ML19317F599

From kanterella
Jump to navigation Jump to search
Final Deficiency Rept Re Lock Nut Staking on Type Smb Limitorque Operated Valves.Insp Program Implemented & Operators Staked
ML19317F599
Person / Time
Site: Davis Besse Cleveland Electric icon.png
Issue date: 04/27/1977
From: Roe L
TOLEDO EDISON CO.
To:
References
270, NUDOCS 8001150918
Download: ML19317F599 (3)


Text

{

n ow TIIDO EDISM oars or occuwrur oars receiveo no C EDISON FLAZA ^ 4/27/77 5/4/77._ 7 0315 L.E ROW g ===O Raroar ov an YO ** ORIG - CC OTMER USERC [IIII

.{.C. EEFFLER ^

0 coeami~cs O o^"'~~'"

DIR FOR REGION III,GLEM ELLYN,w' fa..~icta^av

[ .o= wCassaa' O co==<~' O ..

C LA&S*

  • Post OFFect pile CODE U

REG NO

, CESCRIPfmm 'Mwee Se uneweesi ef REcgevgo sv Daft R0",f C_-

FaggO g4{t i i RE: CDE--DEFICIEBCY INVOLVING ., j SERYAL TYPE SMB LIMITORQUE (CY SETFRIT)

MOTOR OPERATORS FURMISHED FOR T= (CT IE TILES) )

DAVIS-BESSE POWER STATICE UNIT NOW 1_  ;

& r'v/ g. l

. CLosuR s CsCY-RFR-PILES 1 wxan: tuu.TEMES) i , (OT =..TZ)

TC 2) l (CY NRR: VAS l (c7 ::Tt= ="::.) '

l (CTPDR,LPDR,NSIC % TIC) 1 i, '

U S NUC-E AR *E 5sLA TOR Y COMMISSrON 8 0R u 4Rc m3 l

l l

l G001150 flh y

~ .

3 ,

a TOLEDO EDISON Docket No. 50-346 LOWEu.E. ROE ww April 27, 1977 a.e e o -.a.

(4193 259-5242 Serial No. 270 Mr. James G. Keppler Regional Director, Region III Directorate of Regulatory Operations U. S. Nuclear Regulatory Co= mission 799 Roosevelt Road Glen Ellyn, Illinois 60137

Dear Mr. Keppler:

This Final Report is submitted in accordance with 10CFR Part 50.55(e) regard-ing the apparent deficiency involving several type SMB Limitorque motor operators furnished for the Davis-Bease Nuclear Power Station Unit No. 1.

This was discussed by Mr. J. D. Lenardson, Quality Assurance Manager, with Mr. D. W. Hayes, NRC Region III Office of Inspection and Enforcement, en April 15, 1977.

Description of the Deficienev The " Installation Tips" section on page 3 of the Limitorque Type SMB Instruc-tion and Maintenance Manual SMBI-170 (BP-5M-9/71) requires that the stem nut be secured tightly by the locking nut and that the top thread of the lock nut be crimped or staked. In February,1977, the Limitorque motor operators on two nuclear safety related valves were found running with the valve stem turning but the valve not opening. Investigation revealed that the lock nuts bad fallen off and the stem nut was loose, thus not operating the valve.

The top thread of the lock nuts had not been staked or crimped as required by the Limitorque Instruction and Maintenance Manual. Further investigation revealed that on 17 of 19 Limitorque operated valves inspected, the top thread of the lock nut had not been crimped or staked. These motor operators were  ;

furnished on equipment supplied by Velan, Powell, ITI Hammel-Dahl, and l Contromatic, who failed to fully implement Limitorque nanual requirements.

l Corrective Action Taken .  :

l There are 232 Limitorque motor operators installed at Davis-Besse Unit No. 1.

Of these,144 are considered to be nuclear safety related. An inspection program was established and implemented in which all 232 Limitorque motor operators were inspected for staking. Those operators found not to be staked were staked by Toledo Edison maintenance personnel. Of the 144 nuclear safety related operators inspected, 65 required staking while 50 were installed on a type of valve in which staking is not applicable. ,

I l THE TOLEDO EDISON CCMPANY EDISDN PLAZA 300 MADISON AVENUE TOLEDO pHlO 43652 7 0315 1 l