Interim Deficiency Rept Re Defective Westinghouse Switches in Distribution Cabinets Used to Distribute Power for Plant Instrumentation & Control.Review Being Conducted.Final Rept Will Be Submitted by 800507
ML19257B290
Person / Time
Site: Fermi DTE Energy icon.png
Issue date: 01/07/1980
From: Fahrner W
DETROIT EDISON CO.
To: James Keppler
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
References
EF2-47-352, NUDOCS 8001150503
Download: ML19257B290 (1)


Text

160)

Detroit 2000 Seconc Averve cetro4t. M cNgan 48226 (313) 237 8000 January 7, 1980 EF2-47,352 Mr. James G. Keppler Rc;;ional Director U.S. Nuclear Regulatory Commission Region III g _ 34. l 799 Roosevelt Road Glen Ellyn, Illinois 60137

Dear Mr. Keppler:

Subject:

Interim Report of 10 CFR 50.55(e)

Item on Defective Westinghouse Switches Oa December 7, 1979, Detroit Edison's Mr. H. A. Walker, EF2 Site Project Quality Assurance Engineer, telephoned Mr. F. J. Jablonski of NRC Region III to report on defective Westinghouse switches in distribution cabinets used to distribute power for plant instru-mentation and control at the Fermi 2 Site.

These switches were manufactured by Westinghouse Electric Corporation and furnished to Detroit Edison by the Harlo Corporation.

So far, the problem involves five switches which will not close properly. Four distribution cabinets are affected.

Detroit Edison is conducting a review to determine the extent of this problem, and arrangements are being made to meet with the supplier's representative to correct the situation. A final report will be submitted to you by May 7, 1980.

If you have any questions on this matter, please contact our EF2 Site Project Quality Assurance Engineer.

Sincerely,

[I ~ i/ _

W. J. Fahrner Project Manager Enrico Fermi 2 cc: Mr. John G. Davis Acting Director Office of Inspection and Enforcement Division of Reactor Inspection Programs 40 19 h/ l 0

U.S. Nuclear Regulatory Commission Washington D.C. 20555 h 3

. $ os@ fY T 1749 100 800115o 03