Letter Sequence Meeting |
---|
|
|
MONTHYEARML1107504052011-03-21021 March 2011 Notice of Meeting with Entergy Operations, Inc., to Discuss Fleetwide Submittal for Proposed Technical Specification and Quality Assurance Program Manual Changes Related to Unit Staff Qualification Requirements Project stage: Meeting ML1109600692011-04-0505 April 2011 Licensee Slides from 4/5/11 Pre-Submittal Meeting with Entergy Operations, Inc. Regarding Changes to TSs and QA Program Manual for Unit Staff Qualifications Project stage: Request ML1110401712011-04-27027 April 2011 04/5/2011 Summary of Preapplication Meeting with Entergy Operations, Inc. to Discuss Fleetwide Submittal for Proposed Technical Specification and Quality Assurance Program Manual Changes Related to Unit Staff Qualification Requirements Project stage: Meeting 2011-04-27
[Table View] |
04/5/2011 Summary of Preapplication Meeting with Entergy Operations, Inc. to Discuss Fleetwide Submittal for Proposed Technical Specification and Quality Assurance Program Manual Changes Related to Unit Staff Qualification RequirementsML111040171 |
Person / Time |
---|
Site: |
Palisades, Indian Point, Grand Gulf, Pilgrim, Arkansas Nuclear, River Bend, Vermont Yankee, Waterford, FitzPatrick |
---|
Issue date: |
04/27/2011 |
---|
From: |
Wang A Plant Licensing Branch IV |
---|
To: |
Entergy Operations |
---|
Wang, A B, NRR/DORL/LPLIV, 415-1445 |
References |
---|
TAC ME5857, TAC ME5858, TAC ME5866, TAC ME5867, TAC ME5868 |
Download: ML111040171 (4) |
|
|
---|
Category:Meeting Summary
MONTHYEARML24234A0072024-10-16016 October 2024 Summary of Partially Closed Meeting with Entergy Operations, Inc. to Discuss a Planned License Amendment Request Related to the Spent Fuel Pool Racks for the Grand Gulf Nuclear Station, Unit 1 ML24277A2972024-10-10010 October 2024 October 2, 2024, Summary of Pre Submittal Public Meeting with Constellation Fitzpatrick, LLC to Discuss Future Amendment on Main Steam Line Radiation Monitor High Radiation System Isolations ML24267A2962024-10-0101 October 2024 Summary of Conference Call Regarding Steam Generator Tube Inspections ML24257A0582024-09-26026 September 2024 Summary of August 1, 2024, Hybrid Public Meeting on the Potential Palisades Nuclear Plant Restart ML24241A1512024-09-18018 September 2024 License Termination Plan Readiness Assessment Site Visit Summary - June 2024 ML24212A0592024-08-0606 August 2024 May 15, 2024, Summary of Meeting with Holtec Decommissioning International,Llc Regarding LAR to Approve Biasi Critical Heat Flux Correlation for Use with Main Steam Line Break Analysis to Support Potential Reauthorization of Power Operation ML24166A2912024-06-25025 June 2024 April 29, 2024, Summary of Meeting with Holtec Decommissioning International, LLC Regarding Plan to Submit a Quality Assurance Program Manual to Support Potential Reauthorization of Power Operations at Palisades Nuclear Plant ML24155A1992024-06-0303 June 2024 Annual Assessment Meeting for Pa/Md/Ny/Nj Nuclear Power Plants - NRC Meeting Summary ML24141A0632024-05-23023 May 2024 Summary of April 17, 2024, Hybrid Public Outreach Meeting ML24128A2512024-05-14014 May 2024 Summary of April 11, 2024, Public Meeting with Constellation Energy Generation, LLC Regarding Proposed Alternative to Implement American Society of Mechanical Engineers Operation and Maintenance Code Case OMN-32 ML24113A2872024-04-25025 April 2024 Summary of Public Meeting with Constellation Energy Generation, LLC Regarding Hooded Masks ML24017A2982024-04-18018 April 2024 Summary of Regulatory Audit Regarding the License Amendment Request to Revise Technical Specifications to Adopt TSTF 505, Revision 2, Provide Risk-Informed Extended Completion Times RITSTF Initiative 4b ML24089A2472024-04-0808 April 2024 March 18, 2024, Summary of Pre-Submittal Meeting with Holtec Decommissioning International, LLC Regarding Proposed Emergency Plan for Resumption of Power Operations at the Palisades Nuclear Plant ML24051A0942024-02-27027 February 2024 Summary of February 6, 2024, Pre-Submittal Meeting with Holtec Decommissioning International, LLC Regarding Technical Specifications Administrative Controls and Quality Assurance Program ML24052A2572024-02-26026 February 2024 Summary of January 17, 2024, Partially Closed Teleconference Meeting with Entergy Operations, Inc. to Discuss Proposed License Amendment Request for Entergy Fleet Regarding Implementation of an Online Monitoring Methodology ML24016A0052024-01-23023 January 2024 Summary of Meeting with Holtec Decommissioning International, LLC, Regarding Power Operations Technical Specifications ML23320A2472023-11-17017 November 2023 Constellation - Summary of November 14, 2023, Public Pre-Application Meeting with Constellation Energy Generation, LLC on Adoption of TSTF-591 ML23303A2132023-11-0101 November 2023 Summary of Meeting with Holtec Decommissioning International, LLC Regarding Plan to Submit a License Transfer Request as Part of a Regulatory Path for Potentially Requesting Reauthorization of Power Operations at Palisades Nuclear Plant ML23271A2682023-10-0505 October 2023 September 25, 2023, Summary of with Constellation Energy Generation, LLC on Proposed Changes to Emergency Plans ML23263A0012023-09-27027 September 2023 Summary of August 29, 2023, Meeting with Holtec Decommissioning International, LLC Regarding Plan to Submit an Exemption Request as Part of a Regulatory Path for Potentially Requesting Reauthorization of Power Operations at Palisades Nuclea ML23263B1062023-09-22022 September 2023 R. E. Ginna Nuclear Power Plant - Constellation - Pre-Application Amse 9/18/2023 Meeting Summary ML23257A2412023-09-19019 September 2023 Summary of August 15, 2023, Pre-submittal Teleconference with Entergy Operations, Inc. to Discuss Proposed License Amendment Request Concerning Pressurizer Heaters for Arkansas Nuclear One, Unit 1 ML23193A8412023-07-17017 July 2023 Summary of Entergy Operations, Inc. Regulatory Conference: GGNS, Calibration Failures of Drywell/Containment High Range Radiation Monitors Resulting in White Finding July 6, 2023 ML23179A0012023-06-28028 June 2023 6/7/2023 - Annual Assessment Meeting for Pa/Md/Ny/Nj Nuclear Power Plants - Meeting Summary ML23171B1222023-06-22022 June 2023 Summary of Meeting with Holtec Decommissioning International, LLC Regarding Regulatory Path for Potentially Requesting Reauthorization of Power Operations at Palisades Nuclear Plant ML23125A0752023-05-0808 May 2023 May 3, 2023, Summary of Public Meeting with Entergy Operations, Inc., to Discuss Planned Submittals of 10 CFR 50.69 and TSTF-505 for Grand Gulf Nuclear Station, Unit 1 ML23107A1212023-04-20020 April 2023 Summary of Meeting with Holtec Decommissioning International, Llc Regarding Regulatory Path for Potentially Requesting Reauthorization of Power Operations at Palisades Nuclear Plant ML23055A0352023-03-24024 March 2023 Summary of February 23, 2023, with Constellation Energy Generation, LLC on Proposed Changes to Emergency Plans to Revise Emergency Action Levels ML23047A3822023-03-21021 March 2023 Summary of December 15, 2022 Periodic Advanced Reactor Stakeholder Public Meeting ML22309A0062022-12-12012 December 2022 Public Non-Sensitive Meeting Summary on Clarification Call with Holtec Regarding Request for Additional Information for Indian Point Unit 2 Master Decommissioning Trust Agreement as Per Indian Point Nuclear Generating Facility Unit 1 and 2 ML22292A2612022-10-31031 October 2022 PSDAR Meeting Summary ML22215A1912022-08-0909 August 2022 Summary of July 13, 2022, Teleconference Meeting with Entergy Operations, Inc. to Discuss Planned License Amendment Requests to Adopt Technical Specifications Task Force (TSTF) Traveler 505, Risk-Informed Extended Completion Times ML22217A0072022-07-29029 July 2022 NRC Regulatory Conference Summary - Licensee Entergy Operations Inc Date of Conference - July 29 2022 ML22187A1462022-07-0606 July 2022 Joint Annual Assessment Meeting for Pa/Md/Nj/Ny Nuclear Power Plants - Meeting Summary ML22167A0882022-06-24024 June 2022 Summary of June 14, 2022, Public Meeting with Entergy Operations, Inc. to Discuss Upcoming Relief Request to Use Code Case N-752 for Grand Gulf Nuclear Station, Unit 1, River Bend Station, Unit 1, and Waterford Steam Electric Station, Unit ML22147A0932022-06-0606 June 2022 2021 Annual Assessment Public Meeting Summary ML22151A1302022-06-0202 June 2022 May 10, 2022, Summary of Teleconference Meeting W/Entergy Operations, Inc. to Discuss a Planned Alternative for a One-Time Schedule Extension for the In-Service Examination of Control Rod Drive Mechanism Penetration No. 1 in the Reactor Ves ML22132A0892022-05-12012 May 2022 Summary of the April 26, 2022, Public Outreach to Discuss the NRC 2021 End-of-Cycle Plant Performance Assessment of Palisades Nuclear Plant ML22125A2452022-05-0909 May 2022 May 3, 2022, Summary of Teleconference Meeting with Entergy Operations, Inc. to Discuss Proposed License Amendment Request for ANO, Units 1 & 2 Regarding Proposed Revision to Emergency Plan and On-Shift Staff Analysis ML22003A0562022-01-10010 January 2022 Summary of December 16, 2021, Presubmittal Teleconference with Entergy Operations, Inc. to Discuss Proposed Amendment Request Concerning TS 3.4.4, RCS Loops, Modes 1 and 2, for Arkansas Nuclear One, Unit 1 ML21342A1402021-12-0909 December 2021 Summary of Public Meeting in Tarrytown, Ny, to Discuss Indian Point Units 1, 2, and 3 (IPEC) Post-shutdown Decommissioning Activities Report ML21323A0472021-12-0606 December 2021 Summary of Public Meeting on November 5, 2021, with the National Organization of Test, Research, and Training Reactors on Operator Licensing for Research and Test Reactors ML21333A1532021-11-30030 November 2021 Summary of November 16, 2021, Meeting with Exelon Generation Company, LLC Regarding a Planned Request for an Alternative to Extend the Inservice Inspection Interval ML21288A0392021-10-18018 October 2021 September 14, 2021, Summary of Public Workshop on Scale/Melcor Source Term Demonstration Project - Pebble-Bed Molten-Salt-Cooled Reactor ML21285A1352021-10-13013 October 2021 Summary of Regulatory Performance Meeting with Entergy Operations, Inc. to Discuss the Results of the Nrc'S Supplemental 95002 Inspection of Grand Gulf Nuclear Station ML21257A3822021-09-15015 September 2021 Summary of Clarification Cal with Holtec Decommissioning International, Llc. Regarding Second Follow-On Emergency Preparedness Request for Additional Information ML21237A0412021-08-30030 August 2021 Summary of the July 27, 2021, Meeting with Exelon Generation Company, LLC Regarding a Planned Request to Use Case OMN-28, ML21238A2752021-08-26026 August 2021 Clarification Call Regarding RAI License Amendment Request Independent Spent Fuel Storage Installation Only Emergency Plan ML21200A2262021-07-19019 July 2021 Summary of the July 1, 2021, Public Outreach to Discuss the NRC 2020 End-of-Cycle Plant Performance Assessment of Palisades Nuclear Plant ML21176A0822021-07-0606 July 2021 June 15, 2021, Summary of Meeting with Exelon Generation Company, LLC Vessel Nozzle Repair Related to a Planned Request for an Alternative Related to Reactor Pressure 2024-09-26
[Table view] |
Text
"I'll REGUl UNITED STATES
~,>v"" "'1"'01' NUCLEAR REGULATORY COMMISSION g' ~ WASHINGTON, D.C. 20555-0001
<< 0 In :
~ ;;
~~~ ~~ April 27, 2011
LICENSEE: Entergy Operations, Inc.
FACILITIES: Arkansas Nuclear One, Units 1 and 2, James A Fitzpatrick Nuclear Power Plant, Grand Gulf Nuclear Station, Indian Point Nuclear Generating Unit Nos. 2 and 3, Palisades Nuclear Plant, Pilgrim Nuclear Power Station, River Bend Station, Vermont Yankee Nuclear Power Station, and Waterford Steam Electric Station, Unit 3
SUBJECT:
SUMMARY
OF APRIL 5, 2011, MEETING WITH ENTERGY ON CHANGES TO TECHNICAL SPECIFICATIONS AND QUALITY ASSURANCE PROGRAM MANUALS FOR UNIT STAFF QUALIFICATIONS (TAC NOS. ME5866, ME5867, ME5857, ME5858, AND ME5868)
On April 5, 2011, a Category 1 public meeting was held between the U.S. Nuclear Regulatory Commission (NRC) and representatives of Entergy Operations, Inc. (Entergy, the licensee), at NRC Headquarters, One White Flint North, 11545 Rockville Pike, Rockville, Maryland, Entergy had requested this meeting to discuss a fleetwide license amendment request to change the Technical Specifications (TSs) and Quality Assurance Program Manuals (QAPM), The Entergy fleet includes Arkansas Nuclear One, Units 1 and 2, James A Fitzpatrick Nuclear Power Plant, Grand Gulf Nuclear Station, Indian Point Nuclear Generating Unit Nos. 2 and 3, Palisades Nuclear Plant, Pilgrim Nuclear Power Station, River Bend Station, Vermont Yankee Nuclear Power Station, and Waterford Steam Electric Station, Unit 3, The proposed changes would eliminate staff qualification disparities between the fleet QAPM and plant-specific TSs, The licensee provided the NRC staff with presentation slides in support of this meeting (Agencywide Documents Access and Management System Accession No. ML110960069). A list of attendees is enclosed.
Entergy stated that currently all Entergy plants, except Fitzpatrick, Palisades, Pilgrim, and Vermont Yankee, reference the American National Standards Institute/American Nuclear Society (ANSIIANS) 3.1-1978 in their TSs. The sites referencing ANSI/ANS 3.1-1978 in their TSs may have exceptions or clarifications. Fitzpatrick, Palisades, Pilgrim, and Vermont Yankee reference ANSI N18.1-1971 in their TSs. Entergy's fleet uses a common QAPM which references the ANSIIANS 3.1-1978. This proposed TS change would have all Entergy plants reference ANSIIANS 3.1-1978 in their TSs. In addition, the change would propose fleet standardization of the qualifications for Radiation Protection Manager, the Shift Technical Advisor, QA manager qualifications, and the use of the improved standard TS generic wording as appropriate. The licensee stated that it believes these changes would accomplish the following three actions:
- 1) Eliminate disparities between TSs and the QAPM,
- 2) Standardize the fleet unit staff qualifications, and
- 3) Allow flexibility in the QA manager selection.
- 2 The NRC staff asked Entergy why it was proposing to reference the 1978 version rather than a later approved version which was issued in 1993. In particular, the NRC staff noted that since the 1978 version has not been approved by the NRC, Entergy would need to justify deviations from the later standard. The NRC staff also noted that another utility had proposed a similar amendment to change to the 1978 version of the standard and has withdrawn the request.
Entergy requested the name of the utility and the NRC staff stated it would get the information for them. Entergy stated it believed the 1978 version is more conservative and the 1993 version has certain requirements that are not needed by older plants. Entergy stated it would look into how the 1978 standard was approved for Entergy plants. The NRC staff noted that for the plants that already have the 1978 standard referenced in the TSs, making these changes appears to be reasonable. Entergy noted it had hoped to standardize the entire fleet at the same time.
No members of the public were in attendance. Public Meeting Feedback forms were not received.
The NRC staff thanked Entergy for the presentation. Please direct any inquiries to me at 301-415-1445, or Alan.Wang@nrc.gov.
~\Y .
Alan B.
Plant wang,~
LiCenSingP~tJ,~h Manager IV Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket Nos. 50-313, 50-368, 50-333, 50-416,50-247,50-286,50-255,50-293, 50-458, 50-271, and 50-382
Enclosure:
List of Attendees cc w/encl: Distribution via Listserv
LIST OF ATrENDEES MEETING ON APRIL 5,2011, BETWEEN NUCLEAR REGULATORY COMMISSION AND ENTERGY OPERATIONS, INC., TO DISCUSS CHANGES TO TECHNICAL SPECIFICATIONS AND QUALITY ASSURANCE PROGRAM MANUALS FOR UNIT STAFF QUALIFICATIONS ARKANSAS NUCLEAR ONE. UNITS 1 AND 2, JAMES A. FITZPATRICK NUCLEAR POWER PLANT, GRAND GULF NUCLEAR STATION, INDIAN POINT NUCLEAR GENERATING UNIT NOS. 2 AND 3, PALISADES NUCLEAR PLANT. PILGRIM NUCLEAR POWER STATION, RIVER BEND STATION, VERMONT YANKEE NUCLEAR POWER STATION, AND WATERFORD STEAM ELECTRIC STATION, UNIT 3 DOCKET NOS. 50-313, 50-368, 50-333, 50-416, 50-247, 50-286, 50-255, 50-293, 50-458, 50-271, AND 50-382 NAME AFFLIATION Bhalchandra Vaidya NRC Mac Chawla NRC Jim Kim NRC Paul Prescott NRC Aaron Armstrong NRC Sean Currie NRC Shaun Anderson NRC GeraldWaig NRC Undine Shoop NRC John Boska NRC Bryon Ford Entergy Ron Byrd Entergy Tom Palmisano Entergy Alan Wang NRC Enclosure
-2 The NRC staff asked Entergy why it was proposing to reference the 1978 version rather than a later approved version which was issued in 1993. In particular, the NRC staff noted that since the 1978 version has not been approved by the NRC, Entergy would need to justify deviations from the later standard. The NRC staff also noted that another utility had proposed a similar amendment to change to the 1978 version of the standard and has withdrawn the request.
Entergy requested the name of the utility and the NRC staff stated it would get the information for them. Entergy stated it believed the 1978 version is more conservative and the 1993 version has certain requirements that are not needed by older plants. Entergy stated it would look into how the 1978 standard was approved for Entergy plants. The NRC staff noted that for the plants that already have the 1978 standard referenced in the TSs, making these changes appears to be reasonable. Entergy noted it had hoped to standardize the entire fleet at the same time.
No members of the public were in attendance. Public Meeting Feedback forms were not received.
The NRC staff thanked Entergy for the presentation. Please direct any inquiries to me at 301-415-1445, or Alan.Wang@nrc.gov.
IRA!
Alan B. Wang, Project Manager Plant Licensing Branch IV Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket Nos. 50-313, 50-368, 50-333, 50-416,50-247,50-286,50-255,50-293, 50-458, 50-271, and 50-382
Enclosure:
List of Attendees cc w/encl: Distribution via Listserv DISTRIBUTION:
PUBLIC RidsNrrPMANO Resource RidsRgn1MailCenter Resource LPL1-1 R/F RidsNrrPMFitzPatrick Resource RidsRgn3MailCenter Resource LPL3-1 R/F RidsNrrPMGrandGulf Resource RidsRgn4MailCenter Resource LPL4 R/F RidsNrrPMlndianPoint Resource SAnderson, NRR/DIRSIITSB RidsAcrsAcnw_MailCTR Resource RidsNrrPMPalisades Resource GWaig, NRR/DIRSIITSB RidsNrrDeEqvb Resource RidsNrrPMPilgrim Resource SCurrie. NRRlDIRSIIOLB RidsNrrDirsltsb Resource RidsNrrPMRiverBend Resource MMartin, NRR/DE/EQVB RidsNrrDirslhpb Resource RidsNrrPMVermontYankee Resource PPrescott, NRR/DE/EQVB RidsNrrDirslolb Resource RidsN rrPMWateriord Resource AArmstrong, NRR/DE/EQVB RidsNrrDorl Resource RidsNrrLABTully Resource CSteger, NRR RidsNrrDorlLpl1-1 Resource RidsNrrLASLittle Resource NSanfilippo, EDO RI RidsNrrDorlLpl3-1 Resource RidsNrrLAJBurkhardt Resource DMerzke, EDO Rill RidsNrrDorlLpl4 Resource RidsOgcRp Resource JTrapp, EDO RIV ADAMS Accession Nos. Meeting Notice : :ML111040171, Handouts ML110960069 NRRIDORULPL41PM NRRIDORlILPL41LA NRRIDIRSIITSBIBC NRRIDIRSIIHBPIBC NRRIDORLlLPL41BC NRRIDORLlLPL4/PM MMarkley (BSingal JBurkhardt RElliott UShoop for) AWang 4/14111 04/26/11 04126111