ML18011A433

From kanterella
Revision as of 06:15, 22 October 2019 by StriderTol (talk | contribs) (Created page by program invented by StriderTol)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Monthly Operating Rept for Apr 1994 for Shearon Harris Nuclear Power Plant Unit 1.W/940511 Ltr
ML18011A433
Person / Time
Site: Harris Duke Energy icon.png
Issue date: 04/30/1994
From: Robinson W, Shannon Rogers
CAROLINA POWER & LIGHT CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
HNP-94-039, HNP-94-39, NUDOCS 9405190189
Download: ML18011A433 (5)


Text

ACCELERATED DI UTION DEMONST TION SYSTEM REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)

DOCKET FACIL:50-400 Shearon Harris Nuclear Power Plant, Unit 1, Carolina 05000400 AUTH. NAME AUTHOR AFFILIATION ROGERS,S.G. Carolina Power 6 Light Co.

ROBINSON,W,R. Carolina Power 6 Light Co.

RECIP.NAME RECIPIENT AFFILIATION

SUBJECT:

Monthly operating rept for A r or Shearon Harris Nuclear Power Plant Unit 940511 r. D DISTRIBUTION CODE: IE24D COPIES RECEIVED:LTR ENCL SIZE:

TITLE: Monthly Operating Report (per Tech Specs)

NOTES:Application for permit renewal filed. 05000400 /

RECIPIENT COPIES RECIPIENT COPIES ID CODE/NAME LTTR ENCL ID CODE/NAME LTTR ENCL D PD2-1 PD 1 1 LE,N 1 1 INTERNAL: ACRS 10 D 10 AEOD/DOA 1 1 AEOD/DS P/TPAB 1 1 NRR OEAB 1 1 NRR/DRIL/RPEB 1 1 REG FILE 01 1 1 RGN2 1 1 EXTERNAL EGGG BRYCE i J ~ H 1 1 NRC PDR NSIC 1 1 D

A D

D NOTE TO ALL "RIDS" RECIPIENTS:

PLEASE HELP US TO REDUCE WASTE! CONTACT THE DOCUMENT CONTROL DESK, ROOM Pl-37 (EXT. 20079) TO ELIMINATEYOUR NAME FROM DISTRIBUTION LISTS FOR DOCUMENTS YOU DON'T NEED!

TOTAL NUMBER OF COPIES REQUIRED: LTTR 21 ENCL 21

Carolina Power & Light Company William R. Robinson PO Box 165 Vice President New Hill NC 27562 Harris Nuclear Plant MAY ~ 1 1994 File: HO-940315 Serial HNP-94-039 United States Nuclear Regulatory Commission Attention: Document Control Desk Washington, DC 20555 SHEARON HARRIS NUCLEAR POWER PLANT DOCKET NO. 50-400/LICENSE NO. NPF-63 MONTHLY OPERATIONS REPORT Gentlemen:

In accordance with Technical Specification 6.9.1.5 for the Shearon Harris Nuclear Power Plant, Unit No. 1, Carolina Power 4, Light Company herewith submits the report of operation statistics and shutdown experience for the month of April 1994.

Sincerely, W. R. Robinson SGR:dmw Enclosure c: Mr. S. D. Ebneter (NRC-RII)

Mr. N. B. Le (NRR)

Mr. J. E. Tedrow (NRC-SHNPP)

VOOSie01a9 9eoeso PDR ADOCK 05000400 E PDg gr,r,c<6 C~0 0 StateRoad1134 NewHill NC Tel 919362-2502 Fax 919362-6950

Enclosure to l.

Serial HNP-94-039 CPSL, CO PLANT PERFORMANCE DATA SYSTEM PAGE 1 RUN DATE 05/09/94 OPERATING DATA REPORT RPD36-000 Sheet 1 of 3 RUN TIME 10:02:03 HARRIS UNIT 1 DOCKET NO. 050-400 COMPLETED BY SHEILA ROGERS OPERATING STATUS TELEPHONE (919)362-2573

l. UNIT NAME: HARRIS UNIT 1 NOTES
2. REPORTING PERIOD: APRIL 94
3. LICENSED THERMAL FOWER (MWT): 2775
4. NAMEPLATE RATING (GROSS MWE): 950 9 ~
5. DESIGN ELECTRICAL RATING (NET MWE): 900.0
6. MAX DEPENDABLE CAPACITY (GROSS MWE): 920.0
7. MAX DEPENDABLE CAPACITY (NET WE): 860.0
8. IF CHANGES OCCUR IN CAPACITY RATINGS (ITEMS 3 THRU 7) SINCE LAST REPORT, GIVE REASONS: NQNE
9. POWER LEVEL TO WHICH RESTRICTED IP ANY (NET MWE): NQ'NE
10. REASONS FOR RESTRICTION IF ANY: N/A THIS YR TO CUMUL MONTH DATE ATZVE
11. HOURS ZN REPORTING PERZOD 719. 00 2879 00

~ 61344. 00

12. NUMBER OF HOURS REACTOR CRITICAL ~ 00 1849 ~ 83 50152 ~ 14
13. REACTOR RESERVE SHUTDOWN HRS .00 .00 F 00
14. HOURS GENERATOR ON LINE .00 1849.55 49627.18
15. UNIT RESERVE SHUTDOWN HOURS .00 .00 .00
16. GROSS THERMAL ENERGY GEN. (MWH) .00 5068200.06 132326854.02
17. GROSS ELKS ENERGY GENo (MWH) .00 1708521.00 44142742.00
18. NET ELEC. ENERGY GENERATED (MWH) -7821.00 1588518.00 41121915.00
19. UNIT SERVICE FACTOR .00 64.24 80.90
20. UNIT AVAILABILITYFACTOR .00 64.24 80.90
21. UNIT CAP. FACTOR (USING MDC NET) -1. 26 64.16 77.95
22. UNIT CAP. FACTOR (USING DER NET) -l. 21 61. 31 74.48
23. UNIT FORCED OUTAGE RATE ~ 00 .00 3 '2 24 SHUTDOWNS SCHED ~ OVER NEXT 6 MONTHS (TYPEi DATEi AND DURATION OF EACH) t Unit was shutdown on March 19, 1994 and remains in refueling outage number S.
25. IF SHUTDOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF START UPcMay 12, 1994
26. UNITS IN TEST STATUS (PRIOR TO COMMERCIAL OPERATION)s FORECAST ACHIEVED INITIAL CRITICALITY INITIAL ELECTRICITY COMMERCIAL OPERATION 1.16 - 9 MZS/MNTH-OPR.RPT/3/OS4

Enclosure'o .: ',

Serial 'HNP-94-039 Sheet 2 of 3

~

~ j CPCL CO PLANT PERFORMANCE DATA SYSTEM PAGE 1 RUN DATE 05/05/94 APPENDIX B - AVERAGE DAILY POWER LEVEL RPD39-000 RUN TIME 11:41:54 HARRIS UNIT 1 DOCKET NO. 050-400 COMPLETED BY SHEILA ROGERS TELEPHONE (919)362-2573 APRIL 1994 DAY AVE DAILY POWER LEVEL DAY AVG. DAILY POWER LEVEL (MWE-NET) (MWE-NET)

-12 17

-12 18 19

-12 20 21 22 23 "12

-12 24 "6

-12 25 10 26 27 12 28 "12 13 -10 29 30 -10 15 "9 16 -10 1.16 - 8 MIS/MNTH-OPR.RPT/3/OS4

UNIT SHUTDOWNS AND POWER REDUCTION UNIT NAME: Harris DATE: 5/2/94 COMPLETED BY: S. G. Rogers TELEPHONE: (919) 362-2573 SERIAL NO.: HNP-94-039 REPORT MONTH: APRIL 1994 R~

T1 e Method No. Date y Duration a of Licensee System Component Cause 5. Corrective P (Hours) s Shutting Event Code 4 Code 5 Action to e 0 Down Report ¹ Prevent Recurrence n Reactor~

94-007 940319 1029.45 N/A ZZ ZZZZZ Unit remains in scheduled RFO5 refueling outage.

1 2 3 4 F: Forced Reason: Method: Exhibit G-Instructions S: Scheduled A-Equipment Failure (Explain) 1-Manual for Preparation of Data B-Maintenance or Test 2-Manual Scram Entry Sheets for Licensee C-Refueling 3-Automatic Scram Event Report (LER) File D-Regulatory Restriction 4-Continued (NUREG%1 61)

E-Operator Training 5 License Examination 5-Reduced Load F-Administrative 6-Other 5 G-Operational Error (Explain) Exhibit 1 - Same Source H-Other (Explain)

~cn+

CD CD tA g C o g H tA i O CO lA