Letter Sequence Meeting |
---|
EPID:L-2024-LRM-0019, Pre-Submittal Meeting on April 29, 2024 - Palisades Nuclear Plant Power Operations Quality Assurance Program Manual (Open) |
|
|
|
---|
Category:Meeting Summary
MONTHYEARML24303A1162024-11-0606 November 2024 Summary of Meeting with Holtec Decommissioning International, LLC Regarding LAR Request to Approve the Biasi Critical Heat Flux Correlation for Use with the Main Steam Line Break Analysis to Support Potential ML24267A2962024-10-0101 October 2024 Summary of Conference Call Regarding Steam Generator Tube Inspections ML24257A0582024-09-26026 September 2024 Summary of August 1, 2024, Hybrid Public Meeting on the Potential Palisades Nuclear Plant Restart ML24212A0592024-08-0606 August 2024 May 15, 2024, Summary of Meeting with Holtec Decommissioning International,Llc Regarding LAR to Approve Biasi Critical Heat Flux Correlation for Use with Main Steam Line Break Analysis to Support Potential Reauthorization of Power Operation ML24166A2912024-06-25025 June 2024 April 29, 2024, Summary of Meeting with Holtec Decommissioning International, LLC Regarding Plan to Submit a Quality Assurance Program Manual to Support Potential Reauthorization of Power Operations at Palisades Nuclear Plant ML24141A0632024-05-23023 May 2024 Summary of April 17, 2024, Hybrid Public Outreach Meeting ML24089A2472024-04-0808 April 2024 March 18, 2024, Summary of Pre-Submittal Meeting with Holtec Decommissioning International, LLC Regarding Proposed Emergency Plan for Resumption of Power Operations at the Palisades Nuclear Plant ML24051A0942024-02-27027 February 2024 Summary of February 6, 2024, Pre-Submittal Meeting with Holtec Decommissioning International, LLC Regarding Technical Specifications Administrative Controls and Quality Assurance Program ML24016A0052024-01-23023 January 2024 Summary of Meeting with Holtec Decommissioning International, LLC, Regarding Power Operations Technical Specifications ML23303A2132023-11-0101 November 2023 Summary of Meeting with Holtec Decommissioning International, LLC Regarding Plan to Submit a License Transfer Request as Part of a Regulatory Path for Potentially Requesting Reauthorization of Power Operations at Palisades Nuclear Plant ML23263A0012023-09-27027 September 2023 Summary of August 29, 2023, Meeting with Holtec Decommissioning International, LLC Regarding Plan to Submit an Exemption Request as Part of a Regulatory Path for Potentially Requesting Reauthorization of Power Operations at Palisades Nuclea ML23171B1222023-06-22022 June 2023 Summary of Meeting with Holtec Decommissioning International, LLC Regarding Regulatory Path for Potentially Requesting Reauthorization of Power Operations at Palisades Nuclear Plant ML23107A1212023-04-20020 April 2023 Summary of Meeting with Holtec Decommissioning International, Llc Regarding Regulatory Path for Potentially Requesting Reauthorization of Power Operations at Palisades Nuclear Plant ML22292A2612022-10-31031 October 2022 PSDAR Meeting Summary ML22132A0892022-05-12012 May 2022 Summary of the April 26, 2022, Public Outreach to Discuss the NRC 2021 End-of-Cycle Plant Performance Assessment of Palisades Nuclear Plant ML21200A2262021-07-19019 July 2021 Summary of the July 1, 2021, Public Outreach to Discuss the NRC 2020 End-of-Cycle Plant Performance Assessment of Palisades Nuclear Plant ML21145A0482021-06-0202 June 2021 Summary of May 12, 2021, Teleconference with Entergy Nuclear Operations, Inc. to Discuss Potential License Amendment Request Related to Permanently Defueled Technical Specifications for Palisades Nuclear Plant ML21012A0382021-01-14014 January 2021 December 8, 2020, Summary of Public Teleconference with Entergy Nuclear Operations Inc. Regarding Pre-submittal of a License Transfer Application to Holtec International for Palisades Nuclear Plant ML20309A2372020-11-0606 November 2020 Summary of Public Teleconference with Entergy Nuclear Operations, Inc. to Discuss Future Request for One-Time Exemption from Certain Requirements of 10 CFR 50, Appendix E, Section Iv.F. at Palisades Nuclear Plant (EPID L-2020-LRM-0091 ML20304A1442020-11-0202 November 2020 Summary of September 21, 2020, Public Teleconference with Entergy Nuclear Operations Inc. Regarding a Proposed Alternative for Repair of Reactor Vessel Head Penetrations for Palisades Nuclear Plant ML20280A6952020-10-13013 October 2020 Letter - Palisades Nuclear Plant- Summary of September 11, 2020, Conference Call with Entergy Nuclear Operations Inc. Regarding the Fall 2020 Steam Generator Tube Inspections at Palisades Nuclear Plant EPID L-2020-LRO-0051 ML20280A6962020-10-13013 October 2020 20200912 NRC Mid Outage Q and a for Phone Call for Palisades 1R27 (Revised) ML20280A6972020-10-13013 October 2020 20200910 NRC Mid Outage Q and a for Phone Call for Palisades 1R27-Entergy Responses ML20231A2202020-08-17017 August 2020 Summary of Public Webinar to Discuss the NRC 2019 End-Of-Cycle Plant Performance Assessment of the Palisades Nuclear Plant ML19296D0632019-11-0101 November 2019 August 2019 Palisades NEIMA 108 Public Meeting Summary ML19136A2552019-05-16016 May 2019 Summary of the Public Outreach/Open House to Discuss the NRC 2018 End-of-Cycle Plant Performance Assessment of the Palisades Nuclear Plant ML18351A2382018-12-18018 December 2018 Summary of Public Teleconference Call with Entergy Nuclear Operations. Inc., Regarding Emergent Alternative Request for Repair of Central Rod Drive Nozzles at Palisades Nuclear Plant ML18340A0072018-12-0606 December 2018 Summary of Call with Entergy Nuclear Operations, Inc. - Verbal Authorization of Request for Alternative for the Repair of Reactor Vessel Closure Head Penetrations ML18268A2802018-09-26026 September 2018 Summary of Public Teleconference Call with Entergy Nuclear Operations, Inc. Regarding Upcoming License Amendment Request to Relocate Surveillance Frequencies to Licensee Control ML18107A4972018-04-27027 April 2018 April 10, 2017, Summary of Public Meeting with Entergy Nuclear Operations, Inc. Regarding Upcoming License Amendment Request to Add Setpoint Verification Requirement to Technical Specification Surveillance Requirements ML18113A6592018-04-23023 April 2018 Summary of Open House to Discuss the 2017 End-of-Cycle Plant Performance Assessment of Palisades Nuclear Plant ML18099A0712018-04-16016 April 2018 March 20, 2018, Summary of Meeting with the Nuclear Energy Institute and Other Industry Representatives Regarding the Surveillance Frequency Control Program ML18008A2302018-01-10010 January 2018 Summary of Public Teleconference Meeting with Entergy Nuclear Operations, Inc., Regarding Request to Extend Enforcement Discretion for Tornado-Generated Missile Non-Conformances at Palisades Nuclear Plant ML17335A0262017-12-0505 December 2017 Summary of November 27, 2017 Public Meeting with Entergy Nuclear Operations, Inc. Regarding Request to Extend Enforcement Discretion for Tornado Missle Non-Confomances ML17338B0502017-12-0505 December 2017 Summary of November 28, 2017, Public Meeting with Entergy Nuclear Operations, Inc. Regarding a Potential Request Associated with an Alternative to the Reexamination Frequency for a Relevant Condition ML17227A2742017-08-14014 August 2017 Summary of the July 26, 2017, Public Meeting Regarding Palisades Nuclear Plant ML17173A7672017-07-28028 July 2017 Summary of 6/20/2017 Meeting with Entergy to Discuss Plan for Decommissioning Licensing Actions of Palisades, Pilgrim, Indian Point, Units 2 and 3, and Vermont Yankee ML17164A3112017-06-27027 June 2017 Summary of 06/12/2017, Pre-Submittal Meeting with Entergy Nuclear Operations, Inc. to Discuss Palisades Nuclear Plant Post Shutdown Emergency Plan and Administrative Technical Specification License Amendment Request ML17160A1812017-06-14014 June 2017 Summary of Conference Call with Palisades Nuclear Plant Regarding the Spring 2017 Steam Generator Inspections ML17080A1492017-03-23023 March 2017 Summary of March 20, 2017, Public Meeting with Entergy Nuclear Operations, Inc. Regarding the Cyber Security Plan Implementation Schedule ML16344A0862016-12-20020 December 2016 Summary of Public Meeting with Entergy Nuclear Operations, Inc. Regarding National Fire Protection Association Standard 805 ML16277A6772016-10-11011 October 2016 Summary of Public Meeting with Entergy Nuclear Operations, Inc. Regarding the Proposed Closure Plant for Generic Safety Issue 191, Assessment of Debris Accumulation on Pressurized Water Reactor (PWR) Sump Performance ML16182A5142016-06-30030 June 2016 Summary of the June 23, 2016, Public Meeting Regarding Palisades Nuclear Plant ML16127A1722016-05-0505 May 2016 6/23/16 Notice of Significant Public Meeting to Discuss Nrc'S End-of-Cycle Assessment of the Palisades Nuclear Plant Performance for the 2015 Calendar Year ML16035A4252016-03-0101 March 2016 Summary of January 25, 2016, Pre-Application Teleconference Meeting with Entergy Nuclear Operations to Discuss a Forthcoming License Amendment Request Regarding Steam Generator Cold Leg Alternate Repair Criteria at Palisades Nuclear Plant ( ML15294A2972015-10-27027 October 2015 Steam Generator Tube Inspection Discussion During Palisades 2015 (RF24) Outage (Preliminary Information) ML15294A2922015-10-27027 October 2015 Summary of Conference Call with Palisades Nuclear Plant Regarding the Fall 2015 Steam Generator Inspections ML15272A0652015-09-30030 September 2015 Summary of Telephone Conference on September 28, 2015, Verbal Authorization of Relief Request for Palisades Nuclear Plant ML15261A0392015-09-21021 September 2015 September 17, 2015, Summary of Telephone Conference Verbal Authorization of Relief Request for Palisades Nuclear Plant ML15119A0442015-05-0606 May 2015 Summary of April 14, 2015, Meeting with Entergy Nuclear Operations, Inc. on Plans for Volumetric Examinations of Primary Coolant System Alloy 600 Welds 2024-09-26
[Table view] |
Text
June 25, 2024 LICENSEE:
HOLTEC DECOMMISSIONING INTERNATIONAL, LLC FACILITIES: PALISADES NUCLEAR PLANT
SUBJECT:
SUMMARY
OF APRIL 29, 2024, MEETING WITH HOLTEC DECOMMISSIONING INTERNATIONAL, LLC REGARDING PLAN TO SUBMIT A QUALITY ASSURANCE PROGRAM MANUAL TO SUPPORT POTENTIAL REAUTHORIZATION OF POWER OPERATIONS AT PALISADES NUCLEAR PLANT (EPID L-2024-LRM-0019)
On April 29, 2024, an Observation meeting was held between the U.S. Nuclear Regulatory Commission (NRC) and representatives of Holtec Decommissioning International, LLC (HDI, the licensee) via webinar. The purpose of the meeting was for the licensee to discuss with the NRC staff their plans to submit a quality assurance program manual (QAPM) to support potential reauthorize of power operations at the Palisades Nuclear Plant. This was a follow-up from a meeting held on February 6, 2024. The meeting notice and agenda dated April 17, 2024, is available in the Agencywide Documents Access and Management System (ADAMS) at Accession No. ML24117A036. A list of attendees is provided as an Enclosure.
The licensees slide presentation is available in ADAMS at ML24116A293. The licensee began the presentation with background information related to the timeline of events to shutdown the plant in 2022 and then provided a current status of the plant. The licensee then started the discussion on their plan to submit a QAPM. The licensee first went over a revision history of the Palisades QAPM surrounding the plant shut down in June 2022. The licensee described how the QAPM at Palisades went from being part of the previous owners fleet procedure, to being a site-specific plan, to finally adopting the HDI decommissioning quality assurance program (QAP) following the transfer of the license to HDI after the plant had shut down.
The licensee stated how the proposed QAPM would be based on the previous owners fleet QAPM that was in effect at Palisades prior to shutdown and highlighted the differences between the two programs. Differences include removal of any previous owners sites or site-specific information, as well as Big Rock Point; changes in owner description and organizational titles; and consolidation of the function of the oversight manager and quality assurance supervisor into one position at Palisades, as examples. The licensee stressed that except for organizational and administrative changes, the body of the QAPM remains the same in terms of content from what was previously in use at Palisades. Since this new QAPM would not be in effect until after potential reauthorization of power operations, the NRC staff asked what quality assurance controls would be in effect during the period of system restoration, and what document would contain these controls. The licensee stated that they plan to update the HDI decommissioning QAP currently in effect with the appropriate quality assurance controls to cover the activities being performed at the plant during the restoration period. The licensee stated they would make these changes without prior NRC approval using the allowances in the regulations but would be subject to inspection once they were in place. The licensee also stated that this controls would be very similar in content to what would be submitted to the NRC in the new QAPM.
The licensee concluded the presentation by going over project schedule, including status of submittals that were previously submitted, as well dates for future submittals. The licensee stated that they planned to submit the QAPM in May 2024 and request approval by June 2025.
While approval would be requested in June 2025, the implementation date of the transfer would not be until August 2025. This aligns with the licensees overall plan for all of their reauthorization of power operation licensing requests. During the meeting the NRC staff question the appropriate mechanism for submitting the QAPM which was not resolved during the meeting. During a follow-up discussion with the licensee, the NRC stated that supplementing the existing license transfer application (submitted on December 6, 2023, ML23340A161), with the new QAPM would be the most appropriate way to submit the information. This was due to the information related to quality assurance and the new organizational structure already in the application. On May 23, 2024 (ML24144A106), the licensee supplemented the license transfer application with the new QAPM.
Members of the public were in attendance and some of them had comments for the NRC staff.
There were comments in favor of the licensee moving forward with the project for reasons related to providing local jobs, tax revenue, and a clean energy source. Others were against the licensee moving forward with the project for reasons such as it being too risky and too old. Also there were questions regarding the use of the decommissioning funds, reactor vessel head and steam generator integrity, environmental impacts, and overall project cost and how it will be funded.
No Public Meeting Feedback Forms were received.
Please direct any inquiries to me at 301-415-2048, or via email at Justin.Poole@nrc.gov.
/RA Ngola Otto for/
Justin C. Poole, Project Manager Plant Licensing Branch I Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket No. 50-255
Enclosure:
List of Attendees cc: Listserv
Enclosure LIST OF ATTENDEES APRIL 29, 2024, MEETING WITH HOLTEC DECOMMISSIONING INTERNATIONAL LLC PLAN TO SUBMIT A QUALITY ASSURANCE PROGRAM MANUAL TO SUPORT POTENTIAL REAUTHORIZATION OF POWER OPERATIONS AT PALISADES NUCLEAR PLANT NRC
Participants:
Jamie Pelton, Deputy Director, Office of Nuclear Reactor Regulation (NRR)/Division of Operating Reactor Licensing (DORL)
Jason Kozal, Director, Region 3 (RIII)/Division of Operating Reactor Safety (DORS)
Phil McKenna, Deputy Director, NRR/Division of Reactor Oversight (DRO)
Russell Felts, Director, NRR/DRO Kerri Kavanagh, Branch Chief, NRR/DRO/Quality Assurance Vendor Inspection Branch (IQVB)
Deanna Zhang, Senior Reactor Ops Engineer, NRR/DRO/IQVB Yui Law, Reactor Ops Engineer, NRR/DRO/IQVB Yamir Diaz-Castillo, Reactor Ops Engineer, NRR/DRO/IQVB Frankie Vega, Reactor Ops Engineer, NRR/DRO/IQVB Jeff Whited, Branch Chief, NRR/DORL/Plant Licensing Branch 3 (LPL3)
Justin Poole, Project Manager, NRR/DORL/LPL3 Ngola Otto, Project Manager, NRR/DORL/Licensing Projects Branch Sophie Holiday, Senior Emergency Response Coordinator, Office of Nuclear Security and Incident Response (NSIR)/Division of Preparedness and Response (DPR)/Coordination Branch Lauren Willingham, Environmental Project Manager, Office of Nuclear Material Safety and Safeguards (NMSS)/Division of Rulemaking, Environmental, and Financial Support (REFS)/Environmental Review New Reactors Branch (ENRB)
Mary Richmond, Environmental Project Manager, NMSS/REFS/ENRB Leah Parks, Environmental Scientist, NMSS/REFS/Environmental Review License Renewal Branch Marlayna Doell, Project Manager, NMSS/Division of Decommissioning, Uranium Recovery, and Waste Programs (DUWP)/Reactor Decommissioning Branch (RDB)
Michael Spencer, Office of General Counsel Scott Burnell, Public Affairs Officer Viktoria Mitlyng, Senior Public Affairs Officer, RIII Prema Chandrathil, Public Affairs Officer, RIII Carolyn Wolf, Congressional Affairs Officer Harral Logaras, Regional Government Liaison Specialist, RIII David Hills, Branch Chief, RIII/Division of Radiological Safety and Security (DRSS)/Decommissioning Reactor ISFSI Health Physics Branch (DRIHP)
Matthew Learn, Team Leader, RIII/DRSS/DRIHP Ed Miller, Senior Project Manager, NRR/DORL/LPL2-1 Gurjendra Bedi, Mechanical Engineer, NRR/Division of Engineering and External Hazards/Mechanical Engineering and Inservice Testing Branch Sam Bina, Project Manager, NRR/DORL Rober Mathis, Senior Construction Inspector, Region 2 Leah Hare, Advisor, Pacific Northwest National Laboratories Holtec Decommissioning International, LLC:
Jean Fleming, Vice President of Licensing, Regulatory Affairs and PSA Michael Schultheis, Manager, Regulatory Affairs Palisades James Miksa, Licensing Engineer Nicholas Culp Kevin Block Michael Mlynarek Public:
Jana Bergman Michael Keegan Kevin Kamps John Faul Ross Stein Kate Hosier Ben Dodson David Manson Craig Smith Jacquelyn Drechsler Michel Lee Sally G David Albers Tom Henry Traven Michaels Carlyn Greene Courtney Michalka K. Kaufmann Steven Sondheim Stephen Minnick Shawn Connors Jennifer Pema Kenneth Fossum Thomas Johnson Mike Johnston Ken Lundberg Peter Colovos Mike Chappell Bruce Fetzer Jason Zorn Justin Palthe Bruce Davis Patrick Mullens Julia Wall Palash Kumar Bhowmik Tom Palmisano Robert Cameron James Zoss Michael Gallagher Mary Ann 1-26XXXXXX94 1-26XXXXXX18 1-91XXXXXX79 1-91XXXXXX24
Package: ML24166A292 Meeting Slides: ML24116A293 Meeting Notice: ML24117A036 Meeting Summary: ML24166A291 NRC-001 OFFICE NRR/DORL/LPL3/PM NRR/DORL/LPL3/LA NRR/DORL/LPL3/BC NRR/DORL/LPL3/PM NAME JPoole SRohrer JWhited JPoole (NOtto for)
DATE 6/14/2024 6/17/2024 6/25/2024 6/25/2024