ML19257B796

From kanterella
Jump to navigation Jump to search
Forwards Monthly Operating Rept for Dec 1979 & Revised Rept for Nov 1979
ML19257B796
Person / Time
Site: Fort Calhoun Omaha Public Power District icon.png
Issue date: 01/10/1980
From: William Jones
OMAHA PUBLIC POWER DISTRICT
To: Stello V
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE)
Shared Package
ML19257B797 List:
References
NUDOCS 8001180355
Download: ML19257B796 (1)


Text

-

Omaha Public Power District 1823 HARNEY a O M A H A. NESRASKA 66102 e TELEPHONE 536 4000 AREA CODE 402 January 10, 1980 Mr. Victor Stello, Director Office of Inspection and Enforcement U. S. Nuclear Regulatory Commission Washington, D. C. 20555

Reference:

Docket No. 50-285

Dear Mr. Stello:

Please find enclosed ten (10) copies of the December Monthly Operating Report for the Fort Calhoun Station Unit No. 1. In addition, please find enclosed ten (10) copies of the revised Operating Data Report and Unit Shutdowns and Power Reductions Report for the month of November. The revision corrects the previously reported Generator On-Line Hours. As such, the Unit Service Factor, Unit Availability Factor, and Shutdown Duration numbers are also revised.

Sincer ly, t I

-l W. C. J nes Divisio Manager Production Operations WCJ/KJM/BJH:Jem Enclosures cc: NRC Regional Office Office of Management & Piogram Analysis (2)

Mr. P. R. Szeker - Westinghouse Mr. A. G. Schoenbrunn - Combustion Engineering NRC File 1770 329 80 011 g 9 3 55