Forwards Change 3 to Rev 2 to Plant Emergency Procedures (Pep) PEP-100,Change 3 to Rev 5 to PEP-101,including One Oversize Drawing,Rev 0 to PEP-374 & Rev 18 to PLP-201, Emergency Plan, Page 2-9a
ML18022A883
Person / Time
Site: Harris Duke Energy icon.png
Issue date: 01/08/1992
From: Richey R
CAROLINA POWER & LIGHT CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML18010A492 List:
References
CON-NRC-771 NUDOCS 9201130265
Download: ML18022A883 (17)


Text

ACCELERATED DI TIUBUTION DEMONS~TION SYSTEM P 0a PP REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)

ACCESSION NBR:9201130265 DOC.DATE: 92/01/08 NOTARIZED: NO DOCKET 40 FACIL:50-400 Shearon Harris Nuclear Power Plant, Unit 1, Carolina 05000400 AUTH. NAME AUTHOR AFFILIATION RICHEY,R.B. Carolina Power & Light Co.

RECIP.NAME RECIPIENT AFFILIATION Document Control Branch (D'ocument Control Desk)

SUBJECT:

Forwards Change 3 to Rev 2 to Plant Emergency Procedures I (PEP) PEP-100,Change 3 to Rev 5 to PEP-101,including one oversize drawing,Rev 0 to PEP-374 & Rev 18 to PLP-201, D "Emergency Plan," Page 2-9a.

DISTRIBUTION CODE: A045D COPIES RECEIVED:LTR Submittal: Emergency Preparedness Plans, I ENCL P SIZE: +

TITLE: OR Imp ement'g Procedures, C NOTES:Application for permit .renewal filed. 05000400 A

RECIPIENT COPIES RECIPIENT COPIES D ID CODE/NAME LTTR ENCL ID CODE/NAME LTTR ENCL PD2-1 PD 1 1 MOZAFARI,B. 1 1 D INTERNAL: AEOD/DOA/IRB 1 1 NRR/DREP PEPB9D 1 1 NUDOCS-ABSTRACT 1 1 BE~ - 0 1 1 EXTERNAL: NRC PDR 1 1 NSIC 1 1 D

D D

NOTE TO ALL "RIDS" RECIPIENTS:

PLEASE HELP US TO REDUCE WASTE! CONTACT THE DOCUMENT CONTROL DESK, ROOM P 1-37 (EXT. 20079) TO ELIMINATEYOUR NAME FROM DISI'RIBUTION LIPID FOR DOCUMENTS YOU DON'T NEED!

TOTAL NUMBER OF COPIES REQUIRED: LTTR 8 ENCL 8

I

(

k n

C:

1 f

CHILL Carolina Power & Light Company P.O. Box 165 ~ New Hiil, N.C. 27562 R. B. RICHEY Vice President Harris Nuctear Project JAN 8 19m.

Letter Number: HO-910251 (0)

Document Control Desk NRC-771 United States Nuclear Regulatory Commission Washington, D.C. 20555 CAROLINA POWER AND LIGHT COMPANY SHEARON HARRIS NUCLEAR POWER PLANT DOCKET NO. 50-400 LICENSE NO. NPF-63 Gentlemen:

In accordance with 10CFR50, Appendix E, Carolina Power 6 Light Company hereby transmits one copy each of recent revisions to the Shearon Harris Nuclear Power Plant emergency procedures. A list of the revisions to the plant emergency procedures is also enclosed (Attachment 1).

Very t:ruly yours, R. B. Richey Vice President Harris Nuclear Project MGW: kj c Enclosure cc: Mr. S. D. Ebneter (NRC-RII) (w/two copies of procedures)

Ms. B. L. Mozafari (NRC)

Mr. J. E. Tedrow (NRC)

MEM/H0-910251.0/1/OS1 9201130265 920108 PDR 'DOCK 05000400 F PDR

Li t

ATTACHMENT 1 CAROLINA POWER AND LIGHT COMPANY SHEARON HARRIS NUCLEAR POWER PLANT - UNIT 1 REVISIONS TO PLANT EMERGENCY PROCEDURES PROCEDURE NUMBER TITLE DATE PEP-100 Rev. 2 Emergency Action Levels 12/15/91 Change No. 3 Users Guide PEP-101, Rev. 5 Emergency Classification 12/15/91 Change No. 3 and Initial Emergency Actions PEP-374, Rev. 0 Radiological Controls for, 12/09/91 the Emergency Operations Facility PLP-201, Rev. 18 Emergency Plan 07/27/90 Page 2-9a only (Note: Page was inadvertently omitted from PLP-201, Rev. 18 transmitted August 2, 1990. Please insert page accordingly.)

MEM/H0-910251.0/2/Osl

4 (1) 2)

Vol ~ 'art Procedure Title 5

ADVANCE CEANGE POEN Proc. No. F'E F'00 c foh. cue. 5

~

Rev.

sers

~

2,

//g/g~

Change 0 u>'d8.

(3 eason or t e ange che (4) scrxptxon o t e ange re 'on u r .0 J c nr' 'on. s ee, (5) Nuehe of Procedure pages Attached (6) Verify at the Technical Specifications Procedur Cross Reference, FSAR Coamitme Cross Reference and ANSI 18 ' Commit nt Cross Reference (AP-005) ve been reviewed and all discrepanc'es found have been resolved.

OCT 1 6 199p C gate arne an xgnature If a revision is equired to the Techn cal Specification Procedure Cross Reference, verify hat a Task Change equest Form (PLP-103) has been submitted for Mana ent Approval ~-

Date gA egu atory omp nance ote: reparer may i not applicable (7) Submitted for Approval: Date OCT 1 "'99p rxgxnator s arne (8) CPH Safety Review is.'irc One requi and attached/not required o ke. gate OCT 1 6 199p roce ure oor r s arne n xgnature (9) Recommended for A roval:

cal Reviewer OCT 16 1ggp Qualified Tec am an x na e ~ate Quali:fied T chnical R viewer C lZ. Gf'bgo arne an xgnature Quality ssurance an 1gna Ori nator's Supervisor C, Gf'n. /8 /~

arne an xgnat re arne an xgnature d4

~ate nx,t

-

Remarks.'rne

( ) Final'Approval rve ~

arne xt Approved By:

c.7C&'AGRIC, e signature mvE Oy ~8

/o-/<Ho ate

~>yg (Form AP-007-4-8) on> 890

"

HNP

~.$

, ~

.%e'Ii (-' wp."eJ'meepfwl e, f ~~ma. I ep tfwc*';rreee'=.;~eee; e~+v~%~~ggwn~ve 'ree~+ g ~i~~v~I~ee''e".>r -" eeeee r .". ~ ": - ) i i~e".- r Ie "'-tire 'w' v "i"-+++'z~~>> ~ 'R 'e~e

!

i II I I l r r r, OS4

~ List of Effective Pa es Revision

~Pa e NI 1-2 2 3 AC-2/1, AC-2/2 pi 4-17 2 17a, 17b AC-2/1

,I 17c, 17d AC-2/2 r e)

IV, I I,i e e.lf

<>tt ">> w -~ i ~

&

ADVANCE CHANGE FORM i

~

Title

~ ~ a-p- Rev.~ n/

Chacga d r S (2) Procedure a s5 I 'c<<R Pert c (3) eason or t e ange v f e,c ac r Iq/cc ef fcf

' P-Clf'n.a'&AS L I LV AItecIR ppqf. n (4) escrxptzon o t e ange ~- /yd /,e wh/c/ sA' "C'cnI'rtos'~

'A<<sn AC//'cn ton. Cether't(V<<' for ) IO tvtlnq flttds 5 t Ie Frster EIAL <<z)(ch.'R<<I<<.'<<

r " 7h

'o>>q<<III F ytqRr, "

s orccclq "<<) '4 c) <<efr c sre/yrwd r/

"

/'/I recJ "c'csgh'~pen ~

C)$

urt( ~ lost orq s'Iqt/Id& cr n r t E L )(cth.I>>cue Ccrfec e )s t c t rhftt>IA.

(8) Neater of Procedure pages Attached R s'gtf'~kar (6) Verify that the Technical Specifications Procedure Cross Reference, FSAR Coamitment Cross Reference and ANSI 18.7 Commitment Cross Reference (AP-005) have been reviewed and all discrepancies found have been resolved.

r/7 arne an xgnature Date 2-//-1/

If a revision is required to the Technical Specification Procedure Cross Reference, verify that a Task Change Request Form (PLP-103) has been submitted for Management Approval..

QA egu atory omp rance ote: reparer may 1 not applicable (7) Submitted for Approval: TN 'Icckel" Date 2,-II-c( I rxgxnator s arne (8) CP&i Safety Review is: (Circ(a Cce) requ'red d attached/uot required

~

ocker Date 2-//-q l roce ure oor xn r s arne an signature (9) Recommended for Approval:

Qualified Technical Reviewer M t/oker arne an

.M /3@c:M 2-/

ate

-//

Quali.fied Technical Reviewer C R. Gs'iso n arne an xgnature Qua1.ity Assurance gA arne an xgnat ~ate 8 Originator's Supervisor 8ibs c.i arne an

(

agnature ~pe,/

Fl fs F'rokecfl'on. gA ply nest arne an xgnature ~ate (10) Final'pproval Approved By.

s EFFECT fVE FEB f Z.-/2v/

j f9gf x natur ~ate Remarks.'rne ate G-w I

(Form AP-007-4-8) done urI"e~</ Iv 4 Jue. Ho r I/e d Auntie ha lr'y hav'n Bo r'~

no rnIpac acf o>>I Fife P>>orwcr>>'o>>p

>>I ~ I

I 4 OS4 t l List of Effective Pa es

~Pa e Revision 1, 2 AC-5/1, AC-5/2 4 - 8 AC-5/1, AC-5/2 10 PEP-101 Rev. 5 Page 3 of 10

)~

)

l

. ~