ML18012A618

From kanterella
Revision as of 04:54, 22 October 2019 by StriderTol (talk | contribs) (Created page by program invented by StriderTol)
Jump to navigation Jump to search
Monthly Operating Rept for Mar 1997 for Harris Nuclear Plant,Unit 1.W/970415 Ltr
ML18012A618
Person / Time
Site: Harris Duke Energy icon.png
Issue date: 03/31/1997
From: Donahue J, Shannon Rogers
CAROLINA POWER & LIGHT CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
HNP-97-081, HNP-97-81, NUDOCS 9704210142
Download: ML18012A618 (7)


Text

CATEGORY 1 REGULAT ZNFORMATZON DZSTRZBUTZONISTEM (RZDS)

DOCKET FACIL:50-400 Shearon Harris Nuclear Power Plant, Unit 1, Carolina 05000400 AUTH.Nh."4E a ROGERS,S.

DONAHUE,J.W.

'arolina

.

AUTHOR AFFILIATION Carolina Power & Light Co.

Power 6 Light Co.

RECIP.NAME RECIPIENT AFFILIATION Monthly operati for Harris Nuclear

SUBJECT:

Plant, Unit 1. /970415 ltor Mar 1997 DISTRIBUTION CODE: IE24D COPIES RECEIVED:LTR ENCL SIZE:

TITLE: Monthly Operating Report (per Tech Specs)

.T NOTES:Application for permit renewal filed. 05000400 RECIPIENT COPIES RECIPIENT COPIES ID CODE/NAME LTTR ENCL ID CODE/NAME LTTR ENCL PD2-1 PD 1 1 LE,N 1 1 INTERNAL: ACRS 1 1 AEOD/SPD/RRAB 1 1 (FTGE CERN 1 1 NRR/DRPM/PECB 1 1 1 1 RGN2 1 1 EXTERNAL: LITCO BRYCEFJ H 1 1 NOAC 1 1 NRC PDR 1 1 D

E N

NOTE TO ALL "RIDS" RECIPIENTS:

PLEASE HELP US TO REDUCE WASTE. TO HAVE YOUR NAME OR ORGANIZATION REMOVED FROM DISTRIBUTION LISTS OR REDUCE THE NUMBER OF COPIES RECEIVED BY YOU OR YOUR ORGANIZATION, CONTACT THE DOCUMENT CONTROL DESK (DCD) ON EXTENSION 415-2083 TOTAL NUMBER OF COPIES REQUIRED: LTTR 11 ENCL 11

0 g I I

Carolina Power R Light Company Harris Nuclear Plant PO Box 165 New Hill NC 27562 APR ) 5 f997 United States Nuclear Regulatory Commission Serial: HNP-97-081 ATTENTION: Document Control Desk Washington, DC 20555 SHEARON HARRIS NUCLEAR POWER PLANT DOCKET NO. 50-400/LICENSE NO. NPF-63 MONTHLYOPERATING REPORT

Dear Sir or Madam:

In accordance with Carolina Power Ec Light Company's Harris Nuclear Plant Technical Specification 6.9.1.5, the report of operating statistics and shutdown experience for the month of March 1997 is provided.

Sincerely, J. W. Donahue Director of Site Operations Harris Plant MV Enclosure Mr. J. B. Brady - NRC Senior Resident Inspector Mr. S. D. Ebneter - NRC Regional Administrator Mr. N. B. Le - NRC Project Manager

'st7042i0 i 42 9'7033i .

PDR ADQCK 05000400

'" PDR IIIIjII:1II]II,'1II.tIIIIIIIIIIII R

State Road 1134 New Hill NC

J Enclosure to Serial HNP-97-081 Sheet l of 2 CP&L CO. PLANT PERFORMANCE DATA SYSTEM PAGE 1 RUN DATE 04/04/97 OPERATING DATA REPORT RPD36-000 RUN TIME 15:05:32 HARRIS UNIT 1 DOCKET NO. 050-400 COMPLETED BY SHEILA ROGERS OPERATING STATUS TELEPHONE (919) 362-2573

1. UNIT NAME: HARRIS UNIT 1 ) NOTES
2. REPORTING PERIOD: MARCH 97
3. LICENSED THERMAL POWER (MWT): 2775
4. NAMEPLATE RATING (GROSS MWE): 950.9 )
5. DESIGN ELECTRICAL RATING (NET MWE): 900.0 )
6. MAX DEPENDABLB CAPACITY (GROSS MWE): 920.0 )
7. MAX DEPENDABLE CAPACITY (NET MWB): 860.0
8. IF CHANGES OCCUR IN CAPACITY RATINGS (ITEMS 3 THRU 7) SINCE LAST REPORT, GIVE REASONS:
9. POWER LEVEL TO WHICH RESTRICTED IF ANY (NET MWE):
10. REASONS FOR RESTRICTION ZF ANY:

THIS YR TO, CUMUL MONTH DATE ATIVE

11. HOURS IN REPORTING PERIOD 744.00 2160.00 86929.00
12. NUMBER OF HOURS REACTOR CRITICAL 744.00 2125.34 73391.45
13. REACTOR RESERVE SHUTDOWN HRS .00 .00 .00
14. HOURS GENERATOR ON LINE 744.00 2111.76 72669.42
15. UNIT RESERVE SHUTDOWN HOURS .00 .00'" .00
16. GROSS THERMAL ENERGY GEN. (MWH) 2059505.10 5833720.44 194718053. 70
17. GROSS ELEC. ENERGY GBN (MWH) 691869. 00 1961308. 00 64828560.00
18. NET ELEC. ENERGY GENERATED (MWH) 651701. 00 1843840.00 60468579.00
19. UNIT SERVICE FACTOR 100. 00 97.77 83.60
20. UNIT AVAILABILITYFACTOR 100. 00 97.77 83.60
21. UNIT CAP. FACTOR (USING MDC NET) 101.85 99.26 80.88
22. UNIT CAP. FACTOR (USING DER NET) 97.33 94.85 77.29
23. UNIT FORCED OUTAGE RATE .00 2.23 3.30
24. SHUTDOWNS SCHED. OVER NEXT 6 MONTHS (TYPE, DATE, AND DURATION OF EACH):

Refueling outage is scheduled to begin April 5, 1997 for a duration of 40 days.

25. ZF SHUTDOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF START UP:
26. UNITS IN TEST STATUS (PRIOR TO COMMERCIAL OPERATION): FORECAST ACHIEVED INITIAL CRITICALITY INITIAL ELECTRICITY COMMERCIAL OPERATION 1.16 - 9

t rl

'

1~

a II

~ill z

Enclosure to Serial HNP-97-081 Sheet 2 of 2 CP&L CO. PLANT PERFORMANCE DATA SYSTEM PAGE 1 RUN DATE 04/04/97 APPENDIX B - AVERAGE DAILY POWER LEVEL RPD39-000 RUN TIME 15:05:32 HARRIS UNIT 1 DOCKET NO. 050-400 COMPIETED BY SHEILA ROGERS TELEPHONE (919) 362-2573 MARCH 1997 DAY AVG. DAILY POWER LEVEL DAY AVG. DAILY POWER LEVEL tMWE-NET) (MWE-NET) 868 17 880 866 18 875 874 19 881 883 20 880 874 21 875 878 22 870 884 23 880 879 881 879 25 875 10 873 26 869 876 27 878 12 881 28 875 13 878 29 861 14 870 30 869 15 881 31 875 16 884