Letter Sequence Other |
---|
|
Results
Other: ML062080142, ML062480361, ML062480362, ML062480381, ML062480383, ML062480388, ML062480391, ML062510295, ML062510296, ML062510299, ML062510302, ML062510306, ML062510307, ML062510324, ML062510346, ML062510350, ML062510355, ML062510359, ML062510361, ML063050380, ML063050385, ML063050388, ML063050392, ML063050396, ML063050501, ML063050504, ML063050506, ML063050512, ML063050514, ML063050518, ML063050603, ML063050610, ML063050613, ML063060239, ML063060249, ML063060259, ML063060267, ML063060296, ML063060299, ML063060302, ML063060309, ML063060322, ML063070187, ML063070190, ML063070217, ML063070219, ML063070220, ML063070222, ML063070225, ML063070232... further results
|
|
|
---|
Category:E-Mail
MONTHYEARML22335A2802022-11-0404 November 2022 11-4-2022 Email Transmitting Draft Questions Pertaining to Pilgrim ISFSI Exemption Request ML22270A0422022-09-26026 September 2022 Acknowledgement Email for Holtec'S Request for Reporting Exemption with Regards to the Pilgrim ISFSI Annual Radioactive Effluent Release Report (Docket No. 05000293) ML22154A1622022-05-26026 May 2022 Letter and Email from Save Our Bay/Diane Turco Regarding Irradiated Water Release from Pilgrim ML22007A2602021-12-0606 December 2021 E-mail from P. O'Brien, Holtec, to A. Snyder, NRC, on Pilgrim Effluent Discharge ML21287A6192021-10-14014 October 2021 E-mail from S. Phillips, MEMA, to A. Snyder, NRC, Pilgrim Nuclear Power Station, Commonwealth of Massachusetts Consultation Response to Amendment Review for Emergency Preparedness ML21266A2512021-09-23023 September 2021 Consultation with Commonwealth of Massachusetts Regarding Proposed Amendment Application for Emergency Plan and Emergency Action Levels ML21266A2772021-09-23023 September 2021 HDI Clarification of Exemption Requested from 10 CFR 20, Appendix G, Section Iii.E ML21267A0012021-09-23023 September 2021 E-mail from A. Snyder, NRC, to A. Sterdis, Holtec, - Pilgrim Nuclear Power Station - Request for Exemption from 10 CFR 20, Appendix G, Section Iii.E Acceptance Review ML21257A3832021-09-15015 September 2021 E-mail from A. Snyder, NRC, to A. Sterdis, Holtec, - Pilgrim Nuclear Power Station - Follow-on Request Re Request for Additional Information 2 Pilgrim - License Amendment Request Independent Spent Fuel Storage Installation Only Emergency Pl ML21211A5912021-07-22022 July 2021 Consultation Response from Commonwealth of Massachusetts Regarding Proposed Pilgrim ISFSI Only Technical Specifications ML21211A5162021-07-22022 July 2021 Consultation Response from Commonwealth of Massachusetts Regarding Proposed Pilgrim ISFSI Only Physical Security Plan ML21200A2352021-07-13013 July 2021 Consultation Request to Commonwealth of Massachusetts Regarding Proposed Pilgrim ISFSI Only Technical Specifications ML21200A1522021-07-13013 July 2021 Consultation Request to Commonwealth of Massachusetts Regarding Proposed Pilgrim Isfi Only Physical Security Plan ML21176A1842021-06-25025 June 2021 Email from HDI Regarding Pilgrim Nuclear Power Station Training ML21180A0582021-06-17017 June 2021 Email from Region I Regarding Pilgrim Nuclear Power Station Inspection - EA-13-132 ML21097A0402021-04-0606 April 2021 E-Mail Consult with Commonwealth of Mass Re - Amendment Application - Physical Security Plan for the Pilgrim Nuclear Power Station L-20-092, Email Pilgrim Nuclear Power Station-Exemption from Annual Force-On-Force Exercise Requirements of 10 CFR Part 73, Appendix B,2020-12-10010 December 2020 Email Pilgrim Nuclear Power Station-Exemption from Annual Force-On-Force Exercise Requirements of 10 CFR Part 73, Appendix B, L-20-096, Supplemental Information to Support Physical Security Plan Revision and License Amendment Request to Incorporate Alternate Measures - Holtec Email Dated December 10, 20102020-12-10010 December 2020 Supplemental Information to Support Physical Security Plan Revision and License Amendment Request to Incorporate Alternate Measures - Holtec Email Dated December 10, 2010 ML20328A2982020-11-16016 November 2020 Response from Commonwealth of Massachusetts on No Significant Hazard for Pilgrim ISFSI Amendment to Address ISFSI II Dated November 16, 2020 ML20297A2372020-10-22022 October 2020 Request for Additional Information - HDI Fleet Decommissioning Quality Assurance Program ML20266G4032020-09-22022 September 2020 Acceptance Review Email - Request for Approval of HDI Fleet Decommissioning Quality Assurance Program, Revision 0 ML20163A6802020-06-11011 June 2020 Confirmation of the Scope of the Requested Regulatory Relief for Pilgrim Security Qualifications ML20280A1912020-04-17017 April 2020 Request for Additional Information- Clarifying Information for Pilgrim ISFSI Physical Security Amendment Application ML20269A3542020-03-0505 March 2020 CFR 26.717 Reports 2019 Transmittal Email ML19336A0302019-11-27027 November 2019 OEDO-15-00479 - Re 2.206 Petition Regarding Pilgrim Nuclear Power Station'S Current Licensing Basis for Flooding ML19336A0332019-11-26026 November 2019 OEDO-15-00479 - E-mail to Petitioner - 2.206 Petition Regarding Pilgrim Nuclear Power Station'S Current Licensing Basis for Flooding (CAC No. MF6460; EPID L-2015-CRS-0002)- Issuance of Final Director'S Decision ML19331A1952019-11-21021 November 2019 NRR E-mail Capture - (External_Sender) Pilgrim Nuclear Power Station - Commonwealth Consultation Response - Amendment Regarding Site Emergency Plan and Emergency Action Level Scheme ML19331A1732019-11-12012 November 2019 NRR E-mail Capture - Pilgrim Nuclear Power Station -Consult with Commonwealth - Amendment Regarding Cyber Security Plan ML19331A1642019-11-0505 November 2019 NRR E-mail Capture - Pilgrim Nuclear Power Station -Consult with Commonwealth - Amendment Regarding Site Emergency Plan and Emergency Action Level Scheme ML19331A1792019-11-0505 November 2019 NRR E-mail Capture - Pilgrim Nuclear Power Station - EA and Fonsi for Pilgrim Emergency Planning Exemption CY-19-007, LTR-19-0441 Henrietta Cosentino, E-mail SECY-19-0078 Request by Entergy Nuclear Operations Inc. for Exemptions from Certain Emergency Planning Requirements for the Pilgrim Nuclear Power Station2019-11-0404 November 2019 LTR-19-0441 Henrietta Cosentino, E-mail SECY-19-0078 Request by Entergy Nuclear Operations Inc. for Exemptions from Certain Emergency Planning Requirements for the Pilgrim Nuclear Power Station ML19275H1962019-09-24024 September 2019 NRR E-mail Capture - Pilgrim Nuclear Power Station - Consult with Commonwealth - Amendment Regarding Permanently Defueled Technical Specifications (PDTS) ML19239A0372019-08-26026 August 2019 E-mail from Entergy Dated August 26, 2019, Notification of Pilgrim License Transfer ML19239A0262019-08-23023 August 2019 LTR-19-0330 Janet Azarovitz, E-mail a Plea for More Time and Reasonable Discussion Including the Citizens of the Commonwealth in the Sale of the Pilgrim Nuclear Power Station ML19234A2072019-08-20020 August 2019 LTR-19-0328 Lawrence Delafield, President, Six Ponds Improv Assoc., Plymouth, Ma, Ltr Requests NRC to Postpone Consideration of Transferring the Licenses for the Pilgrim Nuclear Power Until the NRC Has Answered Concerns by Pilgrim Watch, Se ML19232A4032019-08-20020 August 2019 LTR-19-0322 Diane Turco, Director, Cape Downwinders, Massachusetts, Letter/E-mail Requests Suspension of the Pilgrim License Transfer from Entergy to Holtec Until the Adjudicatory Hearing Is Held and Raised Contentions Are Resolved ML19308A9942019-08-19019 August 2019 Entergy Nuclear Operations, Inc. Confirmatory Order Rescission Supplemental Information ML19226A3912019-08-14014 August 2019 NRR E-mail Capture - Pilgrim Nuclear Power Station - EA and Fonsi for Pilgrim Decommissioning Trust Fund Exemption (Holtec) ML19226A3962019-08-14014 August 2019 NRR E-mail Capture - Pilgrim Nuclear Power Station -Consult with Commonwealth - Conforming Amendment in Support of Pilgrim License Transfer Application ML19226A1212019-08-13013 August 2019 OEDO-15-00479-2.206 Petition Regarding Pilgrim Nuclear Power Station'S Current Licensing Basis for Flooding - Status (CAC No. MF6460; EPID L-2015-CRS-0002) ML19227A1032019-08-0707 August 2019 NRR E-mail Capture - Pilgrim Nuclear Power Station - Draft Wording for Potential Condition of License Transfer Order ML19207B3662019-07-26026 July 2019 NRR E-mail Capture - Pilgrim - RAI Direct and Indirect Transfer of Lic.; Conforming Lic. Amend.; Req. for Exemption 10 CFR 50.82(A)(8)(I)(A) for Holtec Decom. International, Llc ML19176A3452019-06-25025 June 2019 2.206 Petition Regarding Pilgrim Nuclear Power Station'S Current Licensing Basis for Flooding - Information (OEDO-15-00479) (CAC No. MF6460; EPID L-2015-CRS-0002) ML19154A0652019-06-0303 June 2019 NRR E-mail Capture - Pilgrim - Permanent Cessation of Power Operations ML19154A5242019-06-0303 June 2019 NRR E-mail Capture - RAI - Pilgrim Post-Decommissioning Technical Specifications (PDTS) License Amendment Request (LAR) ML19161A2122019-05-20020 May 2019 NRR E-mail Capture - Pilgrim Nuclear Power Station - Acceptance of License Amendment Request to Remove Cyber Security Plan Requirements ML19123A0332019-05-0101 May 2019 NRR E-mail Capture - Logbook Entry: 05/01/2019 Endangered Species Report Regarding a Confirmed Sighting of North Atlantic Right Whale(S) (Balaena Glacialis) ML19122A4912019-04-29029 April 2019 NRR E-mail Capture - Logbook Entry: 04/29/2019 Regarding the Confirmed Sighting of Ten North Atlantic Right Whales (Balaena Glacialis) ML19108A2372019-04-18018 April 2019 NRR E-mail Capture - Pilgrim Nuclear Power Station - Acceptance of Requested Licensing Action, Proposed Exemptions from 10 CFR 50.54(w)(1) - On-Site Property Damage Insurance ML19108A2362019-04-18018 April 2019 NRR E-mail Capture - Pilgrim Nuclear Power Station - Acceptance of Requested Licensing Action, Proposed Exemptions from 10 CFR 140.11(a)(4) - Primary and Secondary Liability Insurance 2022-09-26
[Table view] |
Text
IFKent Howard - Fwd: Response to your question regarding Radwaste Piping Page l
ý4 PA--
From: Ram Subbaratnam To: bford@entergy.com Date: 7/10/2006 2:51:46 PM
Subject:
Fwd: Response to your question regarding Radwaste Piping Some of "Your Own" rationale for why Radwaste system should be included in the scope of renewal space is as follows:
Ram Subbaratnam PM Pilgrim LRA US NRC, (301) 415 1478
>>> Kim Green <kim@islinc.com> 07/06/2006 11:49 AM >>>
Devender, In response to your question regarding whether radwaste piping is in scope, ISL provides the following answer and supporting information:
Pilgrim UFSAR Section 9.2.4.3.2 states:
"The Miscellaneous Waste System processes and strains these liquid wastes before discharge through the radwaste discharge header into the circulating water discharge canal or batched to floor drain to process as chemical waste. The liquid wastes are sampled and analyzed before release and continually monitored during release."
Pilgrim UFSAR Section 9.2.4.3.3 also states:
"The wastes are pumped through a strainer and discharged at a controlled rate through the liquid radwaste discharge header into the circulating water discharge canal or batched to floor drain to process as chemical waste. The miscellaneous waste is continuously monitored for activity as it passes through the radwaste discharge header.
If neccessary, miscellaneous wastes of high radioactivity concentrations and low detergent levels may be transferred to the chemical waste receiver tank for further processing."
Pilgrim LRA Section 2.3.3.14 and Table 2.3.3.14-A indicate that the radwaste system is in scope for the purposes of 10 CFR 54.4(a)(2) for spatial interaction.
Page 2.3-65 of the Pilgrim LRA states:
>Unless specifically excluded, all nonsafety-related components in a system
>determined to be in
>scope for 54.4(a)(2) for spatial interaction are subject to AMR.
>Components are excluded from
>review if their location is such that safety-related equipment cannot be
>impacted by component
>failure. Specific areas and components excluded for spatial interaction
>are listed in
>Table 2.3.3.14-B.
The radwaste system or any portion thereof is NOT listed in LRA Table
IfKent- HN)-w-a-rd - Fwd:_ Response to you11 rIIquestion regarding Radwaste Piping Page 2 fl if etHwr w:Rsos oyu usinrgrigRdat Piin Pag 2 2.3.3.14-B. Therefore, it is ISL's determination that the radwaste discharge piping of concern is in scope and subject to an AMR.
Furthermore, Pilgrim LRA Section 2.4.5, Yard Structures, indicates that the discharge structure is in scope.
"The purpose of the discharge structure is to provide a flow path from the circulating water system and the salt service water system back to the bay. The discharge structure is located near the shoreline, northwest of the intake structure.
The structure is classified as nonsafety-related and is not a seismic Class I structure.
The discharge structure is part of the salt service water system flow path to the ultimate heat sink."
Remaining yard structures have the following intended functions for 10 CFR 54.4(a)(1), (a)(2),
and (a)(3).
e Provide support, shelter and protection for safety-related equipment and nonsafetyrelated equipment within the scope of license renewal. Yard structures house and support equipment credited for station blackout (10 CFR 50.63) and for fire protection (10 CFR 50.48).
e Maintain integrity of the SSW discharge flow path (discharge structure and channel). The SSW system is credited for fire protection (10 CFR 50.48).
If you have any questions, or need further information or assistance regarding this matter, please call me at 301-255-2289, or Cliff Marks at 301-255-2264.
Hope this helps.
Kim
JJ-E\-temrý\G-Wý00 00 1 TM P ~&\temr~GW}OOOO . .Page .TMP. 111 Mail Envelope Properties (44B2A1C2.120: 19: 10294)
Subject:
Fwd: Response to your question regarding Radwaste Piping Creation Date 7/10/2006 2:51:46 PM From: Ram Subbaratnam Created By: RXS2@nrc.gov Recipients Action Date & Irime entergy.com bford (bford@entergy.com)
Post Office Delivered Route Pending en tergy.com Files Size Date & Time MESSAGE 5802 7/10/2006 2:51:46 PM Options Auto Delete: No Expiration Date: None Notify Recipients: Yes Priority: Standard ReplyRequested: No Return Notification: None Concealed
Subject:
No Security: Standard To Be Delivered: Immediate Status Tracking: Delivered & Opened