MONTHYEARLIC-99-0096, Monthly Operating Rept for Sept 1999 for Fcs,Unit 1.With1999-09-30030 September 1999 Monthly Operating Rept for Sept 1999 for Fcs,Unit 1.With LIC-99-0084, Monthly Operating Rept for Aug 1999 for Fort Calhoun Station.With1999-08-31031 August 1999 Monthly Operating Rept for Aug 1999 for Fort Calhoun Station.With ML20210R1961999-07-31031 July 1999 Monthly Operating Rept for July 1999 for Fcs,Unit 1 LIC-99-0065, Monthly Operating Rept for June 1999 for Fort Calhoun Station,Unit 1.With1999-06-30030 June 1999 Monthly Operating Rept for June 1999 for Fort Calhoun Station,Unit 1.With ML20210R2081999-06-30030 June 1999 Revised Monthly Operating Rept for June 1999 for Fcs,Unit 1 LIC-99-0053, Monthly Operating Rept for May 1999 for Fort Calhoun Station,Unit 11999-05-31031 May 1999 Monthly Operating Rept for May 1999 for Fort Calhoun Station,Unit 1 LIC-99-0047, Monthly Operating Rept for Apr 1999 for Fort Calhoun Station Unit 1.With1999-04-30030 April 1999 Monthly Operating Rept for Apr 1999 for Fort Calhoun Station Unit 1.With LIC-99-0034, Monthly Operating Rept for Mar 1999 for Fcs,Unit 1.With1999-03-31031 March 1999 Monthly Operating Rept for Mar 1999 for Fcs,Unit 1.With LIC-99-0025, Monthly Operating Rept for Feb 1999 for Fort Calhoun Station,Unit 1.With1999-02-28028 February 1999 Monthly Operating Rept for Feb 1999 for Fort Calhoun Station,Unit 1.With LIC-99-0003, Monthly Operating Rept for Dec 1998 for Fort Calhoun Station.With1998-12-31031 December 1998 Monthly Operating Rept for Dec 1998 for Fort Calhoun Station.With LIC-98-0172, Monthly Operating Rept for Nov 1998 for Fort Calhoun Station,Unit 1.With1998-11-30030 November 1998 Monthly Operating Rept for Nov 1998 for Fort Calhoun Station,Unit 1.With LIC-98-0154, Monthly Operating Rept for Oct 1998 for Fort Calhoun Station,Unit 1.With1998-10-31031 October 1998 Monthly Operating Rept for Oct 1998 for Fort Calhoun Station,Unit 1.With LIC-98-0136, Monthly Operating Rept for Sept 1998 for Fort Calhoun Station,Unit 1.With1998-09-30030 September 1998 Monthly Operating Rept for Sept 1998 for Fort Calhoun Station,Unit 1.With LIC-98-0122, Monthly Operating Rept for Aug 1998 for Fort Calhoun Station Unit 1.With1998-08-31031 August 1998 Monthly Operating Rept for Aug 1998 for Fort Calhoun Station Unit 1.With LIC-98-0105, Monthly Operating Rept for July 1998 for Fort Calhoun Station1998-07-31031 July 1998 Monthly Operating Rept for July 1998 for Fort Calhoun Station LIC-98-0092, Monthly Operating Rept for June 1998 for Fort Calhoun Station,Unit 11998-06-30030 June 1998 Monthly Operating Rept for June 1998 for Fort Calhoun Station,Unit 1 LIC-98-0078, Monthly Operating Rept for May 1998 for Fort Calhoun Station Unit 11998-05-31031 May 1998 Monthly Operating Rept for May 1998 for Fort Calhoun Station Unit 1 LIC-98-0070, Monthly Operating Rept for Apr 1998 for Ft Calhoun Station1998-04-30030 April 1998 Monthly Operating Rept for Apr 1998 for Ft Calhoun Station LIC-98-0058, Monthly Operating Rept for Mar 1998 for Fcs,Unit 11998-03-31031 March 1998 Monthly Operating Rept for Mar 1998 for Fcs,Unit 1 LIC-98-0035, Monthly Operating Rept for Feb 1998 for Fcs,Unit 11998-02-28028 February 1998 Monthly Operating Rept for Feb 1998 for Fcs,Unit 1 LIC-98-0016, Monthly Operating Rept for Jan 1998 for Fort Calhoun Station1998-01-31031 January 1998 Monthly Operating Rept for Jan 1998 for Fort Calhoun Station LIC-98-0002, Monthly Operating Rept for Dec 1997 for Fcs,Unit 11997-12-31031 December 1997 Monthly Operating Rept for Dec 1997 for Fcs,Unit 1 LIC-97-0191, Monthly Operating Rept for Nov 1997 for Fcs,Unit 11997-11-30030 November 1997 Monthly Operating Rept for Nov 1997 for Fcs,Unit 1 LIC-97-0179, Monthly Operating Rept for Oct 1997 for Fcs,Unit 11997-10-31031 October 1997 Monthly Operating Rept for Oct 1997 for Fcs,Unit 1 LIC-97-0163, Monthly Operating Rept for Sept 1997 for Fcs,Unit 11997-09-30030 September 1997 Monthly Operating Rept for Sept 1997 for Fcs,Unit 1 LIC-97-0149, Monthly Operating Rept for Aug 1997 for Fort Calhoun Station Unit 11997-08-31031 August 1997 Monthly Operating Rept for Aug 1997 for Fort Calhoun Station Unit 1 LIC-97-0137, Monthly Operating Rept for Jul 1997 for Fort Calhoun Station1997-07-31031 July 1997 Monthly Operating Rept for Jul 1997 for Fort Calhoun Station LIC-97-0115, Monthly Operating Rept for June 1997 for Fort Calhoun Station,Unit 11997-06-30030 June 1997 Monthly Operating Rept for June 1997 for Fort Calhoun Station,Unit 1 ML20148L9291997-05-31031 May 1997 Monthly Operating Rept for May 1997 for Fort Calhoun Station Unit 1 LIC-97-0081, Monthly Operating Rept for April 1997 for FCS1997-04-30030 April 1997 Monthly Operating Rept for April 1997 for FCS LIC-97-0054, Monthly Operating Rept for Mar 1997 for Fort Calhoun Station Unit 11997-03-31031 March 1997 Monthly Operating Rept for Mar 1997 for Fort Calhoun Station Unit 1 ML20136G5911997-02-28028 February 1997 Monthly Operating Rept for Feb 1997 for Fort Calhoun Station ML20134M4281997-01-31031 January 1997 Monthly Operating Rept for Jan 1997 for Fort Calhoun Station Unit 1 LIC-97-0002, Monthly Operating Rept for Dec 1996 for Fort Calhoun Station Unit 11996-12-31031 December 1996 Monthly Operating Rept for Dec 1996 for Fort Calhoun Station Unit 1 ML20134M4341996-12-31031 December 1996 Revised Monthly Operating Rept for Dec 1996 for Fort Calhoun Station Unit 1 LIC-96-0196, Monthly Operating Rept for Nov 1996 for Fort Calhoun Station Unit 11996-11-30030 November 1996 Monthly Operating Rept for Nov 1996 for Fort Calhoun Station Unit 1 LIC-96-0174, Monthly Operating Rept for Oct 1996 for FCS Unit 11996-10-31031 October 1996 Monthly Operating Rept for Oct 1996 for FCS Unit 1 LIC-96-0152, Monthly Operating Rept for Sept 1996 for Fort Calhoun Station Unit 11996-09-30030 September 1996 Monthly Operating Rept for Sept 1996 for Fort Calhoun Station Unit 1 LIC-96-0134, Monthly Operating Rept for Aug 1996 for Fort Calhoun Station1996-08-31031 August 1996 Monthly Operating Rept for Aug 1996 for Fort Calhoun Station LIC-96-0113, Monthly Operating Rept for Jul 1996 for Fort Calhoun Station Unit 11996-07-31031 July 1996 Monthly Operating Rept for Jul 1996 for Fort Calhoun Station Unit 1 LIC-96-0096, Monthly Operating Rept for June 1996 for Fort Calhoun Station Unit 11996-06-30030 June 1996 Monthly Operating Rept for June 1996 for Fort Calhoun Station Unit 1 LIC-96-0084, Monthly Operating Rept for May 1996 for Fort Calhoun Station Unit 11996-05-31031 May 1996 Monthly Operating Rept for May 1996 for Fort Calhoun Station Unit 1 ML20117G0821996-04-30030 April 1996 Monthly Operating Rept for April 1996 for FCS ML20117G0841996-03-31031 March 1996 Revised MOR for March 1996 for FCS LIC-96-0036, Monthly Operating Rept for Feb 1996 for Calhoun Station,Unit 11996-02-29029 February 1996 Monthly Operating Rept for Feb 1996 for Calhoun Station,Unit 1 LIC-96-0016, Monthly Operating Rept for Jan 1996 for Fort Calhoun Station Unit 11996-01-31031 January 1996 Monthly Operating Rept for Jan 1996 for Fort Calhoun Station Unit 1 LIC-96-0004, Monthly Operating Rept for Dec 1995 for Fort Calhoun Station1995-12-31031 December 1995 Monthly Operating Rept for Dec 1995 for Fort Calhoun Station LIC-95-0233, Monthly Operating Rept for Nov 1995 for FCS Unit 11995-11-30030 November 1995 Monthly Operating Rept for Nov 1995 for FCS Unit 1 ML20093G7571995-09-30030 September 1995 Monthly Operating Rept for Sept 1995 for Fort Calhoun Station Unit 1 LIC-95-0172, Monthly Operating Rept for Aug 1995 for Fort Calhoun Station1995-08-31031 August 1995 Monthly Operating Rept for Aug 1995 for Fort Calhoun Station 1999-09-30
[Table view] Category:TEXT-SAFETY REPORT
MONTHYEARML20217B5401999-10-0606 October 1999 Safety Evaluation Supporting Amend 193 to License DPR-40 ML20217A9931999-09-30030 September 1999 NRC Regulatory Assessment & Oversight Pilot Program, Performance Indicator Data LIC-99-0096, Monthly Operating Rept for Sept 1999 for Fcs,Unit 1.With1999-09-30030 September 1999 Monthly Operating Rept for Sept 1999 for Fcs,Unit 1.With ML20211J9321999-09-0202 September 1999 Safety Evaluation Concluding That Licensee Proposed Alternatives Provide Acceptable Level of Quality & Safety. Proposed Alternatives Authorized for Remainder of Third ten- Yr ISI Interval for Fort Calhoun Station,Unit 1 LIC-99-0084, Monthly Operating Rept for Aug 1999 for Fort Calhoun Station.With1999-08-31031 August 1999 Monthly Operating Rept for Aug 1999 for Fort Calhoun Station.With ML20216E6431999-08-26026 August 1999 Rev 19 to TDB-VI, COLR for FCS Unit 1 ML20210R1961999-07-31031 July 1999 Monthly Operating Rept for July 1999 for Fcs,Unit 1 ML20210G2181999-07-27027 July 1999 Safety Evaluation Supporting Amend 192 to License DPR-40 ML20210D9951999-07-22022 July 1999 Safety Evaluation Supporting Amend 191 to License DPR-40 ML20216E6361999-07-21021 July 1999 Rev 18 to TDB-VI, COLR for FCS Unit 1 ML20210R2081999-06-30030 June 1999 Revised Monthly Operating Rept for June 1999 for Fcs,Unit 1 LIC-99-0065, Monthly Operating Rept for June 1999 for Fort Calhoun Station,Unit 1.With1999-06-30030 June 1999 Monthly Operating Rept for June 1999 for Fort Calhoun Station,Unit 1.With ML20196H8621999-06-30030 June 1999 NRC Regulatory Assessment & Oversight Pilot Program, Performance Indicator Data, June 1999 Rept ML20210P5461999-06-0808 June 1999 Rev 0,Vols 1-5 of Fort Calhoun Station 1999 Emergency Preparedness Exercise Manual, to Be Conducted on 990810. Pages 2-20 & 2-40 in Vol 2 & Page 4-1 in Vol 4 of Incoming Submittal Not Included ML20195B4581999-05-31031 May 1999 Rev 3 to CE NPSD-683, Development of RCS Pressure & Temp Limits Rept for Removal of P-T Limits & LTOP Requirements from Ts ML20207H7401999-05-31031 May 1999 Performance Indicators Rept for May 1999 LIC-99-0053, Monthly Operating Rept for May 1999 for Fort Calhoun Station,Unit 11999-05-31031 May 1999 Monthly Operating Rept for May 1999 for Fort Calhoun Station,Unit 1 ML20195B4521999-05-17017 May 1999 Technical Data Book TDB-IX, RCS Pressure - Temp Limits Rept (Ptlr) ML20206L4241999-05-10010 May 1999 Safety Evaluation Supporting Corrective Actions to Ensure That Valves Are Capable of Performing Intended Safety Functions & OPPD Adequately Addressed Requested Actions Discussed in GL 95-07 ML20206M2601999-05-0606 May 1999 SER Concluding That Licensee IPEEE Complete Re Info Requested by Suppl 4 to GL 88-20 & IPEEE Results Reasonable Given FCS Design,Operation & History LIC-99-0047, Monthly Operating Rept for Apr 1999 for Fort Calhoun Station Unit 1.With1999-04-30030 April 1999 Monthly Operating Rept for Apr 1999 for Fort Calhoun Station Unit 1.With ML20195E8621999-04-30030 April 1999 Performance Indicators, for Apr 1999 ML20205Q5831999-04-15015 April 1999 Safety Evaluation Supporting Amend 190 to License DPR-40 ML20210J4331999-03-31031 March 1999 Changes,Tests, & Experiments Carried Out Without Prior Commission Approval for Period 981101-990331.With USAR Changes Other than Those Resulting from 10CFR50.59 ML20206G2641999-03-31031 March 1999 Performance Indicators Rept for Mar 1999 LIC-99-0034, Monthly Operating Rept for Mar 1999 for Fcs,Unit 1.With1999-03-31031 March 1999 Monthly Operating Rept for Mar 1999 for Fcs,Unit 1.With ML20205J8181999-02-28028 February 1999 Performance Indicators, for Feb 1999 LIC-99-0025, Monthly Operating Rept for Feb 1999 for Fort Calhoun Station,Unit 1.With1999-02-28028 February 1999 Monthly Operating Rept for Feb 1999 for Fort Calhoun Station,Unit 1.With ML20207F3291999-01-31031 January 1999 FCS Performance Indicators for Jan 1999 ML20203B0991998-12-31031 December 1998 Performance Indicators for Dec 1998 LIC-99-0026, 1998 Omaha Public Power District Annual Rept. with1998-12-31031 December 1998 1998 Omaha Public Power District Annual Rept. with LIC-99-0003, Monthly Operating Rept for Dec 1998 for Fort Calhoun Station.With1998-12-31031 December 1998 Monthly Operating Rept for Dec 1998 for Fort Calhoun Station.With ML20198S3771998-12-31031 December 1998 Safety Evaluation Supporting Amend 189 to License DPR-40 ML20198S4831998-12-31031 December 1998 Safety Evaluation Supporting Amend 188 to License DPR-40 ML20196G2251998-12-18018 December 1998 Rev 2 to EA-FC-90-082, Potential Over-Pressurization of Containment Penetration Piping Following Main Steam Line Break in Containment ML20198M3141998-11-30030 November 1998 Performance Indicators Rept for Nov 1998 LIC-98-0172, Monthly Operating Rept for Nov 1998 for Fort Calhoun Station,Unit 1.With1998-11-30030 November 1998 Monthly Operating Rept for Nov 1998 for Fort Calhoun Station,Unit 1.With LIC-98-0160, Special Rept:On 981113,MSL RM RM-064 Was Declared Inoperable Due to Leakage Past Isolation Valve HCV-922.Troubleshooting Has Indicated That Leakage Has Stopped & Cause of Leak Continues to Be Investigated1998-11-25025 November 1998 Special Rept:On 981113,MSL RM RM-064 Was Declared Inoperable Due to Leakage Past Isolation Valve HCV-922.Troubleshooting Has Indicated That Leakage Has Stopped & Cause of Leak Continues to Be Investigated ML20203B0721998-11-16016 November 1998 Rev 6 to HI-92828, Licensing Rept for Spent Fuel Storage Capacity Expansion ML20196E4981998-10-31031 October 1998 Performance Indicators Rept for Oct 1998 ML20196G2441998-10-31031 October 1998 Changes,Tests & Experiments Carried Out Without Prior Commission Approval. with USAR Changes Other than Those Resulting from 10CFR50.59 LIC-98-0154, Monthly Operating Rept for Oct 1998 for Fort Calhoun Station,Unit 1.With1998-10-31031 October 1998 Monthly Operating Rept for Oct 1998 for Fort Calhoun Station,Unit 1.With ML20154M4881998-10-19019 October 1998 Safety Evaluation Supporting Amend 186 to License DPR-40 ML20154N2411998-10-19019 October 1998 Safety Evaluation Supporting Amend 187 to License DPR-40 LIC-98-0136, Monthly Operating Rept for Sept 1998 for Fort Calhoun Station,Unit 1.With1998-09-30030 September 1998 Monthly Operating Rept for Sept 1998 for Fort Calhoun Station,Unit 1.With ML20155G4261998-09-30030 September 1998 Performance Indicators for Sept 1998 ML20154A1251998-08-31031 August 1998 Performance Indicators, Rept for Aug 1998 LIC-98-0122, Monthly Operating Rept for Aug 1998 for Fort Calhoun Station Unit 1.With1998-08-31031 August 1998 Monthly Operating Rept for Aug 1998 for Fort Calhoun Station Unit 1.With ML20238F7231998-08-17017 August 1998 Owner'S Rept for Isis ML18066A2771998-08-13013 August 1998 Part 21 Rept Re Deficiency in CE Current Screening Methodology for Determining Limiting Fuel Assembly for Detailed PWR thermal-hydraulic Sa.Evaluations Were Performed for Affected Plants to Determine Effect of Deficiency 1999-09-30
[Table view] |
Text
,
AVERAGE DAILY UNIT POWER LEVEL DOCKET NO. 50-285 UNIT Fort Calhoun #1 DATE January 10, 1980 COMPLETED BY B. J. Hickle TELEPIIONE h02-536 kh13 MONT11 December, 1979 DAY AVERAGE DAILY POWER LEVEL DAY AEERAGE DAILY POWER LEVEL (MWe Net) (MWe-Net)
I hhl.h 17 0.0 2 hh5.4 18 0.0 3 hhh.4 19 0.0 4 hhh 9 20 0.0 5 hhh.8 21 153.1 6 hhh 1 22 396.2 7 hhh 5 23 418 7 8 hh1.2 24 h10.0 9 hh3.7 25 h20.1 to hh3.5 26 425.9 Ig h44.8 27 h36.3-12 hhh.9 28 hhl.5 hhh.3 29 hhh.6
{3 34 hh3.4 30 ,
4h2.2 15 hh2.9 3 hhl.2 16 130 0 INSTRUCTIONS On this format. list the average daily unit power levelin MWe Net for each day in the reporting month. Compute in the nearest whole megawatt.
1770 330 8001180 3 5 7
OPERATING DATA REPORT DOCKET NO. 50-285 DATE January 10, 1980 C05tPLETED BY B. J. Hickle TELEPil0NE 402-536-4413 OPERATING STATUS Fort Calhoun Station Unit No. 1 N tes
- 1. Uni Name:
- 2. Reporting Period: December 1079
- 3. Licenwd Thermal Power (51Wt): 1420
- 4. Nameplate Rating (Gross 51We): 502 ,
S. Design Electrical Rating (Net SlWe): N57
- 6. Stasimum Dependable Capacity (Gross 51We): NO1
- 7. 51asimum Dependable Capacity (Net SlWe): SI
- 8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report. Give Reasons:
n/A
- 9. Power Lesel To Which Restricted. If Any (Net 51We): N/A
- 10. Reasons For Restrictions.lf Any: N/A This 51onth Yr.-to-Date Cumulative
- 11. Ilours in Reporting Period 744.0 8,760.0 54,937.0
- 12. Number Of flours Reactor Was Critical 633.8 8,436.6 44,401.6
- 13. Reactor Reserve Shutdown flours 0.0 173.5 1,309.5
- 14. Ilours Generator On-Line 628.3 8,385.0 43,451.1
- 15. Unit Resene Shutdown flours 0.0 0.O ~0.0
- 16. Gross Thermal Energy Generated (31Wil) 856,079.1 11,586,606.0 53,235,029 3 .
- 17. Gross Electrical Energy Generated (StWil) 283,702.0 3,855,967.9 17,660,229.6 18: Net Electrical Energy Generated (51Wil) 269,575.0 3,666,114.1 16,687,519.e
- 19. Unit Senice Factor ON N 95 7 79 1
- 20. Unit Availability Factor OO N 95 7 79 1
- 21. Unit Capacity Factor (Using 51DC Net) 79 3 91.6 67.0
- 22. Unit Capacity Factor (Using DER Net) 79.3 91.6 66.5
- 23. Unit Forced Outage Rate 15.6 2.3 4.5
- 24. Shutdowns Scheduled Oser Nest 6 31onths (Type. Date,and Duration of Each):
Refueling Outage, January 18, 8 Week Duration
- 25. If Shut Down At End Of Report Period. Estimated Date of Startup: N/A
- 26. Units in Test Status (Prior to Commercial Operation): Forecast Achiesed INITIA L CRITICALITY INIIIA L ELECTRICITY C01151ERCIA L OPER All0N 1770 331 (9/77 ) ,
UNITSHUTDOWNS AND POWER REDUCTIONS DOCKETNO.50-28s UNIT NAME Fort Calhoun #1 DATE January 10, 1960 COMPLETED BY B. J. llickle REPORT MONTil Deca"ba" 1979 TELEPilONE 402-530-4413
- E E No. Date g
.$ ? 3i; $23
,g g 5 Licensee Eg [*. Cause & Corrective 3g Event g? n.3 Action tu
$5 5 Ji gjj =!
e Report a mO O
!U Prevent Recurren.c 6
79-06 791216 F 115.7 A 1 N/A Reactor shutdown to conduct RC'P seal replacement.
I 2 3 4
- F: Forced Reason: Method: Exhibit G-Instructions y S: Scheduled A Equipment Failure (Explain) 1 Manual for Preparation of Data y B-Maintenance of Test ,
2-Manual Scram. Entry Sheets for Licensee C-Refueling 3 Automatic Scram. Event Report (LER) File (NUREG.
o D-Regulatory Restriction 4-Other (Explain) 01611 E-Operator Training & License Examination F-Administrative 5 U G-Operational Error (Explain) Exhibit I - Same Source N - (9/77) 11-Ot her ( E xplain)
Refueling Information Fort Calhoun - Unit No.1 .
Pcport for the month ending December 31, 19,7_9 Scheduled date for next refueling shutdown. . January 18, 1980 1.
Scheduled date for restart following refueling. March 15, 1980 2.
- 3. Will refueling or resumption of operation thereaf ter require a technical specificaticn change or other Yes license arrendment?
- a. If answer is yes, what, in general, will these be? .
Stretching power to 1500 MWth is planned in conjunction with the change in fuel supplier to Exxon.
- b. If answer is no, has the reload fuel design and core configuration been revievied by your Plant Safety Review Comnittee to deter-mine whether any unreviewed safety questions are associated with the core reload,
- c. If no such review has taken place, when is it scheduled?
Stretch Power Application
- 4. Scheduled date(s) for subntitting proposed licensing -Site Related Information, action and support information. Julv. 1979 - Submitted
-Core Related Analysis
- 5. Important licensing considerations associated with and Tech. Spec. Changes, refueling, e.g. , new or different fuel design or November, 1979 - Submitted supplier, unreviewed design or performance analysis nothods, significant changes in fuel design, new
- operating procedures.
First use of Exxon fuel in Fort Calhoun.
Stretching power from 1420 MWth to 1500 MWth.- 1770 bb
- 6. The nirrber of fuel assenblies: a) in the core 133 assemblies b) in the spent fuel pool 157 c) spent fuel pool "
storage capacity 483 d) planned spent fuel pool "
storage capacity 483
- 7. The projected date of the last refueling that can be discharged to the spent fuel pool assuning the present licensed capacity. 1985 Prepared by Date January 2, 1980 y
OMAHA PU3LIC POWER DISTRICT Fort Calhc un Station Unit To.1 December 1979 Monthly Operations Report I. OPERATIO:IS SU:&ARY The plant operation continued at approximately 100", power during December with the exception of a short outage to replace reactor coolant pump seals .
The requirements of iUREG-0578 vere implemented on December 3,1979, as required.
All operations were normal during December.
A. PERFORMA' ICE CHARACTERISTICS LER Tumber De fic ie ncy Hone
- 3. CHAITGES IIT OPERATI:!G FETHODS None C. RESULTS OF SURVIILIA: ICE TESTS A:iD INSPECTIO:IS Surveillance tests as required by the Technical Specifications Section 3.0 and Appendix 3, were performed in accordance with the annual surveillance test schedule. The following is a su--nry of the surveillance tests which results in Operations Incidents and are not reported elsewhere in the report:
Operations Incident De fic ie ncy OI-881 ST-ENV-2 Thermal "'"~a easurements not co=pleted.
OI-882 ST-ESF-6 Diesel Generator DG-1 fail to start on primary air.
D. CHANGES, TESTS A'ID EXPERISENTS CARRIED OUI WITHOUT COMMISSIO:'
APPROVAL De sc ription
-Prece dure 1770 334 EEAR 79-23 CQE Storage areas - completed as designed.
M.C. 10388 Install clothes dryer and provide h80V power in laundry - completed per design.
Monthly Operations Report December 1979 Page Two D. CHANGES, TESTS A'ID EXPERI E::TS CARRIED OUT '4ITHOUT CO MSSION APPROVAL (Continued)
Procedure Dasc ription M.O. 17251 Installation of Variators on HCV-2877A/B, HCV-2878A/B and HCV-2879A/B completed as designed.
SP-RPS-5 11 79 - Excore Detector Sy=etric Offset Recalibration - all channels within tolerance ,
no calibration necessary.
SP-RPS-5 12-26 Excore Detector Sy=etric Offset Recalibration - all channels within tolerance, no recalibration necessary.
SP-CONT-2 Containment Purge Supply and Exhaust Penetration Type C Leak Rate Test - test results acceptable.
E. RESULTS OF LEAK RATE TESTS SP-CO:iT-2 completed on containment purge valves:
Results acceptable.
F. CHANGES I i PLA:IT OPEP.ATING STAFF
- Tone G. TRAINI:TO Training for December consisted of Radiation Protection refresher for 1979 for all blue and red badge holders, fuel receipt, refuel-ing procedures and radiation protection classes for new contract people needed for refueling.
H. CHANGES, TESTS AND EXPERIE:ITS REQUIRING NUCLEAR REGULATORY C0!O!ISSION AUTHORIZATION PURSUANT TO 10CFR50.59 None 1770 335
/ ') .
7
/
/,/ s ., ,/-
Approved By c M m / lb
? .'.adager-Fort Calhoun Station
Menthly Cperations Reper:
Dece=ber 1979 page Three II. MAIUTEUA'!!E (Significant Safety Related) 1 M. O. < l Cate i Cescrirtion I Correc tiv ? A::icn i
2837 11-21-79 Pipe support ACH-195 needs to be Per approved procedure i strengthened as per I.E. Bulletin l 1 79-1h. !
i 2879 11-27-79 Fabricate SIS-52A per I.E. Bulletin Per approved procedure l , 79-1h.
I I I 2836 11-21-79! Support ACH-19h needs to be Per approved procedure strengthened per I.E. Bulletin 79-14 ,
2796 11-20-79 Strengthened pipe support ACS-199 Per approved procedure per I.E. Bulletin 79-1h .
2794 11 79 ACS-208 requires additional support Per approved procedure per I.E. Bulletin 79-lh.
2686 11-10-79 Field inspection performed per Per approved procedure I.E. Bulletin 79-lh found non-con-fo rmance . Later ar.alysis reccc-mended retro-fit to precludes over-
. tressing of support.
2877 11-29-79 Fabricate new support '4LH-8a per Per approved procedure reccc=endation of I.E. Bulletin 79-lh.
2h37 11 79 SIS-32 Ancher Bolts / Shells found Installed bolts per procedure installed incorrectly per I.E.
Bulletin 79-02.
2h65 11-1-79 SIS-27A Anchor Bolts / Shells found Installed boltsper procedure installed incorrectly per I.E.
Bulletin 79-02.
28hh 11-27-79 ACH-236 needs modification per Completed per procedure I.E. Bulletin 79-14, 28h3 11-28-79 ACH-229 needs modification per Completed per procedure I.E. Bulletin 79-14.
2857 11-26-79 RPS - A Channel - TM/LP Calculator. Recalibrated 2886 29-79 Diesel Fire Pump - flange the lower Completed 1770 336 part of the recirculation line of the Diesel Fire Pump.
2825 11-21-79 Diesel Generator fuel oil filters - Completed change.
Monthly Operations Report December 1979 Page Four II. MAI: TE:LCICE (Significan: Safety Related) l . O .
- l Date i Des ription I Corrective A::icn d 2931 12 h-79 CH-1B Charging Pump - replace Completed
!. packing on dishcarge valves.
- l. 2831 12-h-79 Ilev Fuel Inspection Stand - rebuild Completed brackets for a more secure arrange-me nt .
2936 12-3-79 T1A-3 secondary Lov Volt Alarm on Replaced AC voltage sensor CB-20 alarming spuriously. 27-Th/TlA-3 EEVAR.
2458 11-3-79 Perform ultrasonic inspection of Completed per SP-FW-1 hot feedwater piping per SP-FW-1.
2496 11 79 Perform radiograph of RC-2A and Completed per SP-FWRG-1 RC-2B =11n feedvater nozzle to safe end welds and safe end to piping velds per I.E. Bulletin 79-13 Rev.2.
1860 11-16-79 Inspect Diesel Generator Lube oil Confirmed that tube sheet is coolers for cracks around the outer soldered; however, no crack periphecy of the tube sheets as problem evident.
per I.E. Information :iotice 79-23 1770 337
-