ML19329B168

From kanterella
Revision as of 21:33, 31 January 2020 by StriderTol (talk | contribs) (Created page by program invented by StriderTol)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Forwards 761026 Davis-Besse Performance Testing & Equipment Qualification Rept 1061, Revised 761109 & Reactor Protection Sys Noise Testing. W/O Encl
ML19329B168
Person / Time
Site: Davis Besse Cleveland Electric icon.png
Issue date: 12/17/1976
From: Roe L
BABCOCK & WILCOX CO.
To: Stolz J
Office of Nuclear Reactor Regulation
References
168, NUDOCS 8001300738
Download: ML19329B168 (2)


Text

3 '

~

. Rcdater/ ,Ffe Cy. .

y 03. .

S

trt3 TOLEDO
  • " S  % EDISON Docket No. 50-346 OON '

LOWELL E. ROE v.c. am...=

December 17, 1976 e* " '*""**""'*"

g f 4193 259-5242 g

Serial No. 168 's 4 w Director of Nuclear Regulation _ , C)r, Aten: Mr. John F. Stolz, Chief " "~.-

Light Water Reactors Branch No. 1 .- - .

Division of Project Management ". -

United States Nuclear Regulatory Coc: mission ',

Washington, D.C. 20555

  • s s,

, .y '-

Dear Mr. Stolz:

Attached please find five copies of " Davis-Besse Performance Testing and Equipment Qualification Report No.1061" dated October 26, 1976, revised November 9,1976 and " Reactor Protection System Noise Testing" witich are referenced on Davis-Besse Nuclear Power Station Unit No. 1 FSAR pages 8-21 and 8-21a(2) respectively. These reports provide the results of the electrical interference and noise testing which has been performed on the Safety Features Actuation System and the Reactor Protection System.

This information completes our commitments as referenced in Item 5 of your November 16, 1976 letter concerning " Summary of Electrical Site Visit at the Davis-Besse Nuclear Power Station Unit No. 1 on October 6, 7 and 8, 1976".

Yours very truly, Attachments:

bj c/6 12810 l

THE TOLEGO EDISCN COMPANY EDISCN PLAZA 300 MACISCN AVENUE TOLECO, CHIO 43652 700l30613% ,