Interim Deficiency Rept Re Hpis Pump Motor Starting Torque Per 740425 Telcon W/Aec.Motors Returned to Westinghouse for Repair.Initial Tests Performed & Limited Repair Work Underway
ML19319C059
Person / Time
Site: Davis Besse Cleveland Electric icon.png
Issue date: 06/07/1974
From: Roe L
TOLEDO EDISON CO.
To:
References
NUDOCS 8001310438
Download: ML19319C059 (1)


Text

_

s= .%

TOLEDO EDISON

. LowtLL E. Act u . .... n . .,

14191 259-5242 June 7,1974 Docket No. 50-346 Dr. Donald F. Knuth, Director Directorate of Regulatory Operations Office of Regulation U. S. Atomic Energy Commission Washington, D. C. 20245

Dear Dr. Knuth:

This letter is submitted as an Interim Report regarding the Davis-Besse Nuclear Power Station Unit No. I high pressure injection pump motor starting torque deficiency related by telecon to Mr. W. E. Vetter, Directorate of Regulatory Operations, Region III on April 25,1974.

The above motors have been returned to Westinghouse for test and repair as may be necessary. Initial tests have been performed and limited repair work initiated. A defm' itiw report of the deficiency, analysis of the safety implications, and the corrective action being taken will be submitted to yont office in accord with 10CFR Part 50.55 upon completion of our study of this problem.

Yours very truly, cc:

J. G. Keppler, Regional Director Director of Regulatory Operations Region 11I b

THE TOLEDO EDISCN COMPANY EDISON PLAZA 300 MAO!SCN AVENUE TCLECO. CHIO 43652 8001310$3[ [l