ML17306A681

From kanterella
Revision as of 09:10, 29 October 2019 by StriderTol (talk | contribs) (Created page by program invented by StriderTol)
Jump to navigation Jump to search
Special Rept SR-92-002:on 920411,insp of SGs Resulted in Plugging of 23 Tubes in SG 1 & 18 Tubes in SG 2.Complete Results of SG Tube ISI Will Be Submitted by 930411
ML17306A681
Person / Time
Site: Palo Verde Arizona Public Service icon.png
Issue date: 04/18/1992
From: James M. Levine
ARIZONA PUBLIC SERVICE CO. (FORMERLY ARIZONA NUCLEAR
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
192-00781-JML-T, 192-781-JML-T, SR-92-002, SR-92-2, NUDOCS 9204280349
Download: ML17306A681 (3)


Text

ACCELERATED DEMON!CO'RATION SYSTEM DISTRIBUTION REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)

ACCESSION NBR:9204280349 DOC.DATE: 92/04/18 NOTARIZED: NO DOCKET FACIL:STN-50-528 Palo Verde Nuclear Station, Unit 1, Arizona Publi 05000528 AUTH. NAME AUTHOR AFFILIATION LEVINE,J.M. Arizona Public Service Co. (formerly Arizona Nuclear Power RECIP.NAME RECIPIENT AFFILIATION Document Control Branch (Document Control Desk) R

SUBJECT:

Special Rept SR-92-002:on 920411,insp of SGs resulted in plugging of 23 tubes in SG 1 & 18 tubes in SG 2.Complete results of SG tube,ISI will be submitted by 930411. D DISTRIBUTION CODE: IE22D COPIES RECEIVED:LTR [ ENCL ( SIZE:

TITLE: 50.73/50.9 Licensee Event Report (LER), Incident Rpt, etc.

NOTES:STANDARDIZED PLANT 05000528 /

A RECIPIENT COPIES RECIPIENT COPIES ID CODE/NAME LTTR ENCL ID CODE/NAME LTTR ENCL D PD5 LA 1 1 PD5 PD 1 1

  • TRAMMELL,C 1 '1 THOMPSON,M 1 1 D INTERNAL: ACNW 2 2 ACRS 2 2 AEOD/DOA 1 1 AEOD/DSP/TPAB 1 1 AEOD/ROAB/DSP 2 2 NRR/DET/EMEB 7E 1 1 NRR/DLPQ/LHFB10 1 1 NRR/DLPQ/LPEB10 1 1 NRR/DOEA/OEAB 1 1 NRR/DREP/PRPB11 2 2 NRR/DST/SELB 8D 1 1 NRR/DST/SICB8H3 1 1 RR/3)S .

LB8D1 1 1 NRR/DST/SRXB 8E 1 1 G ~E 02 1 1 RES/DSIR/EIB '1 1 RGN5 FILE 01 1 1 EXTERNAL: EG&G BRYCE,J.H 3 3 L ST LOBBY WARD 1 1 NRC PDR 1 1 NSIC MURPHY,G.A 1 1 NSIC POORE,W. 1 1 NUDOCS FULL TXT 1. 1 D

D NOTE TO ALL "RlDS" RECIPIENTS:

PLEASE HELP US TO REDUCE iVASTE! CONTACT THE DOCUMENT CONTROL DESK, ROOiVI P 1-37 (EXT. 20079) TO ELIMINATEYOUR NAME FROM DISTRIBUTION LISTS FOR DOCUMENTS YOU DON'T NEED!

TOTAL NUMBER OF COPIES REQUIRED: LTTR 33 ENCL 33

"Arizona Public Service Company PALO VERDE NUCLEAR GENERATING STATION P.O. BOX 52034 ~ PHOENIX, ARIZONA85072-2034 192-00781-JML/TRB/KR JAMES M. LEVINE VICE PRESIDENT April 18, 1992 NUCI.EAR PRODUCTION U. S. Nuclear Regulatory Commission Attention: Document Control Desk Mail Station Pl-37 Washington, D.C. 20555

Dear Sirs:

Sub j ect: Palo Verde Nuclear Generating Station (PVNGS)

Unit 1 Docket No. STN 50-528 (License No. NPF-41)

Special Report 1-SR-92-002 ile'2-020-404 Attached please find Special Report 1-SR-92-002 prepared and submitted pursuant to Technical Specifications 4.4.4.5 and 6.9.2. This report discusses steam generator tube plugging in Unit 1. A copy of the Special Report is being forwarded to the Regional Administrator, NRC Region V.

If you have any questions, please contact T. R. Bradish, Compliance Manager, at (602) 393-5421.

Very truly yours, JML/TRB/KR Attachment cc: W. F. Conway (all with attachment)

J ~ B. Martin D. H. Coe 9204280349 920418 PDR ADOCK 05000528 8 PDR

Palo Verde Nuclear Generating Station Unit 1 Steam Generator Tube Plugging Docket.No. STN 50-528 License No. NPF-41 Special Report No. 1-SR-92-002 This Special Report is being provided pursuant to Palo Verde 'Unit 1 Technical Specification TS 4.4.4.5(a) and TS 6.9.2 to report the number of steam generator tubes plugged as a result of inservice inspection activities. On April 11, 1992, Unit 1 was in a refueling outage with the core off-loaded to the Spent Fuel Pool when an inservice inspection of both steam generators was completed. The inspection resulted in the plugging of 23 tubes in Steam Generator No. 1 and 18 tubes in Steam Generator No. 2.

Pursuant to Technical Specification 4.4.4.5(b), the complete results of the steam generator tube inservice inspection will be submitted by April 11, 1993.