ML19323E028

From kanterella
Revision as of 17:22, 10 December 2019 by StriderTol (talk | contribs) (Created page by program invented by StriderTol)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Responds to NRC 800325 Ltr Re Violation Noted in IE Insp Rept 50-553/80-04.Corrective Actions:Rockwell Intl Insp Procedure Reviewed & Approved by TVA on 800307
ML19323E028
Person / Time
Site: Phipps Bend Tennessee Valley Authority icon.png
Issue date: 04/15/1980
From: Mills L
TENNESSEE VALLEY AUTHORITY
To: James O'Reilly
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
Shared Package
ML19323E027 List:
References
NUDOCS 8005220664
Download: ML19323E028 (2)


Text


,

'

s.

- *

, o I

L v TENNESSEE VALLEY AUTHORITY _. .

'

CH ATTANOOGA. TENNESSEE 374o1 400 Chestnut Street Tower 11

' 1 [ " 18 Pll l [i April 15, 1980 Mr. James P. O'Reilly, Director Office of Inspection and Enforcement U.S. Nuclear Regulatory Commission Region II - Suite 3100 101 Marietta Street Atlanta, Georgia 30303

Dear Mr. O'Reilly:

As requested in C. E. Murphy's March 25, 1980, letter, RII:WPK 50-553/80-04, to H. G. Parris, enclosed is a supplement to our September 24, 1979, response regarding OIE Inspection Report 50-553/79-12 and noncompliance item 553/79-12-01 for our Phipps Bend Nuclear Plant. If you have any additional questions concerning this subject, please call Jim Domer at FTS 854-2014.

Very truly yours, TENNESSEE VALLEY AUTHORITY

,

<

L. M. Mills, nager Nuclear Regulation and Safety Enclosure cc: Mr. Victor Stello, Director (Enclosure)

Office of Inspection and Enforcement U.S. Nuclear Regulatory Commission Washington, DC 20555 2  :

.

...

Ju-

  • 2.

8005220 h.%L An Equal Opportunity Employe- '0771C10

.

  • . ,

.

. .

, ENCLOSURE SUPPLEMENTAL RESPONSE TO C. E. MURPHY'S AUGUST 31, 1979, LETTER TO H. G. PARRIS REFERENCE RII:WPK 50-553/79-12 As requested in C. E. Murphy's March 25, 1980, letter, RII:WPK 50-553/80-04, this report supplements our September 24, 1979, response regarding noncompliance item 553/?9-l^-01. ._ _ _ _ _ .

Supplemental Response

'

This additional item of noncompliance, while similar in nature to the original noncompliance item, 553/79-12-01, identified in OIE Inspection Report 50-553/79-12, is the result of a completely different set of circumstances. The original noncompliance item, identified in a TVA audit by the Office of Power Quality Assurance and Audit Staff (OPQA&AS) on July 19, 1979, was the result of an inspection plan not being availabler' However, the additional item of noncompliance resulted from Rockwell International working to Revision C of procedure N318DWP000001 when only Revision B had received TVA approval. Rockwell field personnel, who had letters of approval avaiJable for all other inspection procedures, had only verbal confirmation of acceptance on Revision C of the above procedure. This verbal confirmation was received by telephone to Rockwell International at their Canoga Park, California, office and was incorrect.

.

Corrective Steps Taken And Results Achieved The inspection procedure revision was submitted to TVA for approval on March 5, 1980. The procedure was reviewed and approved by TVA on March 7, 1980. Since these revisions were written for purposes of eliminating potential operator errors and for clarification, work already performed to the revisions is considered satisfactory.

Action Taken To Prevent Recurrence l Rockwell International will be notified that they will no longer be allowed to operate using procedures which have only a letter to' signify TVA approval.

All future work will be performed using inspection procedures with the proper signature affixed to indicate TVA approval. This action was initiated March 6, 1980, and will be completed before any future inspections

, are performed. Implementation will be verified by a followup audit to be

'

conducted by OPQA&AS. The Authorized Nuclear Inservice Inspector (ANII),

,

required by Section XI of the ASME Code, will be notified of this change in policy. TVA will also evaluate its procedure approval process, particularly in the area of field revisions.

,

s Date When Full Compliance Will Be Achieved Full compliance was achieved on March 7, 1980, when the procedure revision  !

received TVA approval.

J