D554 (2)


Text

,. p

  • e m mrma* m a may

?

1

! /E4"O , LONG ISLAND LIGHTING COM PANY

'""==~

i 2m, y, a, 17 5 EAST OLD COUNTRY ROAD

  • H IC K SVI LLE, NEW YORK 19801 Dkect Dul Number July 1, 1980 JNRC-252 Mr. Boyce Grier, Director Office of Inspection and Enforcement, Region 1 U.S. Nuclear Regulatory Commission 631 Park Avenue q

King of Prussia, PA 19406 Jamesport Nuclear Power Station - Units 1 & 2 Inspection and Enforcement Bulletin No. 80-08 Docket Nos. 50-516 50-517

Dear Mr. Grier:

This letter is in response to Inspection and Enforcement Bulletin No. 80-08, " Examination of Containment Liner Penetration Welds".

We have reviewed the Jamesport Nuclear Power Station design and l have the following information:  !

l

1. The Jamesport units contain the flued head design for penetrations as illustrated in #igure NEll20-1, Winter 1975 Addenda to the 1974 ASME Boiler and Pressure Vessel i Code. l
2. a. The penetrations will be fabricated to ASME Section III, 1971 edition including adder.da through Sumn.er '

1973, and in accordance with Regulatory Guide 1.19. j

b. The butt welds will be radiographed if possible.

However, if the welds cannot be radiographed in a meaningful manner, ultrasonic examination will be performed as permitted in Section NE5231.1 of the Summer 1972 Addenda.  !

c. The joints are butt welded using backing bars. The 1

I 8 u 0 7 210 f(

s .; ,

Mr. B. Grier July 1, 1980 Page 2 type of material and size of piping is as follows:

Pipe Penetration Sleeve Size Material Below 28" O.D. SA-516 Grade 60 or SA-333 Grade 6 28", 35", and 48" O.D. SA-537 Grade B Forgings for Piping Penetrations Material Carbon Steel SA-508 Class 1 Stainless Steel SA-182 Type 304 or 316

d. The plant is not in construction, therefore, no physical examinations have been performed.
3. We will perform rediographic examination if possible of these welds and the schedule of performance will be determined at a later date and submitted at the appropriate time.

Very truly yours,

. EE A JI4A ,

R. E. Plaskon Assistant Project Manager Jamesport Nuclear Power Station JPC/dm cc: Director Office of Inspection and Enforcement Division of Reactor Construction Inspection U.S. Nuclear-Regulatory Commission Washington, D.C. 20553 f

L