ML17305A862

From kanterella
Revision as of 10:27, 29 October 2019 by StriderTol (talk | contribs) (Created page by program invented by StriderTol)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Errata to Monthly Operating Rept for Feb 1990 for Palo Verde Nuclear Generating Station,Unit 2
ML17305A862
Person / Time
Site: Palo Verde Arizona Public Service icon.png
Issue date: 02/28/1990
From: Porter K
ARIZONA PUBLIC SERVICE CO. (FORMERLY ARIZONA NUCLEAR
To:
Shared Package
ML17305A861 List:
References
NUDOCS 9006050337
Download: ML17305A862 (2)


Text

~~ AMENDED ~~

NRC MONTHLY OPERATING REPORT DOCKET NO. 50-529 DATE COMPLETED BY K F Porter OPERATING STATUS

1. Unit Name: Palo Verde Nuclear Generatin Station Unit 2
2. Reporting Period: ebrua 1990
3. Licensed Thermal Power (MWt): 3800
4. Nameplate Rating (Gross MWe): 1403
5. Design Electrical Rating (Net MWe): ~12 0
6. Maximum Dependable Capacity (Gross MWe): 1303
7. Maximum Dependable Capacity (Net MWe): 1221
8. If Changes Occur In Capaci.ty Ratings (Item Numbers 3 Through 7)

Since Last Report, Give Reasons: N A

9. Power Level to Which Restricted, If Any (Net MWe): None 10 Reasons For Restrictions, If Any: A This Month Yr.-to-Date Cumulative
11. Hours in Reporting Period 6 2 1 416 30 216
12. Number of Hours Reactor Was Critical 551 0 1 295 0 20 546 1
13. Reactor Reserve Shutdown Hours 0 0 0 0 0 0
14. Hours Generator On-Line 551 0 1 295 0 0 042 2
15. Unit Reserve Shutdown Hours 0 0 0 0 0 0
16. Gross Thermal Energy Generated (MWH) 2 064 631 480 00 3 499 053
17. Gross Electrical Energy Generated (MWH) 26 800 1 12 500
18. Net Electrical Energy Generated (MWH) 683 616 1 614 008 23 996 820 I
19. Unit Service Factor 66 3s
20. Unit Availability Factor 66 3
21. Unit Capacity Factor (Using MDC Net) 83 3 93 4 65 0%

22 Unit Capacity Factor (Using DER Net) 80 1 89 8 62 5 Unit Forced

'3.

Outage Rate 0 0 0 0 9 9

24. Shutdowns Scheduled Over Next 6 Months (Type, Date and Duration of Each):

N A

25. If Shutdown At End of Report Period, Estimated Date of Start-up:

Ma 31 1990 Forecast Achieved INITIAL CRITICALITY ~03 86 ~04 18 86 INITIAL ELECTRICITY ~06 86 05 20 86 COMMERCIAL OPERATION ~11 86 09 19 86 PDR R

'DC 9006050337 9005$ i ADOCK 05000529 6

C l

I I