Monthly Operating Rept for Nov 1997 for Davis-Besse Nuclear Power Plant,Unit 1
ML20203A393
Person / Time
Site: Davis Besse Cleveland Electric icon.png
Issue date: 11/30/1997
From: Lash J, Matranga E
TOLEDO EDISON CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
KB-97-0138, KB-97-138, NUDOCS 9712120086
Download: ML20203A393 (3)


Text

{{#Wiki_filter:a TOL f DO EDISON A Centence ineepy Coepany De+Besse texlear Power State t,$01 teorth State Rode 2 Od Hartsar. OH 43449-9760 December i1,1997 Kil-97 0138 Document Control Desk U. S. Nuclear Regulatory Commission One White I: lint North 11555 Rockville Pike Rockville, MD 20852-2738 1,adies and Gentlemen: Monthly Operating Report, November 1997 Davis-llesse Nuclear Power Station Unit I linclosed is a copy of the Monthly Operrting luport for the Davis llesse Nuclear Power Station for the month of November 1997. If you have any questions, please contact II. C. Matranga at (419) 321 8369. Very truly yours, ames 11. Lash Plant Manager Davis llesse Nuclear Power Station 1:CMiljk linclosure ec: A.11. lleach NRC Region 111 Administrator A.G.Ilansen NRC Project Manager n S. J. Campbell NRC Senior Resident inspector -{# so 1 l' 9712120086 971130 PDR ADOCK 05000346 g PDR >

OPERATING DATA REPORT DOCKET NO. 50-0346 UNIT NAME Davis-Besse Unit 1__ DATE Dec 1,1997 7b

  • COMPLETED BY Eugene C. Matranga TELEPHONE 419-321-8369 E

RFPORTING PERIOD Nonmber,1997 YEAP. LQ

*-                                                                                                                                                                                                            MONTH     DATE                                  CUMULA_J1yE 3                      1 Design Electncal Rating (MWe-Net).

The %minal net ; 4ctncal output of 906 the an6 specifed by the ublity and used for the purpota of plant desigit

  • j 2 Maxir um Dependable Capacity (MWe-Net). 873
    ^                    The gress doctncal output as measured at the output terminals of the turbine-generator dunng the most restnctrve seasonal conditions manus the normal stat:on service loads.

3 Number of Hours the Reactor Was Cntical. 720.0 7,492.2 113,688.2 Ms total number of hours dunng the gross hours of the reporting penod that the reactor was critics t 4 Number of Hou:s the Generator Was On Line. 720.0 7.440 3 111,343.8 (Also called Seryg.e Hours) The total < number of hours dunng the gross hours of the reoorting penod that the unit o[.arated with breakers closed to the station bus. The sum uf the hours tne generator was on lina plus the total outys hours should caual the gross hours ln the reporting penod 5 Unit Reserve Ehatdown Hours 0.0 0.0 5,532.0 Tne total numtrr of hours dunng the gross hours of the reporting penod that the unit was removed from service for economic of similar reasons but was available for operation 6 A c. Electrical Enerc/ (MWH). 637,473 6,523,528 89,566,722 The gross electncal output of the unit meatured at the output tervr;nals of the

        ,                   turtune-generator minus the normal sisition service loads dunng the pross hours of the rey)fting penod. expressed in mega-watt hcdrs Negative quantites should not be used l

i l

                                                                                     ' Y 2:'

UNIT SHUTDL

  • DOCKET NO. 50-346 -

UNIT NAME Davis-Besse #1 DATE Dec 1,1997 COi"M..ETED BY E. C. Matranga ~ TELEPHONE (419) 321-836S REPORTING PERIOD: November.19Q7 TYPE DURATICN REASON (1) METHOD OF CAUSE/CORPECTIVE ACTIONS . NO. T DATE F: FORCED (HOURS) SHUTTING S: SCHEDULED DOWN (2) COMMENTS No Unrt shutdowns.

SUMMARY

Reactor power was maintained at approximately 100% full power for the majority of the month. On November 9,1997, at 0005 hours, reactor power was reouced to approximately 92% to perform monthly turbine valve testing. At the completion of testing at 0255 hours. power was increased to 1005 On November 17,1997, at 1123 hours, power was reduced to 90% due to a failed Turbine Control Valve Servo Control Valve. Power was restored to 100% on Noveinber 18,1997, at 0035 hours following replacement of t! e Sarvo Control Valve. On Nov9mbe.r 23,1997, at 0001 hours, power was reduced to 96% to per'orm mMerator coefficient testing. Power v as restored to 100% on November 23,1997, at 1840 hours following completion of the testing. (1) Reason: I2) Method: A-Equipment Failure (Explain) 1-Manual B-Maintenance or Test 2-ManualTrip/ Scram C-Refueling 3-Automatic Trip / Scram D-Regulatory Restriction 4-Continuation E-Operator Training & License Examin 5-Other (Explain) F-Adrninistrative G-Operational Error (Explain) H-Other (Explain) _ _ _}}