Text

.,

  • ^*

,l, fy=*

I m

LP" Davis Besse Nuclear Power Stata gEyV

$501 North State Route 2 Oak Harbor.Cho 43449-9760 January 13,1998'.

KB-98-0001 Document Control Dea -

U. S. Nuclear Regulatory Commission.

One White Flint North 11555 Rockville Pike

' Rockville, MD 20852-2738 Ladies and Gentlemen:

4 Monthly Operating Report, December 1997 Davis-Besse Nuclear Power Station Unit 1 Enclosed is a copy of the Monthly Operating Report for the Davis-Besse Nuclear Power Station for the month of December 1997.

If you have any questions, please contact E. C. Matranga at (419) 321-8369.

. Very truly yours, ames II. Lash Plant Manager Davis Besse Nuclear Power Station ECM/ljk.

Enclosure -

cc:

- A. B.' Beach g

  1. Ll(

NRCRegionIII Administrator y

'A. O. Hansen

' NRC Project Manager

- S. J. Campbell -

^ NRC Senior Resident Inspector.

9901150100 971231 PDR ADOCK 05000346 Y!)

hh r

?*

.- v OPERATING DATA REPORT DOCKET NO.

50-0346 UNIT NAME Davis-Besse Unit 1 DATE Jan 2,1998 COMPLETED BY Eugene C. Matranaa TELEPHONE 419-321-8369 REPORTING PERIOD December,1997 YEAR T.O

_Q MONTH DATE CUMULATIVJ 1 Design Electrical Rating (MWe-Net).

906 The nominal net electrical output of the unit specified by the utihty and used for the purpose of plant design.

2 Maximum Dependable Capacity (MWe-Net).

873 The gress electrical output as measured at the output temtinals of the turbine.

generator during the most restrictive seasonal conditions minus the normal station service loads, 3 Number of Hours the Reactor Was Critical.

744.0 8,236 2 114,432.2 The total number of hours during the gross hours of the reporting period that the reactor was critical.

4 Number of Hours the Generator Was On Line.

744.0 8,184.3 112,087.8 (Also called Service Hours). The total number of hours during the gross hours of the reporting period that the unit operated with breakers closed to the station bus.

The sum of the hours the generator was on hne plus the total outage hours should equal the gross hours in the reporting period 5 Unit Reserve Shutdown Hours.

0.0 0.0 5,532.0 The total number of hours during the gross hours of the reporting period that tt'e unit was removed from service for economic or similar reasons but was available for operation.

6 Net Electrical Energy (MWH).

659,835 7,183,363 90,226,557 The gross electrical output of the unit measured at the output terminals of the turbme-generator minus the normal station service loads during the gross hours of the reporting period, expressed in mega-Q *tt hours Negative quantities should not be used.

UNIT SHUTDOWNS DOCKET NO.

50-346 UNIT NAME Davis-Besse #1 DATE Jan 2.1998 COMPLETED BY E. C. Matranga REPORTING PERIOD: December.1997 TELEPHONE (419) 321-8369 DURATION l REASON (1)

NO.

DATE TYPE METHOD OF CAUSE/ CORRECTIVE ACTIONS F: FORCED (HOURS)

SHUTTING S: SCHEDULED DOWN (2)

COMMENTS No Unit shutdowns.

SUMMARY

Reactor power was mairtained at approximately 100% full power for the majority of the month. On December 7,1997, at 0000 hcurs, reactor power was reduced to approximately 92% to perform monthly turbine valve testing. At the completion of testing at 0255 hours0.00295 days <br />0.0708 hours <br />4.21627e-4 weeks <br />9.70275e-5 months <br />, power was increased to 100%.

(1) Reason:

@ Method:

A-Equipment Failure (Explain) 1-Manual B-Maintenance or Test 2-Manual Trip / Scram C-Refueling 3-Automatic Trip / Scram D-Regulatory Restriction 4-Continuation E-Operator Training & Ucense Examin 5-Other (Explain)

F-Administrative G-Operational Error (Explain)

H-Other (Explain)

.