t i Enclosure I COLR Page 1 of 25 Revision 0 TOLEDO EDISON COMPANY DAVIS-BESSE UNIT 1 CYCLE 12 CORE OPERATING LIMITS REIORT l

l 1

LIST OF EFFECTIVE PAGES Page C-1 through C-25 Rev.0 9805280029 980519 PDR ADOCK 03000346 P pop C-1

COLR Page 2 of 25 Revision 0 1

Technical Specification /COLR Cross-Reference I

Technical Specification COLR Figureffable l

l 3.1.3.6 Figure la Regulating Group Position and Alarm Setpoints*, O to 275 3.1.3.8 110 EFPD, Four RC Pumps i

3.1.3.6 Figure 1b Regulating Group Position and Alarm Setpoints*,275 i10 3.1.3.8 to 620i10 EFPD, Four RC Pumps

~

3.l.3.6 Figure 1c Regulating Group Position and Alarm Setpoints*, after 620 3.1.3.8 i10 EFPD, Four RC Pumps 3.1.3.6 Figure 1d Regulating Group Position and Alarm Setpoints*, O to 275 i10 3.1.3.8' EFPD, Three RC Pumps 3.1.3.6 Fig'tre 1e Regulating Group Pos ition and Alarm Setpoints',275 il0 3.1.3.8 to 620i10 EFPD,Three RC Puiaps 3.1.3.6 Figure If Regulating Group Position and Alarm Serpoints*, after 620 3.1.3.8 i10 EFPD,Thice RC Pumps I

3.1.3.7 Figure 2 Control Rod Core Locations and Group Assignments 1

3.l.3.9 Figure 3 APSR Position Alarm Setpoints

  • 1 3.2.1 Figure 4a AXIAL POWER IMBALANCE Alarm. Setpoints*, O EFPD to 275 i10 EFPD, Four RC Pumps 3.2.1 Figure 4b AXIAL POWER NBALANCE Alarm Setpoints*,275110 EFPD To 620110 EFPD, Four RC Pumps l
  • Error Adjusted Operating Limits C2

COLR l Page 3 of 25 Revision 0 3.2.1 Figure 4c AXIAL POWER IMBALANCE Alarm Setpoints*, after 620110 EFPD, Four RC Pumps 3.2.1 Figure 4d AXIAL POWER IMBALANCE l Alarm Setpoints*,0 EFPD to 275 110 EFPD,Three RC Pumps 3.2.1 Figure 4e AXIAL POWER IMBALANCE Alarm Setpoints*,275110 to l

620i10 EFPD,Three RC Pumps 3.2.1 Figure 4f AXIAL POWERIMBALANCE Alarm Setpoints*, after 620i10 EFPD,Three RC Pumps 2.1.2 Figure 5 AXIAL POWERIMBALANCE Protective Limits 2.2.1 Figure 6 Flux -A Flux / Flow (or Power /

Imbalance / Flow) Allowable Values-3.2.4 Tables la and Ib QUADRANT POWER TILT Limits 3.1.1.3c Table 2 Negative Moderator Temperature Coefficient Limit B2.1 Table 3 Power to Melt Limits 3.2.2 Table 4 Nuclear Heat Flux Hot Channel Factor - Fo 3.2.3 Table 5 Nuclear Enthalpy Rise Hot Channel Factor- F%

3.2.3 Figure 7 Allowable Radial Peak for F%

  • Error Adjusted Operating Limits C-3

. COLR Page 4 of 25 Revision 0 TOLEDO EDISON DAVIS-BESSE UNIT 1 CYCLE 12 CORE OPERATING LIMITS REPORT 1.0 Core Operating Limits This CORE OPERATING LIMITS REPORT for DB-1 Cycle 12 has been prepared in accordance with the regekments of Technical Specification 6.9.1.7. Th'e core Operating l Limits have been developeo using the methodology provided in reference 2.0 (1). The licensed length of Cycle 12 is 684 EFPDs.

l The following cycle-specific core Operating Limits, Protective Limit and Flux -A Flux / Flow Reactor Protection System Allowable alues are included in this report:

1) Regulating Group Position Alarm Setpoints (error adjusted Operating Limits) and Xenon reactivity " power level cutoff"
2) Rod program group positions (Control Rod Core locations and group assignments)
3) Axial Power Shaping Rod Alarm Setpoints (error adjusted Operating Limits)
4) AXIAL POWER IMBALANCE Alarm Setpoints (error adjusted Operating Limits)
5) AXIAL POWER IMBALANCE Protective Limits
6) Flux-AFlux/ Flow (or Power / Imbalance / Flow) Allowable Values
7) QUADRANTPOWERTILTlimits
8) Negative Moderator Temperature Coefficient limit
9) Nuclear Heat Flux Hot Channel Factor, Foand
10) Nuclear Enthalpy Rise Hot Channel Factor, F%

2.0 References (1) BAW-10179P-A, Revision 2, " Safety Criteria and Methodology of Acceptable Cycle Reload Analysis."

C-4

COLR Page 5 of 25 Revision 0 Figure la Regulating Group Position Alarm Setpoints

  • O to 275110 EFPD, Four RC Pumps -

DavirrBesse 1, Cycle 12 This Figure is referred to by Technical Specifications 3.1.3.6 and 3.1.3.8 110 i u 100

~~

~:: Power Level '~- , ,r .


Cutoft # 100% l ----

.]

fl

/

I

?

90 .

r Unacceptab!c- ,. ,/

Operation ' j 80 ,

Operation I j_ .

' Restricted' 70 .

l l h- '

> \

I 2 60 s  !

r y-g {:} Shutdown ,

p

/

M rain -

~~

S 50 ',,

Limit i s N \l l

./ l 40  % g

\8 / . -- Acceptable

/

Operation 15 30 \ , /-

y 4-e -

d' 20 /

u -

/

n. 10 y n

0 0 25 50 75 100 125 150 175 200 225 250 275 300 Rod index (% Withdrawn) 0 75 100 l l I Group 5 0 25 75 100 I I I I Group G 0 25 100 l l I Group 7 Note 1: A Rod Group overtap of 2515% between sequential withdrawn groups 5 and 6, and G and 7, shall bc (naintained Note 2- Instrument error is accounted for in these setpoints.They are the error adjusted Operating Umits.

C5

. COLR Page 6 of 25 Figure 1b Regulating Group Position Alarm Setpoints

  • 275110 to G20110 EFPD, Four RC Pumps -

DasBesse 1. Cycle 12 This Figure is referred to by Technicat .

Specifications 3.1.3.6 and 3.1.3.8 i

I l

110 i

~~ ~

100 ~~~ ~ Power Level f f _____

Cutoff = 100%  !

L l l 90 "

Unacceptable l j l

~-~~' Operation / /

80 i i 1 i 1 1

70 '

/___.. operation ___q

[th j

Restricted ___.[-

2 60 , . , ,, /  ;

q -----

---Shutdown

[ '

f

E IAargin , /

59 ', '

Limit

, f-

~~~~~

i j

' '.c 3 40  ! / '

y \ ,

/ ,

s Acceptable

'6 30 i e, 7 Operation h ir e '

/

d' 20 -

w. '

s>

$ 10 _, /

0 0 25 50 75 100 125 150 175 200 225 250 275 300 Rod index (% Withdrawn) 0 75 100 l I I Group 5 0 25 75 1 30 l

Group 6 0 25 100 I

Group 7 Note 1: A Rod Group overlap of 2515% between sequential withdrawn groups 5 and 6, ard 6 and 7, shall be maintained

  • Note 2 Instrurnent error is accounted for in these setpoints.They are the error adjusted Operating Limits.

C-6

COLR Page 7 of 25 Revision 0 Figure IC Regulating Group Position Alarm Setpoints*

Nier 620110 EFPD, Four RC Pumps -

Davis-Besse 1, Cycle 12 This Figure is referred to by Technical Specifications 3.1.3.6 and 3.1.3.8 110 100 Power Level ,

Cutoff = 100% / s

\ > < \

90

/ /

Unacceptable 1 l

l 80 O mration

/ 1

/

/ r 70 Operation fo a 60 Shutdown 2

/

//~~~~ Restricted l

1 j

Marg.in e --

q _ , j l

s Umit f ' --

@ 50

jE. i -

3 40 3 j ,

/ Acceptable 3 30 , '.- Operation n

e g 20 ,

g --  ;

a.- 10 -

f--

0 0 25 50 75 100 125 150 175 200 225 250 275 300 l Rod Index(% Withdrawn) 0 75 100 I I Group 5 I) 25 5 1 30 Group 6 0 25 1 X) l Group 7 Note 1: A Rod Group ovedap of 2515% between sequential withdrawn groups 5 and 6, and 6 and 7, shall be maintained

  • Note 2; lastrument erroris accounted for in these setpoints. They are the erroradjusted Operating Limits.

C-7

. COLR Page 8 of 25 Revision 0 Figure ld Regulating Group Position Alarm Setpoints*

O to 275110 EFPD,Tivec RC Pumps -

l Davis-Besse 1 Cycle 12 This Figure is referred to by Technical Specifications 3.1.3.5 and 3.1.3.8 i

110 100 J 90 80 =  :

Power Level , ,
Cutoff = 75% ::: Unacceptabic '

/ ,

^

70' Operation /  !

2 60 .

/

[ Ope' ration ~

f!j S0 :::: Shutdown _ s Restricted l iE  :::: Margin 7

" ^

3 40 ::: 1.imit / '

f \  ;

'6 30

\ t i

_ Acceptable :

)

t i , y -

a.

~

20 ,

y Operat. . ion o.

f 10 /

f

/

/

0 0 25 50 75 100 125 150 -175 200 225 250 275 300 Rod Index(i6 Withdrawn) 0 75 100 l l Group 5 3 25 5 1)0 Group G 0 25 1 X)

I Group 7 Not31: A Rod Group ovedap of 2515% between sequential withdrawn groups 5 and G, and 6 and 7, shall be maintained.

  • Note 2- lastrument error is accounted for in these setpoints. They are the error adjusted Operating Limits.

C-8

, COLR Page 9 of 25 Revision 0 Figure le Regulating Group Position Alarm Setpoints

  • 275+10 to 620+10 EFPD, Three RC Pumps -

Davis-Besse 1, Cycle 12 This Figure is referred to by Technical Specifications 3.1.3.6 and 3.1.3.8 110 100 -

l 90 80

Power Level f j
Cutoff = 75% Unacceptable '

/

g 70 Operation s N s l 2 60 / /

g ,

Operation r i Restrleted  ;

50 g@ Shutdown ,

e l

Margin /

0 ~

Limit f ,, - m E 30 / -

-s --

@ f,- Acceptable su 20

'p ' - Operation

,/-

g ' '

n. 10 .f

---, /

V .----

0 25 50 75 100 125 150 175 200 225 250 275 300 Ro:1Index(% Wittdram) 0 75 100 l l I Group 5 3 5 75 1 30 Group 6 0 5 1 30 Group 7 Note 1: A Rod Group overlap of 2515% between sequential withdrawn groups 5 and 6, and 6 and 7, shall be maintained

  • Note 2: Instrument error is accounted for in these setpoints.They are the error adjusted Operating Limits .

C-9

COLR Page 10 of 25 l'Oure 1f Regulat:ag Group Position Alarm Setpoints*

After 620110 EFPD, Three RC Pumps -

Davis-Besse 1, Cycle 12 This Figure is referred to by Technical specifications 3.1.3.6 and 3.1.3.8 110 . -_

100 80

Power Level ,. g_--
Cutoff = 75% Unacceptable <

/

g 70 Operation ,

g

/ A A /

2 60 '

/ ,

j

/ - Operation -__

l ,

-Restricted j gj 50 Shutdown jE Margin / ll 9 40 , Limit N x "-~[

-.- y -

f

-'^

q ,

r ., -->- ,

'd 30 i -

- / l r ,

E

\ /1/

Acceptable -

9:. 20 y'c - -

Operation f

- a_ 10 -,

/

l

.___y

?~ \

0 0 25 50 75 100 125 '150 175 200 225 250 275 300 Rod lodex(% Withdrawn) 0 75 100 I I Group 5 3 25 5 1 30 Group 6 0 25 1 30 I

Group 7 Note 1: A Rod Group overlap of 251 5% between sequential withdrawn groups 5 and G, and G and 7, chall be maintained Note 2: Instrument en or is accounted for in these setpoints. They are the error adjusted Operating Limits ,

C.!0

(

(

L ,

cout Page 1I of 25 Revision 0 Figure 2 control fiod core Locations and Group Assignments Davis-Besse 1, Cycle 12 This Figure is referred to by Technical Specification 3.1.3.7 4 X N

l A

B 4 6 4 l

l C 2 5 5 2 D 7 8 7 8 7 6 2 5 5 2 F 4 8 6 3 6 8 4 G 5 1 1 5 Fi w 6 7 3 4 3 7 6 K 5 1 1 5 l

L 4 8 6 3 6 8 4 M 2 5 5 2 N 7 8 7 8 7 0 2 5 5 2 P 4 6 4 R

I Z

I 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 Grou2 No. of Rods Function X Group Number 1 4 Safety 2 8 Safety 3 4 Safety 4 9 Safety 5 12 Control 6 8 Control 7 8 Contro!

8 8 APSRs Total 61 C-Il

1 COLR Page 12 of 25 Revision 0 Figure 3 APSR Position Alarm Setpoints

Lower Setpoint: 0%WD Upper Setp~oint: 100 %WD After APSf1 Pull - 620 +/- 10 EFPD to End-of-Cycle Three or Four RC pumps operation **

Insertion Prohibited

  • Error Adjusted Operating Limits Power restricted to 77% for 3 pump operation l

l C-12

COLR AXtAL POWER IMBALANCE Alarm Setpoints Page 13 of 25 Faure 4a 0 to 275110 EFPD, Four RC Pumps - Revision 0 Davis-Besse 1. Cycle 12 This Figure is referred to by Technical

' Specification 3.2.1 i10

---RESTRICTED

/ 100 ', \\

_~ZREGION -! ./

1 .

y__ J

,/',l _.__

/ go-j-__

/

//- -t .

\

  1. # 80 f

i I

1 i .__

70- i


I. n


- T tu { ,__

___.-jL ___;

- $: ----RESTRICTED .__

l REGION i

2, ----60 .

i

._n i I 4

]q @.-- -50  !

l g

! ., a f---

! 11 til .

I l i! h--- {___

l } g

, e .

i .I _r 30 '.,

t, I .__-ca I ,

l

-2cn PERMISSIBLE j l ) ~

li OPERATING ~~~

I h i! REGION 3 , ---

h g__

1) .

-50 -40 -30 -20 -10 0 10 20 30 40 50 AXIAL POWER IMBALANCE %

LEGEND FUt L INCORE EXCORE

. Note 1: Instrument error is accounted for in these setpoints.They are the error adjusted Operating Limits.

C-13

COLR Figure 4b AXIAL POWER IMBALANCE Alarm Setpoints

__8

/ , \

r g 100 3 g

-~ RESTRICTED-f

---REGION ---

f

___[ t s

\_

s' l/ / i

{__;

/

' 80 \

/

l 1 -

f ' I

/ i -

70-

/_.-_7 ,

i nu . _

E ..._

I / 3: RESTRICTED._-

I 2----60 a I REGION  :-~ ,

i n '

i a e

@.- -- 50 i

E i  !

. n i m 8 i


40 ]

g O _

a y,o I j _[----30 '

i

! t  ;

PERMISSIBLE i OPERATING I REGION ,

i .

a i i i

-50 -40 -30 -20 -10 0 10 20 30 40 50 AXIAL POWER IMBALANCE %

LEGEND FULL INCORE c

.EXCORE

  • Note 1: Instrument error is accounted for in ttiese setpoints.They are the error adjusted Operating Limits C-14 L___ ____ _ _ _ _ _ __ _ _

' COLR Faure 4C AXtAL POWER IMBALANCE Alarm Setpoints

  • P#Se 15 of 25 After 620110 EFPD, Four RC Pumps-Rev..ision 0 Davis-Besse 1. Cycle 12 This Figure is referred to by Technical Specification 3.2.1 i10 22 RESTRICTED / / joo- g I REGION

)

/---~/ \'

\

1 j

/ L

)

/ / -  !

f---;

/

j 60 j f l I

/ .--

70-

/--- / E ein RESTRICTED.--

[---/

id: }

, 2--- .

I REGION -:

I a

' 'C 4  !

@ '.---50 l E I I

a m

I

-40 i

h- g i

'5 l $.

j (----30 j

i

?

I PERMISSIBLE ~

i OPERATING i j - REGION i

-10 .

e

_--_l g

-50 -40 30 -20 -10 0 10 20 30 40 50 AXIAL POWER IMBALANCE %

LEGEND FULL INCORE EXCORE

  • Note 1: Instrument enor is accounted for in these setpoints.They are the error adjusted Operating Limits.

C 15 1

L ___

COLR Figure 4d AXIAL POWER (MBALANCE Alarm Setpoints

l 100-90-00-RESTRICTED - g

'~

REGION --[ 7 t i L

/ / .__

70 ,

/t '

- p e,<

i {

- RESTRICTED.__

/__f 3:

2* -- -

60 i REGION

___/ a J < 1 J I A

[ [ $----50'  !, l 4

E ,

l 9

1 ne. f  ;

I

.___40- j

._ n

____ _.__j _ o.

e ___ .

t i

p. ---se '

, $- -  ! l l I l -y '

i

-PERMISSIBLE -  !

- 'l \

l OPERATING i g - REGION '

10- ,

I )

I 1 4

-50 40 30 20 -10 o to 20 30 40 50 1

l AXtAL POWER IMBALANCE %

LEGEND FULL INCORE

_EXC_ ORE _ _ _

  • Noie 1: Instrument error is accounted for in these setpoints, They are tne error adjusted Operating Umits.

C. I 6

-

  • COLR frjure 4e AX1AL POWER IMBALANCE Alarm Setpoints Page 17 of 25 275110 to 620+10 EFPD, Three RC Pumps- ..

Davis-Desse 1[Cyc!c 12 Revision 0 This Figure is referred to by Technical Specification 3.2.1 i10-100 80 RESTR N -f / s i

' N g 4--,.

REGION --

,7

--- 3 3

/ / ~~g s - tu 1

/ / - -RESTRICTED.-- --

[ ,

_R--- _

I ___, REGION  :--

~

r J s -

I

/ ,

_~

_/ ~2

/ --@ .-  !


j l --g - ,

__g ,

F.- -  ; l

---y ,

I '~_ZZ Z i#, j j g 30- ,

1 g ,

...-- -_o ,

1 g'

! 20-PERMISSIBLE- l J

I _ OPERATING '

y REGION I I )'

I

-50 -40 -30 -20 -10 0 10 20 30 40 50 l

AXtAL POWER IMBALANCE %

LEGEND FULL INCORE EXCORE

  • Note 1: Instrument error is accounted for in these setpoints. They are the error adjusted Operating Limit C-17 l

l

COLR Faure 4f AX1AL POWER IMBALAf 4CE Alarm Setpoints

  • Page 18 of 25 After G20110 EFPO,Three RC Pumps - Revision 0 Da*cBesse 1. Cycle 12 This Figure is referred to by Technical Specification 3.2.1 110 100

-90 l

\

80 RESTRICTED / , i

!! REGION .

f

/ /

e

.-- 'n

(_ }

i l _/ 2

,a 1 .

4__, / 3 RESTRICTED - -

/ , 2--- -

REGlON L  :/ g  ;

/ f A

/ "j .._ 50-5 I

J

/

/ 2 E

/ 6-

' 1 9 d  !

l nu

--- l O l d

M i

{--- )'

8 ,

t

- PERMISSIBLE -  !,

1 OPERATING (

1

-REGION $

10 j

'I

..___j 1

t

-50 -40 -30 -20 -10 0 10 20 30 40 50 AXtAL POWER IMBALANCE %

LEGEND FULL INCORE

(

EXC_ ORE _ _ _

e Note 1: Instrument erTor is accounted for in these setpoints.They are the error adjusted Operating Limits, C-IS

' I COLR Page 19 of 25 Revision 0 j Figure 5 AXfAL POWER IMBALANCE Protective Limits This Foure is referred to by Technical Specification 2.12 l  % RATED THERMAL POWER

- 120 4

(-44.8,112) (52.1,112) 1 110

. -- 100 (60.9,100) 3 PUMP LIMIT

~~

(-44.8,90.94) (52,90.94)

(-65.3,. 80) -- 80 (60.9,78.94)

-- 70 i

(-65.3, 58.94) -- 60

__ so

-- 40 UNACCEPTABLE UNACCEPTABLE OPERATION OPEfiATION

-- 30 ACCEPTABLE OPERATION -

20 FOR SPECIFIED RC PUMP COMBINATION l

-- 10 I I I I I I I I I l I I I I l I I 70 50 30 10 0 10 20 30 40 50 60 70 80 AX1AL POWER IMBALANCE,%

Required Measured

+

Reactor Coolant Flow to Ensure Pumps Operating Flow. anm Comofiance.com ,

4 380,000 389,500 l 283,860 290,957 1 3 l.

1 C-19

i COLR Page 20 of 25 - -l

- Revision 0 Fi 9uee 6 Flux-AFlux/ Flow (or Power / Imbalance / Flow)

Allowable Values This Figur. Is c.f.cred to by T.chnical Specificotton 2.2.I tio -

iiiiii!i

- 1]_I i e I I l \

s

' -4 PUMP -

/ -LIMIT - -

\

100' , - y

' T

\

s 90 -- t i

i \

/i '

I i ti i Ill!!' I T

/ s N

/ ~-Curve shows trip \

setpoint for an W-s

'/ approximately t

1 254 flow reduction s s

for three pump

  • - (bkO60 h

Th e.. o c t uof pm) .s.tpoint __

\

~U

> - - - -- wtll b. calcutat.d --

3 PLMP -  %

EXAMPLE \

) " M-by the R actor

~ Prot ction S 3stem and will be directly

$ proportional to the o actual flow wlth A

'O i thr.. pumps.

(JNACCIPTABLE- UNACCEPTABLE OPERATION OPERATION 30 -

20 ACCEPTABLE nPERATION FOR

_.__. SPECIFIED RC PUMP COMBINATION----

Io ----

l O

20 25 30 35 40

-10 5 0 $ to 15

-40 35 -30 -25 -20 -15 Axial Power Imbalance, %

c 20 l

.COLR Page 21 of 25 Revision 0

' Table la OUADRANT POWER TILT Limits This Table is referred to by Technical Specification 3.2.4 l

l From 0 to 275 +10/-10 EFPD Steady-state Steady-state Limit for Limit for THERMAL THERMAL Transient Maximum a QUADRANT POWER TILT '

as measured by: POWER $ 60% POWER > 60% Limit Limit

(%) (%) (%) (%)

Symmetrical Incore 6.8 4.0 10.03 20.0 L

detector system Table Ib i

After 275 +10/-10 EFPD l

Steady-state Steady-state l l

Limit for Limit for

' QUADRANT POWER TILT THERMAL THERMAL' Transient Maximum no measured by: POWER $ 60% POWER > 60s Limit Limit

(%) (%) (%) (%)

i l

i Symmetrical Incore 6.8 3.7 10.03 20.0 detector. system  ;

i i

l i

C-21

l COLR f ,

Page 22 of 25

[ Revision 0 l

l Table 2 Necative Moderator Temperature Coefficient Limit This Tabic is referred to by Technical Specification 3.1.1.3c Hegative Moderator Temperature -4.0 x 10~4 Ak/k/F Coefficient Limit (at RATED THERMAL POWER) )

Table 3 Power to Helt Limits This Table is referred to by Technical Specification Bases - B2.1 l

Batch 9F Batch 12A/12C Batch 13A/13B Batch 14A-D f Fuel Assembly Type Mark-B8A Mark-B10AZL Hark-B10A Mark-B10M Minimwn linear heat rate to melt, kW/ft 20.5 22.3 22.3 22.2 (22.0/21.0)(a)

(a) Linear heat rate to melt limit for 3 wt% and 6 wt% Gd rods during cycle 12.

+

C-22

COLR' Page:G of 25 Revision 0 1

Table d' Nuclear Heat Flux Hot Channel Factor - Fg This Table is referred to by Technical Specification 3.2.2 Heat Flux Hot Channel Factor Fg Fg shall be limited by the following relationships:

Fg s LHR N(Bu)/[ LHRAVG

  • P J (for P $ 1.0)

LHRE MN(Bu): See the Tables below LHRAYG = 6.139 kW/ft for Hark-B8A fuel LHRAYO = 6.253 kW/ft for Mark-B10AZL fuel LHBAYU = 6.253 kW/ft for Mark-B10A fuel LHR AYG = 6.247 kW/ft for Mark-B10M fuel P = ratio of THERMAL POWER / RATED THERMAL POWER BU = Fuel Burnup (mwd /mtU) i Batch 9F (Mark-B8A) LHR kW/ftI "I

<24,500 60,000 Axial Seament mwd /mtU mwd /mtU 1 12,.8 84 2 15.2 9.9 3 15.7 10.5 4 15.8 10.5 5 16.4 10.5 6 17.0 10.5 7 16.2 10.0 8 13.6 8.4 L

C-23

COLR Page 24 of 25 Revision 0 Table 4(con't)

Batch 12A/12C (Mark-B10AZL) LHRA um kW/f t *8 8 540,000 47,016 47,557 49,180 55,000 60,000 Axial Seement mwd /mtU mwd /mtU mwd /mtU mwd /mtU mwd /mtU mwd /mtU 1 12.9 12.4 12.4 12.4 10.2 10.0 2 15.3 14.7 14.7 14.6 12.1 11.8 3 16.2 15.6 15.6 15.5 12.8 12.5 4 16.2 15.6 15.6 15.5 12.8 12.5 5 16.2 15.6 15.6 15.5 12.8 12.5 6 16.6 16.0 J6.0 15.5 12.8 12.5 7 16.2 15.6 15.4 14.7 12.2 11.9 8 13.6 13.1 12.9 12.4 10.2 10.0 Datches 13 A & B (Mark-B10A) LHR ALLOW kW/ft(a)

<20,000 20,000 40,000 47,016 47,557 49,180 55,C00 60,000 Axial Seoment mwd /mtU mwd /mtU mwd /mtU mwd /mtU mwd /mtU mwd /mtU mwd /mtU mwd /mtU 1 13.6 12.9 12.9 12.4 12.4 12.4 10.2 10.0 2 16.0 15.3 15.3 14.7 -14.7 14.6 12.1 J 1. 8 3 17.2 16.2 16.2 15.6 15.6 15.5 12.8 12.5 4 17.5 16.2 16.2 15.6 15.6 15.5 12.8 '1:2.5 5 17.5 16.2 16.2 15.6 15.6 15.5 12.8 12.5 6 17.8 16.6 16.6 16.0 16.0 15.5 12.8 12.5 7 17.4 16.2 16.2 15.6 15.4 14.7 12.2 11.9 8 14.6 13.6 13.6 13.1 12.9 12.4 10.2 10.0 l

l l

Datches 14A-D (Mark-BIOM) LHR ALLOW kW/ft(a)

<20,000 20,000 35,000 Axial Segment mwd /mtU mwd /mtU mwd /mtU 1 13.6 12.9 12.9 2 16.1 15.3 15.3 3 17.2 16.2 16.2 4 17.5 16.2 16.2 5 17.5 16.2 16.2 6 17.8 16.6 16.6 7 17.4 16.2 16.2 8  !

14.6 13.6 13.6 '

(a) burnupLinear interpolation points is valid forfor allowable these tables.linear heat rate between specified C 24

l l

COLR i

Page 25 of 25 Revision 0 Table 5 Nuclear Enthalpy Rise Ilot Channel Factor - F$1t

, This Table is referred to by Technical Specification l 3.2.3 l Enthalpy Rise flot channel Factor F$n F",y 5 ARP [1 + 0.3(1 - P/Pm)}

ARP = T.llowable Radial Peak, see Figure 7 P = TffERMAL POWER / RATED THERMAL POWER and P $ 1.0 Pm = 1.0 for 4-RCP operation Pm = 0.75 for 3-RCP operation Figure 7 Allowable Radial Peak for F$13 l

2.1 s s k-

~~

~ ~ %

d *"

2

[p W - %

~  %

'N

%_^

/

/

/F \ ~ ~

~_

^ w

.- p[_1 _.

7 N \ -

S ,g .

-i "i

dI__ %N 'N N

illl --~~_ N-'s.Ts m

's N E N ' s t'A N Nm'N 'N N.

Ei 1 ' \

E .8 N N a

e m'N wm s \'N-Ns 28.12" _'

x -s %

. i y 'N , 's s e  % N

< i'7 ' s

' s N'N s 1 56.2r 3 g

g ' s 's_' s x ' s ' s 51.0 N N s

84.sc-wg s s V

1.5 , 4q 112.48" -

1 1.4 1.1 12 1.3 1.4 1.5 1.6 1.7 1.8 1.9 Axial Peak i

Based on an active core height of 140.6 inches. Linear interpolation and extrapolation above 112.48 inches are acceptable. For axial heights <28.12 inches, the value at 28.12 inches will be used.

C-25