Special Rept:On 980624,Unit 1 Site Damaged by Tornado & High Winds.Alert Declared by DBNPS Staff,Dbnps Emergency Response Facilities Activiated & Special Insp Team Deployed to Site by Nrc,As Result of Event
ML20236U501
Person / Time
Site: Davis Besse Cleveland Electric icon.png
Issue date: 07/23/1998
From: Jeffery Wood
CENTERIOR ENERGY
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
2546, GL-88-20, GL-92-01, GL-92-1, GL-96-06, GL-96-6, TAC-M83613, TAC-M96803, TAC-MA0540, TAC-MA540, NUDOCS 9807300212
Download: ML20236U501 (2)


Text

...#

4 man

_em Davis-Besse Nuclear Power Station yy@r 5501 North State Routei m

oak Harbor. Ohio 43449-9760 l

o

' John K. M '

419-249-2300 Yce President-Nuclear Fax: 419-321-8337 Docket Number 50-346

. License Number NPF-3

~ Serial Number 2546 July 23 -1998 United States Nuclear Regulatory Commission Document Control Desk Washington, D.C. 20555-0001

Subject:

Tomado Event Effect on Submittal of Information to the NRC Ladies and Gentlemen:

On June 24,1998, the Davis-Besse Nuclear Power Station (DBNPS) Unit Number 1 site was

' damaged by a tornado and high winds. As a result of this event, an Alert was declared by the DBNPS staff, the DBNPS Emergency Response Facilities were activated, and a Special

. Inspection Team was deployed to the site by the NRC, Due to this event and follow up actions, including responding to oral NRC Region III and NRC l

Office of Reactor Regulation requests for information related to the event, it has become necessary.to reschedule the responses to several formal NRC requests for additional information that existed prior to the June 24,1998, tornado.' This rescheduling was discussed with Mr. Allen G. Hansen, DBNPS NRC Project Manager, on July 9 and 13,1998. The following list provides a brief description of the subject response, the NRC Technical Assignment Control (TAC) Number, the previous date the response was due to the NRC, and the revised due date.

j Previous Revised

. TAC Number.

Description D yg ate

. Due Date D

)g MA0540 Generic Letter 92-01, Rev.1, 07/10/98 08/10/98 Sup.1: Reactor Vessel Structural Integrity ~

.V gb L.

. M96803 Generic Letter 96-06: Contain-01/16/98 08/17/98 ment Cooling (Two requests and status of 11RFO modifications)

M83613

Generic Letter 88-20, Sup. 4:

07/21/98 08/21/98 IPEEE I

98073002i21990723 ?

PDR ADOCK 05000346 S

PDRj I

i

Docket Number 50-346 License Number NPF-3 Serial Number 2546 Page.2 These necessary extensions result in schedule changes of not more than 31 days. It should be noted that very good progress has been made in the completion of TAC numbered issues to date in 1998, with nearly 30% of such issues being completed and closed since March.

1 Should you have any questions or require additional information, please contact Mr. James L.

l Freels, Manager-Regulatory Affairs, at (419) 321-8466.

j Very truly yours, I