April 29, 2024, Summary of Meeting with Holtec Decommissioning International, LLC Regarding Plan to Submit a Quality Assurance Program Manual to Support Potential Reauthorization of Power Operations at Palisades Nuclear Plant
ML24166A291
Person / Time
Site: Palisades Entergy icon.png
Issue date: 06/25/2024
From: Justin Poole
Plant Licensing Branch III
To:
Entergy Nuclear Operations
Wall S
Shared Package
ML24166A292 List:
References
EPID L-2024-LRM-0019
Download: ML24166A291 (1)


Text

June 25, 2024 LICENSEE:

HOLTEC DECOMMISSIONING INTERNATIONAL, LLC FACILITIES: PALISADES NUCLEAR PLANT

SUBJECT:

SUMMARY

OF APRIL 29, 2024, MEETING WITH HOLTEC DECOMMISSIONING INTERNATIONAL, LLC REGARDING PLAN TO SUBMIT A QUALITY ASSURANCE PROGRAM MANUAL TO SUPPORT POTENTIAL REAUTHORIZATION OF POWER OPERATIONS AT PALISADES NUCLEAR PLANT (EPID L-2024-LRM-0019)

On April 29, 2024, an Observation meeting was held between the U.S. Nuclear Regulatory Commission (NRC) and representatives of Holtec Decommissioning International, LLC (HDI, the licensee) via webinar. The purpose of the meeting was for the licensee to discuss with the NRC staff their plans to submit a quality assurance program manual (QAPM) to support potential reauthorize of power operations at the Palisades Nuclear Plant. This was a follow-up from a meeting held on February 6, 2024. The meeting notice and agenda dated April 17, 2024, is available in the Agencywide Documents Access and Management System (ADAMS) at Accession No. ML24117A036. A list of attendees is provided as an Enclosure.

The licensees slide presentation is available in ADAMS at ML24116A293. The licensee began the presentation with background information related to the timeline of events to shutdown the plant in 2022 and then provided a current status of the plant. The licensee then started the discussion on their plan to submit a QAPM. The licensee first went over a revision history of the Palisades QAPM surrounding the plant shut down in June 2022. The licensee described how the QAPM at Palisades went from being part of the previous owners fleet procedure, to being a site-specific plan, to finally adopting the HDI decommissioning quality assurance program (QAP) following the transfer of the license to HDI after the plant had shut down.

The licensee stated how the proposed QAPM would be based on the previous owners fleet QAPM that was in effect at Palisades prior to shutdown and highlighted the differences between the two programs. Differences include removal of any previous owners sites or site-specific information, as well as Big Rock Point; changes in owner description and organizational titles; and consolidation of the function of the oversight manager and quality assurance supervisor into one position at Palisades, as examples. The licensee stressed that except for organizational and administrative changes, the body of the QAPM remains the same in terms of content from what was previously in use at Palisades. Since this new QAPM would not be in effect until after potential reauthorization of power operations, the NRC staff asked what quality assurance controls would be in effect during the period of system restoration, and what document would contain these controls. The licensee stated that they plan to update the HDI decommissioning QAP currently in effect with the appropriate quality assurance controls to cover the activities being performed at the plant during the restoration period. The licensee stated they would make these changes without prior NRC approval using the allowances in the regulations but would be subject to inspection once they were in place. The licensee also stated that this controls would be very similar in content to what would be submitted to the NRC in the new QAPM.

The licensee concluded the presentation by going over project schedule, including status of submittals that were previously submitted, as well dates for future submittals. The licensee stated that they planned to submit the QAPM in May 2024 and request approval by June 2025.

While approval would be requested in June 2025, the implementation date of the transfer would not be until August 2025. This aligns with the licensees overall plan for all of their reauthorization of power operation licensing requests. During the meeting the NRC staff question the appropriate mechanism for submitting the QAPM which was not resolved during the meeting. During a follow-up discussion with the licensee, the NRC stated that supplementing the existing license transfer application (submitted on December 6, 2023, ML23340A161), with the new QAPM would be the most appropriate way to submit the information. This was due to the information related to quality assurance and the new organizational structure already in the application. On May 23, 2024 (ML24144A106), the licensee supplemented the license transfer application with the new QAPM.

Members of the public were in attendance and some of them had comments for the NRC staff.

There were comments in favor of the licensee moving forward with the project for reasons related to providing local jobs, tax revenue, and a clean energy source. Others were against the licensee moving forward with the project for reasons such as it being too risky and too old. Also there were questions regarding the use of the decommissioning funds, reactor vessel head and steam generator integrity, environmental impacts, and overall project cost and how it will be funded.

No Public Meeting Feedback Forms were received.

Please direct any inquiries to me at 301-415-2048, or via email at Justin.Poole@nrc.gov.

/RA Ngola Otto for/

Justin C. Poole, Project Manager Plant Licensing Branch I Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket No. 50-255

Enclosure:

List of Attendees cc: Listserv

Enclosure LIST OF ATTENDEES APRIL 29, 2024, MEETING WITH HOLTEC DECOMMISSIONING INTERNATIONAL LLC PLAN TO SUBMIT A QUALITY ASSURANCE PROGRAM MANUAL TO SUPORT POTENTIAL REAUTHORIZATION OF POWER OPERATIONS AT PALISADES NUCLEAR PLANT NRC

Participants:

Jamie Pelton, Deputy Director, Office of Nuclear Reactor Regulation (NRR)/Division of Operating Reactor Licensing (DORL)

Jason Kozal, Director, Region 3 (RIII)/Division of Operating Reactor Safety (DORS)

Phil McKenna, Deputy Director, NRR/Division of Reactor Oversight (DRO)

Russell Felts, Director, NRR/DRO Kerri Kavanagh, Branch Chief, NRR/DRO/Quality Assurance Vendor Inspection Branch (IQVB)

Deanna Zhang, Senior Reactor Ops Engineer, NRR/DRO/IQVB Yui Law, Reactor Ops Engineer, NRR/DRO/IQVB Yamir Diaz-Castillo, Reactor Ops Engineer, NRR/DRO/IQVB Frankie Vega, Reactor Ops Engineer, NRR/DRO/IQVB Jeff Whited, Branch Chief, NRR/DORL/Plant Licensing Branch 3 (LPL3)

Justin Poole, Project Manager, NRR/DORL/LPL3 Ngola Otto, Project Manager, NRR/DORL/Licensing Projects Branch Sophie Holiday, Senior Emergency Response Coordinator, Office of Nuclear Security and Incident Response (NSIR)/Division of Preparedness and Response (DPR)/Coordination Branch Lauren Willingham, Environmental Project Manager, Office of Nuclear Material Safety and Safeguards (NMSS)/Division of Rulemaking, Environmental, and Financial Support (REFS)/Environmental Review New Reactors Branch (ENRB)

Mary Richmond, Environmental Project Manager, NMSS/REFS/ENRB Leah Parks, Environmental Scientist, NMSS/REFS/Environmental Review License Renewal Branch Marlayna Doell, Project Manager, NMSS/Division of Decommissioning, Uranium Recovery, and Waste Programs (DUWP)/Reactor Decommissioning Branch (RDB)

Michael Spencer, Office of General Counsel Scott Burnell, Public Affairs Officer Viktoria Mitlyng, Senior Public Affairs Officer, RIII Prema Chandrathil, Public Affairs Officer, RIII Carolyn Wolf, Congressional Affairs Officer Harral Logaras, Regional Government Liaison Specialist, RIII David Hills, Branch Chief, RIII/Division of Radiological Safety and Security (DRSS)/Decommissioning Reactor ISFSI Health Physics Branch (DRIHP)

Matthew Learn, Team Leader, RIII/DRSS/DRIHP Ed Miller, Senior Project Manager, NRR/DORL/LPL2-1 Gurjendra Bedi, Mechanical Engineer, NRR/Division of Engineering and External Hazards/Mechanical Engineering and Inservice Testing Branch Sam Bina, Project Manager, NRR/DORL Rober Mathis, Senior Construction Inspector, Region 2 Leah Hare, Advisor, Pacific Northwest National Laboratories Holtec Decommissioning International, LLC:

Jean Fleming, Vice President of Licensing, Regulatory Affairs and PSA Michael Schultheis, Manager, Regulatory Affairs Palisades James Miksa, Licensing Engineer Nicholas Culp Kevin Block Michael Mlynarek Public:

Jana Bergman Michael Keegan Kevin Kamps John Faul Ross Stein Kate Hosier Ben Dodson David Manson Craig Smith Jacquelyn Drechsler Michel Lee Sally G David Albers Tom Henry Traven Michaels Carlyn Greene Courtney Michalka K. Kaufmann Steven Sondheim Stephen Minnick Shawn Connors Jennifer Pema Kenneth Fossum Thomas Johnson Mike Johnston Ken Lundberg Peter Colovos Mike Chappell Bruce Fetzer Jason Zorn Justin Palthe Bruce Davis Patrick Mullens Julia Wall Palash Kumar Bhowmik Tom Palmisano Robert Cameron James Zoss Michael Gallagher Mary Ann 1-26XXXXXX94 1-26XXXXXX18 1-91XXXXXX79 1-91XXXXXX24

Package: ML24166A292 Meeting Slides: ML24116A293 Meeting Notice: ML24117A036 Meeting Summary: ML24166A291 NRC-001 OFFICE NRR/DORL/LPL3/PM NRR/DORL/LPL3/LA NRR/DORL/LPL3/BC NRR/DORL/LPL3/PM NAME JPoole SRohrer JWhited JPoole (NOtto for)

DATE 6/14/2024 6/17/2024 6/25/2024 6/25/2024