MONTHYEARLR-N05-0401, Response to Generic Letter 2004-02 Potential Impact of Debris Blockage on Emergency Recirculation During Design Basis Accidents at Pressurized-Water Reactors2005-09-0101 September 2005 Response to Generic Letter 2004-02 Potential Impact of Debris Blockage on Emergency Recirculation During Design Basis Accidents at Pressurized-Water Reactors Project stage: Request ML0603801012006-02-0909 February 2006 Request for Additional Information Response to Generic Letter 2004-02, Potential Impact of Debris Blockage on Emergency Recirculation During Design-Basis Accidents at Pressurized Water Reactors Project stage: RAI ML0620705242006-08-11011 August 2006 Approval of Generic Letter 2004-02 Extension Request Project stage: Other ML0729502752007-10-24024 October 2007 Draft Open Items from Staff Audit of Corrective Actions to Address Generic Letter 2004-02 Project stage: Draft Other ML0735312612007-12-10010 December 2007 Request for Extension of Completion Dates for Corrective Actions Required by NRC Generic Letter 2004-02, Potential Impact of Debris Blockage on Emergency Recirculation During Design Basis Accidents at Pressurized-Water Reactors Project stage: Request LR-N07-0304, Request for Extension of Completion Dates for Corrective Actions Required by NRC Generic Letter 2004-02, Potential Impact of Debris Blockage on Emergency Recirculation During Design Basis Accidents at Pressurized-Water Reactors2007-12-10010 December 2007 Request for Extension of Completion Dates for Corrective Actions Required by NRC Generic Letter 2004-02, Potential Impact of Debris Blockage on Emergency Recirculation During Design Basis Accidents at Pressurized-Water Reactors Project stage: Request ML0808004692008-02-29029 February 2008 Supplemental Response to NRC Generic Letter 2004-02, Potential Impact of Debris Blockage on Emergency Recirculation During Design Basis Accidents at Pressurized-Water Reactors Project stage: Request ML0819101522008-06-26026 June 2008 Request for Extension to Complete Generic Letter 2004-02 Testing Project stage: Request LR-N08-0139, Request for Extension to Complete Generic Letter 2004-02 Testing2008-06-26026 June 2008 Request for Extension to Complete Generic Letter 2004-02 Testing Project stage: Request ML0818305512008-06-30030 June 2008 Draft Request for Additional Information, Generic Letter 2004-02, Potential Impact of Debris Blockage on Emergency Recirculation During Design Basis Accidents at Pressurized-Water Reactors Project stage: Draft RAI LR-N08-0160, Response to NRC Request for Information Regarding Request for Extension to Complete Generic Letter 2004-02 Testing2008-07-10010 July 2008 Response to NRC Request for Information Regarding Request for Extension to Complete Generic Letter 2004-02 Testing Project stage: Request ML0820400132008-07-31031 July 2008 Approval of Request for Extension of Completion Date for Generic Letter 2004-02 Corrective Actions Project stage: Other ML0821705062008-08-12012 August 2008 Report on Results of Staff Audit of Corrective Actions to Address Generic Letter 2004-02 Project stage: Other ML0833000792008-12-17017 December 2008 Request for Additional Information Regarding Generic Letter 2004-02 Project stage: RAI ML0910005572009-03-31031 March 2009 Updated Supplemental Response to NRC Generic Letter 2004-02, Potential Impact of Debris Blockage on Emergency Recirculation During Design Basis Accidents at Pressurized-Water Reactors Project stage: Request ML0933802422009-12-0404 December 2009 Draft Request for Additional Information Project stage: Draft RAI ML1002205202010-02-0404 February 2010 Request for Additional Information Regarding Generic Letter 2004-02 Project stage: RAI ML1003411882010-02-17017 February 2010 Notice of Forthcoming Meeting with PSEG Nuclear LLC (PSEG) Regarding Response to Generic Letter 2004-02 for Salem Nuclear Generating Station, Unit Nos. 1 and 2 Project stage: Request ML1007704112010-04-0707 April 2010 Summary of Meeting with PSEG Nuclear LLC, Regarding Response to Generic Letter 2004-02 for Salem Nuclear Generating Station, Unit Nos. 1 and 2 Project stage: Meeting ML1015401372010-05-27027 May 2010 Draft Salem, Units 1 and 2, Updated Supplemental Response to Generic Letter 2004-02 ML1015405252010-06-0808 June 2010 Notice of Meeting with PSEG Nuclear LLC, Regarding Response to Generic Letter 2004-02 for Salem Nuclear Generating Station, Units 1 and 2 Project stage: Meeting ML1018004772010-07-14014 July 2010 Summary of Category 1 Public Meeting with PSEG Nuclear LLC, Regarding Response to Generic Letter 2004-02 for Salem Nuclear Generating Station, Units 1 and 2 Project stage: Meeting ML12129A3892012-04-27027 April 2012 Attachment 1 to LR-N12-0124, Generic Letter 2004-02, Updated Supplemental Response for Salem Regarding Generic Letter 2004-02 Project stage: Request ML12129A3902012-04-27027 April 2012 Attachments 1 Through Attachment 8, Response to Generic Letter 2004-02 Project stage: Request ML12129A3882012-04-27027 April 2012 Final Supplemental Response to Generic Letter 2004-02 Project stage: Request ML12366A2952012-11-0808 November 2012 Bypass Test Fiber Debris Preparation Method Comparison 11/8/2012_NRC Project stage: Request ML12366A2972012-11-0808 November 2012 Bypass Testing Information Project stage: Request ML12338A3802012-12-0303 December 2012 E-mail - Questions Regarding Salem Bypass Testing for PSEG (GL 2004-02) Project stage: Other ML12338A3832012-12-0303 December 2012 Questions on Salem Bypass Testing R1 Clean Project stage: Other ML13010A3252013-01-30030 January 2013 Summary of Public Conference Call with PSEG: Final Supplemental Response to Generic Letter 2004-02 Project stage: Other ML14113A2022014-04-30030 April 2014 Closeout of Generic Letter, 2004-02, Potential Impact of Debris Blockage on Emergency Recirculation During Design Basis Accidents at Pressurized-Water Reactors (Tac Nos. MC4712 and MC4713) Project stage: Other 2009-12-04
[Table View] |
Similar Documents at Salem |
|---|
|
Text
June 30, 2008 MEMORANDUM TO:
Harold K. Chernoff, Chief Plant Licensing Branch I-2 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation FROM:
Richard B. Ennis, Senior Project Manager /ra/
Plant Licensing Branch I-2 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation
SUBJECT:
SALEM NUCLEAR GENERATING STATION, UNIT NOS. 1 AND 2, DRAFT REQUEST FOR ADDITIONAL INFORMATION (TAC NOS. MC4712 AND MC4713)
The attached draft request for information (RAI) was transmitted on June 30, 2008, to Mr. Jeff Keenan of PSEG Nuclear LLC (PSEG or the licensee). This information was transmitted as follow-up to a conference call held between the Nuclear Regulatory Commission and PSEG on June 30, 2008, regarding the licensees letter dated June 26, 2008, which requested an extension to complete certain corrective actions associated with Generic Letter (GL) 2004-02, Potential Impact of Debris Blockage on Emergency Recirculation During Design Basis Accidents at Pressurized-Water Reactors, for Salem Nuclear Generating Station, Unit Nos. 1 and 2.
This memorandum and the attachment do not convey or represent an NRC staff position regarding the licensees request.
Docket Nos. 50-272 and 50-311
Attachment:
Draft RAI
June 30, 2008 MEMORANDUM TO:
Harold K. Chernoff, Chief Plant Licensing Branch I-2 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation FROM:
Richard B. Ennis, Senior Project Manager /ra/
Plant Licensing Branch I-2 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation FROM:
Richard B. Ennis, Senior Project Manager Plant Licensing Branch I-2 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation
SUBJECT:
SALEM NUCLEAR GENERATING STATION, UNIT NOS. 1 AND 2, DRAFT REQUEST FOR ADDITIONAL INFORMATION (TAC NOS. MC4712 AND MC4713)
The attached draft request for information (RAI) was transmitted on June 30, 2008, to Mr. Jeff Keenan of PSEG Nuclear LLC (PSEG or the licensee). This information was transmitted as follow-up to a conference call held between the Nuclear Regulatory Commission and PSEG on June 30, 2008, regarding the licensees letter dated June 26, 2008, which requested an extension to complete certain corrective actions associated with Generic Letter (GL) 2004-02, Potential Impact of Debris Blockage on Emergency Recirculation During Design Basis Accidents at Pressurized-Water Reactors, for Salem Nuclear Generating Station, Unit Nos. 1 and 2.
This memorandum and the attachment do not convey or represent an NRC staff position regarding the licensee's request.
Docket Nos. 50-272 and 50-311
Attachment:
Draft RAI DISTRIBUTION PUBLIC SSmith, NRR/SSIB PKlein, NRR/CSGB PDI-2 Reading RArchitzel, NRR/SSIB MYoder, NRR/CSGB RidsNrrDorlDpr JLehning, NRR/SSIB MScott, NRR/SSIB RidsNrrDorlLpl1-2 LWhitney, NRR/SSIB LDoerflein, Region I RidsNrrPMREnnis RTorres, NRR/SSIB ABurritt, Region I ACCESSION NO.: ML081830551 OFFICE PDI-2/PM NAME REnnis DATE 6/30/08 OFFICIAL RECORD COPY
DRAFT REQUEST FOR ADDITIONAL INFORMATION REGARDING REQUEST FOR EXTENSION RELATED TO GENERIC LETTER 2004-02 CORRECTIVE ACTIONS SALEM NUCLEAR GENERATING STATION, UNIT NOS. 1 AND 2 DOCKET NOS. 50-272 AND 50-311 By letter dated June 26, 2008, PSEG Nuclear LLC (PSEG or the licensee) requested an extension to complete corrective actions associated with Nuclear Regulatory Commission (NRC)
Generic Letter (GL) 2004-02, Potential Impact of Debris Blockage on Emergency Recirculation During Design Basis Accidents at Pressurized-Water Reactors, for Salem Nuclear Generating Station (Salem), Unit Nos. 1 and 2. Specifically, PSEG requested an extension to December 31, 2008, for completion of the corrective actions and an additional 90 days to provide an updated GL 2004-02 submittal to the NRC (i.e., prior to March 31, 2009). The NRC had previously approved an extension for Salem from the GL 2004-02 due date of December 31, 2007, until June 30, 2008, via NRC letter dated December 21, 2007.
As discussed in a conference call between the NRC staff and PSEG on June 30, 2008, the staff requests that the following additional information be provided to support the extension request.
- 1)
Please provide details of contingency actions (analyses or modifications) that PSEG will take to ensure that testing completed in the requested extension window will ensure issues associated with GL 2004-02 are fully addressed and that actions required to place the plant within the conditions bounded by the testing will occur by a certain date given the test results. This may involve the need for an additional extension request. There should be confidence that all contingency actions, if needed, will be completed no later than the end of 2009.
- 2)
Please provide the available net positive suction head margin for each unit for the limiting emergency core cooling system (ECCS) alignment (one or two pump operation), and the total head losses associated with the clean strainer and debris, based on testing and analysis that has been completed to date. The NRC staff understands that there may be two conditions, one for non-chemical debris with hotter sump fluid early in the event and one with chemical debris added and cooler sump fluid later in the event. In addition, the staff understands that the limiting ECCS alignment may change based on the total strainer head loss (i.e., the limiting ECCS alignment may be different between the chemically laden debris bed and non-chemically laden debris bed).