Summary of Meeting with Omaha Public Power District to Discuss OPPDs Plans to Submit an Extended Power Uprate Request for the Fort Calhoun Station, Unit 1
ML090370411
Person / Time
Site: Fort Calhoun Omaha Public Power District icon.png
Issue date: 02/13/2009
From: Lynnea Wilkins
Plant Licensing Branch IV
To:
Omaha Public Power District
Wilkins, L E, NRR/DORL/LPL4, 415-1377
Shared Package
ML090370404 List:
References
TAC ME0592
Download: ML090370411 (3)


Text

UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 February 13, 2009 LICENSEE:

Omaha Public Power District FACILITY:

Fort Calhoun Station, Unit NO.1 SUB..IECT:

SUMMARY

OF JANUARY 28, 2009, MEETING WITH OMAHA PUBLIC POWER DISTRICT ON PLANS TO SUBMIT AN EXTENDED POWER UPRATE APPLICATION (TAC NO. ME0592)

On January 28, 2009, a Category 1 public meeting was held between the U.S. Nuclear Regulatory Commission (NRC) and representatives of Omaha Public Power District (OPPD) at NRC Headquarters, One White Flint North, 11555 Rockville Pike, Rockville, Maryland. The purpose of the pre-licensing meeting was to discuss with representatives of OPPD plans to submit an Extended Power Uprate (EPU) application for the Fort Calhoun Station, Unit NO.1. A list of attendees is enclosed.

The licensee presented information on how the EPU supports the OPPD Integrated Resource Plan for additional power supply by January 2013. The licensee described its licensing approach, as well as benchmarks. The licensee also discussed its planned plant modifications and schedule. The licensee's slides presented at the meeting are located in the Agencywide Documents Access and Management System (ADAMS) under ADAMS Accession No. ML090370455.

Members of the public were invited to the meeting; however, no members of the public were in attendance. Public Meeting Feedback forms were not received.

Please direct any inquiries to me at 301-415-1377, or Lynnea.Wilkins@nrc.gov.

!),

\\

//}[I 1~/*_*~---w~(L v

LyFlnea Wilkins, Project Engineer Plant Licensing Branch IV Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket No. 50-285

Enclosure:

List of Attendees cc w/encls: Distribution via Listserv

LIST OF ATTENDEES JANUARY 28.2009. PRE-APPLICATION MEETING EXTENDED POWER UPRATE REQUEST OMAHA PUBLIC POWER DISTRICT FORT CALHOUN STATION, UNIT NO.1 Name Organization Lynnea Wilkins NRRlDORLlLPL4 Alan Wang NRRlDORLlLPL4 Istvan Frankl RES/DSNRSAB Carmen Ovici OPPD/EPU Licensing Bernard Van Sant OPPD/EPU BOP Joe McManis OPPD Manager Projects Ron Short OPPD/EPU Project Manager Bill Hansher OPPD/Supervisor-Licensing Hukam Garg NRRlDE/EICB Randy Hall NRRlDORLlLPL4 Bob Dulee OPPD/EPU Licensing Manager Benjamin Parks NRRlDSS/SRXB Michael Markley NRRlDORLlLPL4 Fire Protection Branch Balance of Plant Division of Engineering Division of Operating Reactor Licensing Division of Systems Analysis Division of Safety Systems Instrumentation and Controls Branch Extended Power Uprate Plant Licensing Branch IV Office of Nuclear Reactor Regulation Omaha Public Power District Office of Nuclear Reactor Research Reactor Systems Analysis Branch Reactor Systems Branch AFPB =

BOP =

DE

=

DORL =

DSA =

DSS =

EICB =

EPU =

LPL4 =

NRR =

OPPD =

RES =

RSAB =

SRXB =

Enclosure

Pkg ML090370404, Meeting Notice ML090150438, Meeting Summary ML090370411, Handouts ML090370455 DORULPL4/PM DORULPL4/LA DORULPL4/BC DORULPL4/PM OFFICE DORULPL4/PE AWang JBurkhardt MMarkley AWang NAME LWilkins I

2/13/09 2/11/09 2/11/2009 2/12/09 DATE 2/11/09 II