ML19329B724

From kanterella
Jump to navigation Jump to search
Interim Deficiency Rept Re Auxiliary Shutdown Cabinet Unanchored by Required External Gussets.Gussets to Be Installed Prior to Startup
ML19329B724
Person / Time
Site: Davis Besse Cleveland Electric icon.png
Issue date: 03/15/1978
From: Roe L
TOLEDO EDISON CO.
To:
References
REF-PT21-78-039-000 NUDOCS 8002060732
Download: ML19329B724 (2)


Text

, . - _ _ _ _ _ _ _ _ _ _ _ _ _

k ..

. . ~

ATTACHED IS PART 21 REPORT FROM IE MAIL UNIT - ROOM 317 E/W PART 21 IDENTIFICATION NO. COMPANY NAME -[ b-[.in<.

7 P -L M -( 0/' DOCKET NO. wt .; vt DATE OF LETTER .3 /,1/ 7#

DATE C?STRIBUTED 'f / 2 9 / 7 C

/ / '/

/

ORIGINAL REPORT SUPPLEtiENTARY Q DISTRIBUTION: _

T R C R(R) FUEL CYCLE AND

~

SAFEGUARDS (S)

MATERIALS (M)

NRR/ DOR (Stello) NMSS/FC&MS NRR/ DOR (Stello)

NRR/DPM (Boyd) AD/FF&MSI NMS.5/SG AD/ROI (Sniezek/Seyfrit) PDR AD/SG-IE .

AD/RCI MIPC AD/ROI MIPC REGIONS . REGIONS REGIONS NSIC -

MIPC PDR TIC PDR LPDR IE FILES (2) LPDR NSIC CENTRAL FILES-SS 396 NSIC TIC CENTRAL FILES (CHROM) TIC IE FILES (2) IE FILES (2)

CENTRAL FILES 016 -'

CENTRAL FILES 016 M j CENTRAL FILES (CHRON) CENTRAL FILES (CHRON';

CENTRAL FILES - SS 39 ACTION:

PRELIMINARY EVALUATION OF THE ATTACHED REPORT INDICATES LEAD RESPONSIBILITY FOR FOLLOW-UP AS SHOWN BELOW:

m@IE NRR Q NMSS Q 0THER [

Y""s '

L a n 02 o.so 7p

$ g _

. e .

.c

<m

~~~ 0 h f -' 0 k March 15, 19/8

  • Serial No. 423 EDISON Docket No. 50-346 LOWEL'. E. roe v.no presisaat 1.icense 50. NYV-3 idtM 759. Meg r

Mr. Jamen G. Keppler .

Hagiunal Director, Region 111 ,'

Ottice of inapucLiun & Enforcement '

U. S. Nuclaur RuAulatory Coct2seion 799 Ruuuevelt Road Clon Ellyn. 1111nola 601*7 J

Dear .*tr. Keppler:

In secord,*nca with 10 CFR Part 21. 71 (b), this is a repor t o f a de f ect in .

componenra installed in the Davis-D.r.se Nuclear Power Station Unit No. 1.

The component invniv*d is the auxilisry shistdown cabinct.

g The auxiJiary ahutdown cabiner was snippliud by Wolfe 6 Mann and Inulalled by Tlachbach & Moore /colgan Electric.

~ The dutucL involved is that the cabinct has not been anchored by external gumwets as called for by thu applicabic installation drawing.

Thlw condition unr. discovered through the review of docunentation turnover packages. The safety hazard which could be cra.1 tad by this defcet is, if the cabinct installation tailed during a seismic event. it could become 1 impossible to provida auxiliary fccdvater flow. There is one auxiliary shutdown cabinar containing this defect at Davis-Desse Un1L No. 1.

J On March 10, 1978, tha deviation was evaluatud by Toledo Edison to be a defcet. Thf s t1acter was reported to your Mr. R. Knop on March 10, 1978.

l The corrective acelun co be taken is to add the Russets per the drawing.

We will complete this installation prior to startup following the planned April 1978 outage.

This information has not. baan given to other licensees or purchasers.

Yourv very truly.

A

/

k /

1.ER:ss

'..0 . 2 73 1

1 THE TOLEOO EDISON COMPANY FDISCN PLAZA 300 MADISON AVENUE TCLEDO. CMio 43052

. . .