MONTHYEARML0603801012006-02-0909 February 2006 Request for Additional Information Response to Generic Letter 2004-02, Potential Impact of Debris Blockage on Emergency Recirculation During Design-Basis Accidents at Pressurized Water Reactors Project stage: RAI ML0620705242006-08-11011 August 2006 Approval of Generic Letter 2004-02 Extension Request Project stage: Other ML0729502752007-10-24024 October 2007 Draft Open Items from Staff Audit of Corrective Actions to Address Generic Letter 2004-02 Project stage: Draft Other LR-N07-0304, Request for Extension of Completion Dates for Corrective Actions Required by NRC Generic Letter 2004-02, Potential Impact of Debris Blockage on Emergency Recirculation During Design Basis Accidents at Pressurized-Water Reactors2007-12-10010 December 2007 Request for Extension of Completion Dates for Corrective Actions Required by NRC Generic Letter 2004-02, Potential Impact of Debris Blockage on Emergency Recirculation During Design Basis Accidents at Pressurized-Water Reactors Project stage: Request LR-N08-0043, Supplemental Response to NRC Generic Letter 2004-02, Potential Impact of Debris Blockage on Emergency Recirculation During Design Basis Accidents at Pressurized-Water Reactors.2008-02-29029 February 2008 Supplemental Response to NRC Generic Letter 2004-02, Potential Impact of Debris Blockage on Emergency Recirculation During Design Basis Accidents at Pressurized-Water Reactors. Project stage: Request LR-N08-0139, Request for Extension to Complete Generic Letter 2004-02 Testing2008-06-26026 June 2008 Request for Extension to Complete Generic Letter 2004-02 Testing Project stage: Request ML0818305512008-06-30030 June 2008 Draft Request for Additional Information, Generic Letter 2004-02, Potential Impact of Debris Blockage on Emergency Recirculation During Design Basis Accidents at Pressurized-Water Reactors Project stage: Draft RAI ML0820400132008-07-31031 July 2008 Approval of Request for Extension of Completion Date for Generic Letter 2004-02 Corrective Actions Project stage: Other ML0821705062008-08-12012 August 2008 Report on Results of Staff Audit of Corrective Actions to Address Generic Letter 2004-02 Project stage: Acceptance Review ML0833000792008-12-17017 December 2008 Request for Additional Information Regarding Generic Letter 2004-02 Project stage: RAI LR-N09-0072, Updated Supplemental Response to NRC Generic Letter 2004-02, Potential Impact of Debris Blockage on Emergency Recirculation During Design Basis Accidents at Pressurized-Water Reactors2009-03-31031 March 2009 Updated Supplemental Response to NRC Generic Letter 2004-02, Potential Impact of Debris Blockage on Emergency Recirculation During Design Basis Accidents at Pressurized-Water Reactors Project stage: Request ML0933802422009-12-0404 December 2009 Draft Request for Additional Information Project stage: Draft RAI ML1002205202010-02-0404 February 2010 Request for Additional Information Regarding Generic Letter 2004-02 Project stage: RAI ML1003411882010-02-17017 February 2010 Notice of Forthcoming Meeting with PSEG Nuclear LLC (PSEG) Regarding Response to Generic Letter 2004-02 for Salem Nuclear Generating Station, Unit Nos. 1 and 2 Project stage: Request ML1007704112010-04-0707 April 2010 Summary of Meeting with PSEG Nuclear LLC, Regarding Response to Generic Letter 2004-02 for Salem Nuclear Generating Station, Unit Nos. 1 and 2 Project stage: Meeting ML1015401372010-05-27027 May 2010 Draft Salem, Units 1 and 2, Updated Supplemental Response to Generic Letter 2004-02 ML1015405252010-06-0808 June 2010 Notice of Meeting with PSEG Nuclear LLC, Regarding Response to Generic Letter 2004-02 for Salem Nuclear Generating Station, Units 1 and 2 Project stage: Meeting ML1018004772010-07-14014 July 2010 Summary of Category 1 Public Meeting with PSEG Nuclear LLC, Regarding Response to Generic Letter 2004-02 for Salem Nuclear Generating Station, Units 1 and 2 Project stage: Meeting ML14113A2022014-04-30030 April 2014 Closeout of Generic Letter, 2004-02, Potential Impact of Debris Blockage on Emergency Recirculation During Design Basis Accidents at Pressurized-Water Reactors (Tac Nos. MC4712 and MC4713) Project stage: Other 2008-08-12
[Table View] |
Similar Documents at Salem |
---|
Category:Meeting Summary
MONTHYEARML24239A8402024-08-28028 August 2024 Summary of August 20, 2024, Pre-Planning Public Meeting with PSEG Nuclear LLC to Discuss Future Amendments in Support of Stretch Power Uprate ML24155A1992024-06-0303 June 2024 Annual Assessment Meeting for Pa/Md/Ny/Nj Nuclear Power Plants - NRC Meeting Summary ML23276A6242023-10-12012 October 2023 Summary of the Closed Meeting with PSEG Nuclear LLC and Westinghouse Electric Company to Discuss Cobalt-60 Production at Salem Nuclear Generating Station ML23179A0012023-06-28028 June 2023 6/7/2023 - Annual Assessment Meeting for Pa/Md/Ny/Nj Nuclear Power Plants - Meeting Summary ML23146A1012023-05-31031 May 2023 Summary of May 25, 2023, Pre-Submittal Public Meeting with PSEG Nuclear LLC to Discuss Reduction of the Site'S Exclusion Area Boundary ML22187A1462022-07-0606 July 2022 Joint Annual Assessment Meeting for Pa/Md/Nj/Ny Nuclear Power Plants - Meeting Summary ML22153A4492022-06-14014 June 2022 Summary of Pre-Submittal Public Meeting with PSEG Nuclear LLC to Extend Emergency Diesel Generator Allowed Outage Time ML21201A0702021-08-0505 August 2021 Summary of July 20, 2021, Meeting with the National Marine Fisheries Service Regarding Incidental Take of Kemps Ridley Sea Turtles at Salem Nuclear Generating Station, Units 1 and 2 ML21064A0962021-03-0909 March 2021 Summary of 3/4/2021 Pre-Submittal Public Meeting with PSEG Nuclear LLC to Discuss Adoption of ASME Section XI Code Cases N-878, N-879, and N-880 at Hope Creek Generating Station and Salem Nuclear Generating Station ML20204A8422020-07-28028 July 2020 Summary of July 20, 2020, Pre-Submittal Public Meeting with PSEG Nuclear LLC to Discuss Proposed Relief Request for Pressurizer Weld Interval Extension ML20125A1652020-05-0404 May 2020 Summary of April 23, 2020, Teleconference with NMFS Regarding Incidental Take of Atlantic Sturgeon at Salem Nuclear Generating Station ML20113F0892020-04-27027 April 2020 Summary of April 15, 2020, Pre-Submittal Meeting with PSEG Nuclear LLC to Discuss Proposed License Amendment on Leak Before Break Analyses ML20108F0652020-04-17017 April 2020 Summary of April 15, 2020, Teleconference with PSEG Nuclear, LLC Regarding Incidental Take of Atlantic Sturgeon at Salem ML19109A1282019-04-16016 April 2019 and Hope Creek Generating Station: Summary of Public Webinar Meeting on April 10, 2019 ML18156A4242018-06-0505 June 2018 Annual Assessment Meeting, 5/30/18 Meeting Summary ML18044A9942018-02-26026 February 2018 Summary of Meeting with PSEG Nuclear LLC Regarding Planned Submittal of License Amendment Request to Revise Technical Specifications Regarding Extending the Allowed Outage Time for the Inverters ML17332A6032017-12-0404 December 2017 Summary of October 27, 2017, Conference Call with PSEG Nuclear LLC Fall 2017 Steam Generator Inspections ML17206A0282017-08-0707 August 2017 Summary of 7/19/17 Meeting with PSEG Planned Submittal of License Amendment Request to Revise Technical Specifications for Reactor Trip and Engineered Safety Feature Actuation System Instrumentation for Salem, Units 1 and 2 (CAC Nos. MF9900 ML17102A7772017-04-10010 April 2017 Summary of Annual Assessment Meeting with PSEG ML16347A3932017-01-0505 January 2017 Summary of Teleconference with PSEG Nuclear LLC Regarding Planned License Amendment Request Regarding Change to the Salem Nuclear Generating Station-Hope Creek Generating Station Emergency Action Levels (MF8875, MF8876, and MF8877) ML16123A1322016-05-17017 May 2016 Summary of Public Pre-Application Meeting Held on March 30, 2016, with PSEG LLC to Discuss License Amendment Request Containment Fan Coil Unit Allowed Outage Time at Salem Nuclear Generating Station, Unit Nos. 1 and 2 ML16096A2222016-04-0505 April 2016 March 30, 2016, Summary of Annual Assessment Meeting with PSEG - Salem Nuclear Generating Station & Hope Creek Generating Station ML16035A4802016-02-12012 February 2016 Jsc Meeting Summary Attachment ML15202A2432015-07-29029 July 2015 June 24, 2015, Summary of Pre-Submittal Meeting with PSEG Nuclear LLC on Upgrades and Maintenance to the Chilled Water System at Salem Nuclear Generating Station, Unit Nos. 1 and 2 ML15104A1492015-04-14014 April 2015 Hope, Summary of Annual Assessment Meeting with PSEG ML14167A1592014-09-0202 September 2014 Summary of Category 1 Public Meeting with Salem Nuclear Generating Station, Units 1 and 2 to Discuss Seismic Hazard Reevaluations Associated with Implementation of Japan Lessons-Learned Near-Term Task Force Recommendation 2.1 Seismic ML14100A0242014-04-10010 April 2014 Salem and Hope Creek - Summary of Annual Assessment Meeting with PSEG ML13109A2352013-05-10010 May 2013 Summary of Conference Call Regarding the Fall 2012 Steam Generator Tube Inspections at Salem Nuclear Generating Station, Unit No. 2 ML13099A3242013-04-0909 April 2013 Salem & Hope Creek - Summary of Annual Assessment Meeting with PSEG ML13078A4482013-04-0505 April 2013 Summary of February 28, 2013, Public Meeting with PSEG Final Supplemental Response to Generic Letter 2004-02 for Salem Nuclear Generating Station, Units 1 and 2 ML12144A3312012-05-23023 May 2012 Summary of Meeting at the PSEG to Discuss the Nrc'S Assessment of Pseg'S Safety Performance at Salem & Hope Creek for 2011 ML1129700652011-10-21021 October 2011 Summary of PSEG Drop-in Visit, 9-28-2011 and Slides ML1125200382011-09-19019 September 2011 Summary of, Meeting with PSEG Nuclear LLC to Discuss Proposed License Amendment Regarding Reactor Coolant System Activity for Salem Nuclear Generating Station, Unit Nos. 1 and 2 ML11139A3462011-05-26026 May 2011 Summary of Telephone Conference Call Held on May 10, 2011, Between the NRC and Nuclear, LLC, Concerning a Draft Response to a Draft RAI Pertaining to the Salem Nuclear Generating Station, Units 1 and 2, (Salem) License Renewal Application ML1114002132011-05-20020 May 2011 Summary of Annual Assessment Meeting for Salem and Hope Creek ML1107606042011-04-0505 April 2011 January 25, 2011, Summary of Telephone Conference Call Held Btw the USNRC and PSEG Nuclear, LLC, Concerning Information on Buried Piping Inspections at the Salem Nuclear Generating Station, Units 1 and 2, License Renewal Application ML1107007082011-04-0505 April 2011 February 17, 2011, Summary of Telephone Conference Call Held Between NRC and PSEG, Concerning Information on the Salem Nuclear Generating Station, Units 1 and 2, License Renewal Application ML1107608982011-04-0505 April 2011 January 12, 2011, Summary of Telephone Conference Call Held Between the U.S. Nuclear Regulatory Commission and PSEG Nuclear, Llx, Concerning Audit of the Westems Software Pertaining to the Salem Nuclear Generating Station, Units 1 and 2, LR ML1036307352011-02-0909 February 2011 Summary of Telephone Conference Call Held on September 16, 2010, Between the U.S. Nuclear Regulatory Commission and PSEG Nuclear LLC, Concerning Questions Pertaining to the Salem Nuclear Generating Station, Units 1 & 2, License Renewal App ML1035005662011-02-0909 February 2011 Summary of Telephone Conference Call Held on 11/18/10 Between the USNRC and PSEG Nuclear, LLC, Concerning Draft Response to the Salem Nuclear Generating Station, Units 1 and 2, Request for Additional Information, and Concerning NRC Open Ite ML1100501562011-01-26026 January 2011 Summary of Telephone Conference Call Held on September 27, 2010, Between the U.S. Nuclear Regulatory Commission and PSEG Nuclear, LLC, Concerning Questions Pertaining to the Salem Nuclear Generating Station, Units 1 and 2 ML1035606562011-01-26026 January 2011 12/13/10 Summary of Telephone Conference Call Held on 12/13/10 Btw the USNRC and PSEG Nuclear, LLC, Concerning Draft Requests for Additional Information Pertaining to the Salem Nuclear Generating Station, Units 1 and 2, License Renewal Appl ML1035401842011-01-0707 January 2011 10/08/10 Summary of Telephone Conference Call Held Btw the USNRC and PSEG Nuclear, LLC, Concerning Questions Pertaining to the Salem Nuclear Generating Station, Units 1 and 2, License Renewal Application ML1032102502010-12-13013 December 2010 10/22/10 Summary of Telephone Conference Call Held Btw the USNRC and PSEG Nuclear LLC Concerning Questions Pertaining to the Salem Nuclear Generating Station, Units 1 and 2, License Renewal Application ML1024600952010-10-14014 October 2010 Summary of Telephone Conference Call Held Between Us NRC and PSEG Nuclear, LLC Concerning Questions Pertaining to the Salem Nuclear Generation Station Units 1&2 LRA ML1026400612010-10-14014 October 2010 09/09/2010-Summary of Telephone Conference Call Between the USNRC and PSEG Nuclear, LLC, Concerning Questions Pertaining to the Salem Nuclear Generating Station, Units 1 and 2, License Renewal Application ML1023200572010-09-0303 September 2010 8/16/10 Summary of Telephone Conference Call Held Between the USNRC and PSEG Nuclear LLC Concerning a D-RAI Pertaining to the Salem Nuclear Generating Station, Units 1 and 2, License Renewal Application ML1022900442010-08-31031 August 2010 Summary of Conference Call Regarding Spring 2010 Steam Generator Tube Inspections at Salem Nuclear Generating Station, Unit No. 1 ML1022305122010-08-18018 August 2010 08/04/10 Summary of Telephone Conference Call Held on Between NRC and PSEG Nuclear, LLC, Concerning Drais Pertaining to the Salem Nuclear Generating Station, Units 1 and 2, License Renewal Application ML1022200122010-08-13013 August 2010 Summary of Telephone Conf Call Held on 7/29/10, Between the USNRC and PSEG Nuclear LLC, Concerning Follow-Up Questions Pertaining to the Salem Nuclear Generating Station, Units 1 & 2, and Hope Creek Generating Station License Renewal Enviro 2024-08-28
[Table view] |
Text
UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 July 14, 2010 LICENSEE: PSEG Nuclear LLC FACILITY: Salem Nuclear Generating Station, Units 1 and 2
SUBJECT:
SUMMARY
OF JUNE 23, 2010, MEETING WITH PSEG NUCLEAR LLC, REGARDING RESPONSE TO GENERIC LETTER 2004-02 FOR SALEM NUCLEAR GENERATING STATION, UNITS 1 AND 2 (TAC NOS. MC4712 AND MC4713)
On June 23, 2010, a Category 1 public meeting was held between the U.S. Nuclear Regulatory Commission (NRC) and representatives of PSEG Nuclear LLC (PSEG or the licensee) via conference call. This meeting was a follow-up to the public meeting that was held on March 16, 2010, concerning PSEG's response to Generic Letter (GL) 2004-02, "Potentiallmpact of Debris Blockage on Emergency Recirculation during Design Basis Accidents at Pressurized Water Reactors.Tor Salem Nuclear Generating Station, Units 1 and 2 (Salem). A list of conference call participants is provided in the Enclosure.
During the meeting on March 16, 2010, the NRC staff and the licensee discussed PSEG's planned approach to address the NRCs request for additional information (RAI) dated February 4, 2010 (Agencywide Documents Access and Management System (ADAMS)
Accession No. ML100220520), pertaining to the response to the GL for Salem. A summary of that meeting was issued by the NRC staff on April 7, 2010 (ADAMS Accession No.
ML100770397). At the conclusion of the March 16th meeting, it was decided that a follow-up public meeting would be held after PSEG provides a revised draft response to the GL. PSEG's revised draft response was provided to the NRC staff on May 27,2010 (ADAMS Accession No.
ML101540137). During the meeting on June 23, 2010, the NRC staff provided feedback to the licensee on the revised draft response to the GL. The following summarizes the discussion:
Chemical Effects The NRC staff stated that the solubility value shown on the top of page 272 of 273 of (384 parts per million (ppm)) of the revised draft response appears to be incorrect.
The staff has performed an independent calculation which resulted in a value of 12.7 ppm. The licensee stated that it would check the calculation. The staff stated that this issue would only need to be discussed again if the licensee retained the existing value or if the revised number doesn't support 160 F as a conservative estimate of the precipitation temperature.
Debris Characteristics The NRC staff and PSEG discussed the licensee's assumed size distribution for each type of debris as shown on page 25 of 273 of Attachment 1 of the revised draft response. The staff noted that the Salem size distributions for Kaowool and Owens-Corning insulation were not completely consistent with NRC staffs safety evaluation for Nuclear Energy Institute NEI 04-07,
'Pressurized Water Reactor Sump Performance Evaluation Methodology:' However, the staff
-2 concluded that the approach was acceptable for Salem due to the small amounts of these types of insulation relative to the amount of Nukon insulation.
Debris Transport During discussion regarding debris transport, the licensee stated that the distribution of small pieces between the front and back sides of the strainer is based on the assumption that 25% of the small debris is held up on the grating during blowdown. The NRC staff recommended that the licensee revise Section 3e.1.1, "Slowdown Transport," of Attachment 1 of the revised draft response (pages 39 - 40 of 273) to add this information. The licensee agreed to add this statement to the response.
The NRC staff and PSEG discussed the licensee's assumptions regarding the debris that is transported to inactive volumes as discussed on page 47 of 273 of Attachment 1 of the revised draft response. The staff requested that the licensee quantify and justify the credit being taken for debris sequestered in inactive volumes versus the amount transported to the screens. The staff added that if the amount of such debris assumed to be sequestered is a small fraction of the amount assumed to transport; this issue would likely be of low concern. The licensee estimated that this information would be provided in draft form to the staff by July 8, 2010 1 . The NRC staff stated that this issue needs to be discussed again before the licensee provides a final RAI response.
Net Positive Suction Head The NRC staff noted that the wording in the last paragraph of page 11 of 13 of Attachment 8 of the revised draft response (part of response to RAI 14(a)) appears inconsistent with the wording on page 178 of 273 of Attachment 1 of the revised draft response. The licensee stated that, contrary to the discussion in Attachment 8, Emergency Operating Procedure (EOP)
EOP-LOCA-5 does not require the operators to immediately stop the operating emergency core cooling system and containment spray pumps when the reactor water storage tank (RWST) low level setpoint is reached. The pumps are stopped on low-low level in the RWST. The licensee stated it would revise the draft response to RAI 14(a) to clarify the EOP procedure requirements.
1 PSEG provided the information regarding debris transport to inactive volumes to the NRC staff via e-mail on July 8, 2010.
-3 Members of the public were not in attendance. Public Meeting Feedback forms were not received.
Please direct any inquiries to me at 301-415-1420 or Rick.Ennis@nrc.gov.
Richard B. Ennis, Senior Project Manager Plant Licensing Branch 1-2 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket Nos. 50-272 and 50-311
Enclosure:
List of Conference Call Participants cc w/encl: Distribution via Listserv
LIST OF CONFERENCE CALL PARTICIPANTS JUNE 23,2010, MEETING WITH PSEG RESPONSE TO GENERIC LETTER 2004-02 FOR SALEM NUCLEAR GENERATING STATION, UNITS 1 AND 2 Name Title Organization Rick Ennis Sr. Project Manager NRC/NRR/DORL Mike Scott Branch Chief NRC/NRR/DSS/SSIB John Lehning Reactor Systems Engineer NRC/NRR/DSS/SSIB Paul Klein Sr. Materials Engineer NRC/NRR/DCI/CSGB Matt Yoder Sr. Chemical Engineer I\JRC/NRR/DCI/CSGB Jeff Keenan Manager Licensing PSEG Nuclear LLC Bob Peterson Senior Manager Sargent & Lundy Helmut Kopke Project Associate Sargent & Lundy Kiran Mathur Senior Engineer PSEG Nuclear LLC Paul Duke Licensing Engineer PSEG Nuclear LLC Elliott Rosenfeld Nuclear Engineer New Jersey DEP Enclosure
Package: ML101800485 Meeting Notice: ML101540525 t' S ummary: ML101800477 Meelng OFFICE LPL 1-2/PM LPL 1-1/LA SSIB/BC LPL 1-2/BC NAME REnnis SLittie MScott HChernoff DATE 7/13/10 7/12/10 7/13/10 7/14/10