MONTHYEARML0627006442006-10-20020 October 2006 Summary of Meeting with Omaha Public Power District (OPPD) to Discuss OPPD Participation in the Water Management Strategies Program Project stage: Meeting ML0809404512008-04-18018 April 2008 Summary of 12/6/2006 Meeting with Omaha Public Power District, Regarding Water Management Strategies for Resolution of GSI-191 (Tac No MD5780) Project stage: Meeting 2006-10-20
[Table View] |
|
---|
Category:Meeting Summary
MONTHYEARML19071A0302019-03-13013 March 2019 Summary of Public Meeting to Describe Requests Omaha Public Power District for Partial Site Release from NRC Control of the Fort Calhoun Station ML19070A3072018-11-28028 November 2018 FCS Partial Site Release Meeting Summary ML17167A2622017-06-27027 June 2017 Summary of 5/31/2017 Meeting at Double Tree Hotel, Omaha, Ne, to Discuss and Accept Comments Regarding the Fort Calhoun Station Post-Shutdown Decommissioning Activities Report ML16298A2912016-10-27027 October 2016 Summary of Presubmittal Teleconference with Omaha Public Power District to Discuss Decommissioning Licensing Actions for Fort Calhoun Station, Unit No. 1 ML16259A1132016-09-20020 September 2016 9/13/16 Summary of Presubmittal Teleconference with Omaha Public Power District to Discuss License Amendment Request for Use of a Different Methodology for Evaluating Certain Class 1 Structures at Fort Calhoun, Unit 1 ML16036A3502016-02-23023 February 2016 2/3/16 Summary of Teleconference Meeting with Omaha Public Power District to Discuss Proposed Request to Revise Table S-2, Plant Modifications Committed, for the NFPA 805 Amendment Issued 6/16/14 for Fort Calhoun Station, Unit 1 ML15114A3782015-05-0707 May 2015 4/23/15 Summary of Pre-application Meeting with Omaha Public Power District, Proposed License Amendment Requests to (1) Reclassify Systems Based on ANSI 58.14 and (2) Adopt American Concrete Institute Code ACI-318 (1971) for Fort Calhoun St ML15105A4702015-04-15015 April 2015 Summary of Category 1 Meeting Between NRC and Omaha Public Power District to Discuss Transition to the Normal Reactor Oversight Process and Actions for Continued Sustained Performance Improvements ML14344A0872014-12-19019 December 2014 12/2/2014 Summary of Meeting with Omaha Public Power District to Discuss Containment Internal Structures at Fort Calhoun Station, Unit 1 ML14230A0802014-08-21021 August 2014 Memorandum to File, Verbal Granting of Relief Request RR-14, Proposed Alternative for Temporary Acceptance of a Pin Hole Leak in Raw Water System 20-Inch Elbow Located in Room 19 of Auxiliary Building ML14175A5182014-08-11011 August 2014 Summary of Category 1 Public Meeting with Exelon to Discuss Seismic Hazard Reevaluations Associated with Implementation of Japan Lessons Learned Near-Term Task Force Recommendation 2.1, Seismic ML14192A9822014-08-0606 August 2014 Summary of Meeting with Omaha Public Power District to Discuss License Amendment to Revise TS 2.0.1, General Requirements, and TS 2.7, Electrical Systems, for Inoperable System, Subsystem, or Component Due to Inoperable Power Source ML14163A0022014-06-16016 June 2014 Summary of Audit Conducted March 5-9, 2012, Request to Adopt National Fire Protection Association (NFPA) 805, Performance-Based Standard for Fire Protection for LWR Electric Generating Plants ML14156A2832014-06-16016 June 2014 Summary of 5/22/2014 Meeting with Omaha Public Power District and Nebraska Public Power District to Discuss Flooding Hazard Evaluation Extension Requests for Fort Calhoun, Unit 1, and Cooper Nuclear Station ML14147A3592014-06-0909 June 2014 Summary of Meeting Between Army Corps of Engineers, NRC, Omaha Public Power District, and Nebraska Public Power District - Discuss Flooding Analysis Associated with Fort Calhoun, Unit 1 and Cooper Nuclear Station ML14139A3582014-06-0505 June 2014 5/9/2014 Summary of Meeting with Omaha Public Power District and Nebraska Public Power District to Discuss Flooding Hazard Evaluation Extension Requests for Fort Calhoun, Unit 1, and Cooper Nuclear Station ML14139A3442014-05-29029 May 2014 Summary of Closed Meeting Between Representatives of the Nuclear Regulatory Commission, Omaha Public Power District and Nebraska Public Power District to Discuss Flooding Analysis ML14143A2892014-05-23023 May 2014 May 13, 2014 Summary of Meeting with Omaha Public Power District Presented the Status of Inspection Manual Chapter 0350 Oversight Activities at Fort Calhoun Station ML14065A2532014-03-0505 March 2014 Summary of Category 1 Public Meeting with Omaha Public Power District to Discuss Status of Oversight Activities at Fort Calhoun Station ML14031A1622014-02-10010 February 2014 Summary of Meeting Between Army Corps of Engineers, NRC, Omaha Public Power District, and Nebraska Public Power District - Discuss Flooding Analysis Associated with Fort Calhoun, Unit 1 and Cooper Nuclear Station ML13339A7242013-12-0505 December 2013 Meeting Summary Slides ML13338A2992013-12-0202 December 2013 Summary of Public Meeting in Omaha, Ne ML13220A7792013-08-0808 August 2013 Summary of July 24, 2013 Meeting with Omaha Public Power District ML13134A1862013-06-0303 June 2013 4/22/2013 - Summary of Meeting with Omaha Public Power District - Potential License Amendment Requests for Fort Calhoun, Unit 1 Related to Flood Protection for Raw Water System, Tornado Missile Protection, Piping/Code Use, and Alternate Sei ML13144A7762013-05-24024 May 2013 Summary of Meeting with Omaha Public Power District on Preliminary Results of a Manual Chapter 0350 Team Inspection ML13114A8812013-04-25025 April 2013 4/22/2013 - Summary of Closed Meeting with Omaha Public Power District to Discuss Flooding Issues Associated with Fort Calhoun, Unit 1 ML13093A4732013-04-0303 April 2013 Summary of Meeting with Omaha Public Power District ML12366A0322013-01-25025 January 2013 Summary of Meeting with Omaha Public Power District to Discuss Containment Internal Structures Issues to Support Restart of Fort Calhoun Station, Unit 1 ML12338A1912012-12-0303 December 2012 Meeting Summary with Omaha Public Power District to Discuss Update of Issues and Oversight Activities at Fort Calhoun Station ML12269A2242012-09-25025 September 2012 Meeting Summary of with Omaha Public Power District ML12220A3772012-08-0303 August 2012 Summary of Meeting with Omaha Public Power District ML12104A2642012-04-13013 April 2012 4/4/12 Summary of Meeting with Omaha Public Power District, Fort Calhoun Station ML1204004582012-02-0909 February 2012 Summary of Meeting with Omaha Public Power District to Discuss Specifics of the Transition of Fort Calhoun Station to Regulatory Oversight Under the NRC Inspection Manual Chapter 0350 Process ML1122116172011-08-0505 August 2011 7/27/2011- Summary of Public Meeting with Omaha Public Power District to Discuss Post-Flooding Recovery Actions for Fort Calhoun Station ML1116801512011-07-11011 July 2011 5/26/11 Summary of Prelicensing Meeting with Omaha Public Power District to Discuss License Amendment Request to Adopt Risk-Informed National Fire Protection Association Standard NFPA 805 or Fort Calhoun Station, Unit 1 ML1116600272011-06-14014 June 2011 Summary of Meeting with Omaha Public Power District Regarding a Preliminary Substantial Finding ML1110204072011-05-17017 May 2011 Summary of 03/02/11 Closed Pre-Licensing Teleconference with Omaha Public Power District to Discuss Its Plans to Submit an Extended Power Uprate for Fort Calhoun Station and Issues Related to Control Rod Withdrawal at Power ML1111014372011-05-17017 May 2011 Summary of Pre-Licensing Meeting with Omaha Public Power District to Discuss Its Plans to Submit an Extended Power Uprate for Fort Calhoun Station and Issues Related to Equipment Environmental Qualification ML1110201362011-04-12012 April 2011 Summary of Public Meeting with Omaha Public Power District to Discuss the Fort Calhoun Station 2010 Performance ML1102600062011-02-0707 February 2011 Summary of 1/13/2011 Pre-Licensing Meeting with Omaha Public Power District to Discuss Fort Calhoun Station'S Extended Power Uprate, Spent Fuel Pool Criticality, and Proposed License Amendment Request Modeled After TSTF-493 ML1023802302010-08-26026 August 2010 Summary of Meeting with Omaha Public Power District Regarding a Preliminary Substantial Finding ML1021101372010-08-0606 August 2010 Summary of 7/16/2010 Conference Call with Licensee to Discuss the 10/14/2008 Response to Generic Letter 2008-01, Managing Gas Accumulation in Emergency Core Cooling, Decay Heat Removal, and Containment Spray Systems ML1019403012010-07-29029 July 2010 6/30/2010 Summary of Teleconference Meeting with Omaha Public Power District to Discuss NRC Staff Request for Additional Information Dated 2/12/2010 on Generic Letter 2004-02 for Fort Calhoun Station, Unit 1 ML1014606292010-05-26026 May 2010 Summary of Public Meeting with Omaha Public Power District on the Fort Calhoun Station 2009 Performance ML1006200722010-03-23023 March 2010 Summary of Category 1, Teleconference with Omaha Public Power District to Discuss NRC Staff Request for Additional Information on Generic Letter 2004-02 for Fort Calhoun Station, Unit 1 ML0931401772009-11-18018 November 2009 Summary of November 5, 2009, Category 1 Meeting with Omaha Public Power District to Discuss Plans for Extended Power Uprate License Amendment Request for Fort Calhoun Station, Unit 1 ML0916801382009-06-30030 June 2009 Summary of Conference Call Regarding Issues Related to the Cracking of Mitsubishi Heavy Industries Ltd.-Fabricated Replacement Steam Generators for San Onofre Nuclear Station, Unit 3 ML0912405962009-05-0404 May 2009 Meeting Summary, 2008 EOC Public Meeting with Omaha Public Power District on Fort Calhoun Station ML0903706432009-02-13013 February 2009 Summary of Meeting with Omaha Public Power District, to Discuss the Fort Calhoun Station'S Transition to National Fire Protection Association (NFPA) 805 ML0903704112009-02-13013 February 2009 Summary of Meeting with Omaha Public Power District to Discuss Oppd'S Plans to Submit an Extended Power Uprate Request for the Fort Calhoun Station, Unit 1 2019-03-13
[Table view] |
Text
October 20, 2006 LICENSEE: Omaha Public Power District FACILITY: Fort Calhoun Station, Unit No. 1
SUBJECT:
SUMMARY
OF SEPTEMBER 21, 2006, MEETING WITH OMAHA PUBLIC POWER DISTRICT (OPPD) (TAC NO. MC5780)
On September 21, 2006, the U.S. Nuclear Regulatory Commission (NRC) staff conducted a meeting with OPPD to discuss its participation in the Water Management Strategies program.
OPPD had recently requested, and the NRC staff had approved, an extension to the completion date of the Generic Safety Issue (GSI)-191 efforts. OPPD stated it will complete the actions stated in its request for the fall 2006 refueling outage. However, as the result of some of the chemical effects testing, OPPD is concerned as to whether it will be able to complete the analysis to finalize the final resolution of GSI-191 by the extension date. OPPD is looking at different water management strategies that would allow them to meet its commitment for completion of the GSI-191 effort by April 2008.
OPPD is evaluating two possible water management strategies to limit the load on the strainers:
(1) OPPD would change the start logic on the containment spray pumps (CSPs) to start on high containment pressure and low steam generator pressure and (2) OPPD would terminate CSPs at the start of recirculation. In both cases, OPPD proposes to provide core cooling using the high-presure safety injection pump(s) for recirculation. OPPD provided some preliminary results of the transport analysis assuming these water management strategies. The NRC noted that the transport fraction of low density fibers went from 100 percent to 0 percent. OPPD stated this was a result of the transport analysis for these scenarios. The NRC staff agreed the transport would be reduced but felt 0 percent was probably not a realistic number. OPPD agreed but again noted this was a calculated number and that the real number is somewhere between 0 percent and 100 percent. The NRC staff noted that other transport assumptions noted in the OPPD slides were also beyond those approved in the industry guidance report. The NRC staff did note that such a plant-specific approach was allowed but would require specific NRC review and approval.
OPPD provided some discussion on regulatory obstacles. In particular, OPPD discussed the possible effects on the dose consequences and the maximum containment pressure and temperature calculations due to the stoppage of containment spray. Alion provided a closed discussion on a proposed new method to estimate aerosol natural deposition inside the containment as related to the dose calculations. As an alternative, OPPD noted it is pursuing qualifying the containment recirculation system high efficiency particulate air (HEPA) filters to be able to apply credit in the dose calculations for mitigation of the radioactivity release inside the containment. OPPD stated that the preliminary results for not starting the CSPs during a loss-of-coolant accident are that the containment design pressure and temperature would not be exceeded. OPPD stated that if the containment recirculation system HEPA filters can be qualified, it believes the calculated doses will be within regulatory limits. The NRC staff noted that if OPPD wants to qualify the HEPA filters in an expeditious manner, it should not deviate from the American Society for Testing and Materials requirements.
OPPD stated that its goal is to complete the GSI-191 effort by April 2008. However, if it pursues one of the above strategies, OPPD would like to know if the NRC would consider an extension should the ramifications of the water management review result in a need to go beyond April 2008. OPPD notes that the water management strategies would possibly provide them the margin that would allow the use of a smaller strainer than the currently proposed strainer of 3,000 square feet. OPPD stated that it would like to pursue this option and has not started the scheduling pending the result of this meeting. OPPD noted that it understands that because of some of its unique design features, its water management strategies may not apply broadly to the industry. The NRC staff agreed but felt several of the OPPD issues are applicable to other plants seeking to do water management strategies. The NRC staff noted that while OPPDs approach appears to be reasonable, OPPD is proposing something quite complex and different from the rest of the industry. As such, the NRC staff will need to discuss it further internally.
The NRC staff stated it would keep OPPD informed of its discussions.
A list of attendees is enclosed. The OPPD and Alion non-proprietary presentation slides are available in the Agencywide Documents Access and Management System (ADAMS) under accession numbers ML062680528 and ML062700272, respectively.
The NRC staff thanked OPPD for the presentation.
Please direct any inquiries to me at 301-415-1445, or abw@nrc.gov.
/RA/
Alan B. Wang, Project Manager Plant Licensing Branch IV Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket No. 50-285
Enclosure:
List of Meeting Attendees cc w/encl: See next page
OPPD stated that its goal is to complete the GSI-191 effort by April 2008. However, if it pursues one of the above strategies, OPPD would like to know if the NRC would consider an extension should the ramifications of the water management review result in a need to go beyond April 2008. OPPD notes that the water management strategies would possibly provide them the margin that would allow the use of a smaller strainer than the currently proposed strainer of 3,000 square feet. OPPD stated that it would like to pursue this option and has not started the scheduling pending the result of this meeting. OPPD noted that it understands that because of some of its unique design features, its water management strategies may not apply broadly to the industry. The NRC staff agreed but felt several of the OPPD issues are applicable to other plants seeking to do water management strategies. The NRC staff noted that while OPPDs approach appears to be reasonable, OPPD is proposing something quite complex and different from the rest of the industry. As such, the NRC staff will need to discuss it further internally.
The NRC staff stated it would keep OPPD informed of its discussions.
A list of attendees is enclosed. The OPPD and Alion non-proprietary presentation slides are available in the Agencywide Documents Access and Management System (ADAMS) under accession numbers ML062680528 and ML062700272, respectively.
The NRC staff thanked OPPD for the presentation.
Please direct any inquiries to me at 301-415-1445, or abw@nrc.gov.
/RA/
Alan B. Wang, Project Manager Plant Licensing Branch IV Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket No. 50-285
Enclosure:
List of Meeting Attendees cc w/encl: See next page DISTRIBUTION:
PUBLIC MHart, DRA LPLIV Reading RArchitzel, DSS RidsNrrDorl (CHaney/CHolden) HWagage, DSS RidsNrrDorlLpl4 (DTerao) RJasinski, NRR RidsNrrPMAWang RidsNrrDssSsib RidsNrrLALFeizollahi RDennig, DSS RidsOgcRp TMartin, DSS RidsAcrsAcnwMailCenter RidsNrrDraAadb RidsRegion4MailCenter RidsNrrDorlDpr ACCESSION NO.: ML062700644 OFFICE NRR/LPL4/PM NRR/LPL4/LA NRR/LPL4/BC NAME AWang LFeizollahi DTerao DATE 10/20/06 10/20/06 10/20/06 OFFICIAL RECORD COPY
MEETING WITH OMAHA PUBLIC POWER DISTRICT (OPPD)
LIST OF ATTENDEES SEPTEMBER 21, 2006 NRC OPPD ALION Others T. Martin J. Gasper J. Bostleman D. Vincent A. Wang S. Baughn T. Heames G. Salamon R. Dennig T. Kendall R. Architzel F. Verbos M. Kotzalas J. Butler M. Hart H. Wagage
Ft. Calhoun Station, Unit 1 cc:
Winston & Strawn Mr. David J. Bannister, Manager ATTN: James R. Curtiss, Esq. Fort Calhoun Station 1700 K Street, N.W. Omaha Public Power District Washington, DC 20006-3817 Fort Calhoun Station FC-1-1 Plant P.O. Box 550 Chairman Fort Calhoun, NE 68023-0550 Washington County Board of Supervisors P.O. Box 466 Mr. Joe L. McManis Blair, NE 68008 Manager - Nuclear Licensing Omaha Public Power District Mr. John Hanna, Resident Inspector Fort Calhoun Station FC-2-4 Adm.
U.S. Nuclear Regulatory Commission P.O. Box 550 P.O. Box 310 Fort Calhoun, NE 68023-0550 Fort Calhoun, NE 68023 Mr. Daniel K. McGhee Regional Administrator, Region IV Bureau of Radiological Health U.S. Nuclear Regulatory Commission Iowa Department of Public Health 611 Ryan Plaza Drive, Suite 400 Lucas State Office Building, 5th Floor Arlington, TX 76011-4005 321 East 12th Street Des Moines, IA 50319 Ms. Julia Schmitt, Manager Radiation Control Program Mr. R. T. Ridenoure Nebraska Health & Human Services R & L Vice President - Chief Nuclear Officer Public Health Assurance Omaha Public Power District 301 Centennial Mall, South Fort Calhoun Station FC-2-4 Adm.
P.O. Box 95007 Post Office Box 550 Lincoln, NE 68509-5007 Fort Calhoun, Nebraska 68023-0550 April 2006